Engineering guide
For offline speech feature scope, map costs to work packages, deliverables and external inputs as shown below. This defines scope rather than a lump-sum price, fixed schedule, payment terms or default charging rules.
Work packages and deliverables
Swipe the table horizontally to view all columns.
| Work package | Deliverables to agree | External inputs and scope |
|---|---|---|
| Feature interfaces | Wake, ASR and TTS module inventory and calling states | Agree selected capabilities, languages and component licenses |
| Platform and audio integration | Target audio path, permissions and error handling | Itemize devices, microphones, speakers and system changes |
| Verification and deployment | Records for fixed recordings/text, offline operation and cancellation | Assign activation, resource distribution, update and maintenance responsibilities |
What inputs are needed before starting?
Target platform, audio path, SDK licenses, authorized recordings, vocabulary or fixed text, and network constraints. Check document versions and availability first and retain missing items as unresolved inputs.
How should delivery and acceptance be defined?
On the target device test audio input, recognition events, synthesized output and audible playback separately; record online, offline and cancellation results. A TTS case does not establish ASR or wake-word capability; integration does not establish recognition performance in every setting.
Enterprises in Hefei, China, can submit these inputs for remote review. Agree prototype integration, sample shipment, site work and associated costs for the specific project.
Review the service scope and submit the project inputs before agreeing on development and delivery. Original Chinese service scope
Online
Phone
WeChat
Top