4G Connectivity · Custom Development for Enterprises

4G Cold Chain Temperature and Humidity Logger Development

For cold chain equipment manufacturers, logistics platform companies and transportation operation companies, we develop probe access, timestamp recording, over-limit events, offline storage, supplementary transmission, transportation batch association and report export.

Logistics cold chain and asset management terminalSoftware, hardware and system integration testingPhased delivery

SERVICE OVERVIEW

Service overview

4G Cold chain temperature and humidity recorder is developed for enterprise projects that require "temperature recording and abnormal notification for cold chain transportation". Winge Technology carries out the docking of terminal hardware, embedded software and business systems based on existing equipment and target functions, forming design data and programs that can be used for subsequent integration testing, deployment and maintenance.

  • Device and interface access
  • Product business functions
  • Platform and data connection
  • Exception handling and operational constraints

DEVELOPMENT SCOPE

Development services

Development Scope

01

Device and interface access

Connect the temperature and humidity probe and configure the sampling period, time source, over-limit threshold, batch number and local storage capacity.

02

Product business functions

Develop probe access, timestamp recording, over-limit events, offline storage, supplementary transmission, transportation batch correlation and report export.

03

Platform and data connection

Combined with the business links of sensing and positioning → event and batch records → 4G → trajectory and environment management → disposal and traceability, the device identity, data fields, update time, abnormal status and result confirmation method are defined.

04

Exception handling and operational constraints

Data record integrity and temperature measurement errors must be accepted separately; traceability information must be retained on probe location, calibration and transportation processes.

Data and Operational Workflow

Transport batch binding → Continuous sampling and storage → 4G reporting → Over-limit event confirmation → Temperature curve and batch report.

The device side, communication side and platform side retain necessary status and logs respectively. Project integration testing is checked with actual equipment data and execution results, and network connection status and business completion status are recorded separately.

Project Inputs

  • Existing device models, interface and wiring diagrams, licensing agreements, data samples and available codes.
  • Business processes and parameters: probe calibration, sampling interval, batch number and offline recording duration.
  • Target location, operator, SIM/APN, power supply, installation method and equipment size.
  • Existing platform interfaces, user roles, development modules, number of prototypes and planned nodes.

Deliverables and Acceptance

DeliverablesDelivery contentVerification method
product realizationHardware design data, prototypes or existing equipment modification data involved in the project, as well as corresponding firmware and interfacesCheck the reading and time against a reference meter.
Business integration testingData fields, status definitions, platform adaptation procedures and business integration testing recordsTest offline recording, full storage and supplementary transmission.
Version and test dataTarget hardware and software versions, build or deployment instructions, parameter configurations and test logsValidate overrun duration, recovery, and reporting fields.

First confirm the scope and key functions, then complete prototype or software development, system integration testing and stage acceptance. The acceptance conditions list the prototype, version, environment, duration and passing threshold; source code, design documents, third-party licenses, materials, traffic, cloud resources and on-site work are agreed separately.

Frequently Asked Questions

Will the records be lost if there is no signal during transportation?

You can design local storage according to the agreed capacity and make up for the transmission after the network is restored. It is necessary to clarify the maximum offline duration, sampling interval, capacity exhaustion strategy and power outage data protection, and then confirm it through testing.

Can I entrust only part of the functions of the cold chain temperature and humidity recorder?

The device interface, terminal program, 4G communication and platform integration testing can be split based on the existing R&D foundation. Please provide existing data and target boundaries, first check "probe calibration, sampling interval, batch number and offline recording duration", and then clarify the deliverables and interface responsibilities of each module.

How are costs and cycle time assessed?

Split the workload based on target devices, interfaces, existing data, and verification criteria. This project focuses on checking the probe calibration, sampling interval, batch number and offline recording time; when prototypes, on-site integration testing or third-party platform cooperation are required, the corresponding costs, prerequisites and nodes will be listed separately.

PROJECT DELIVERY

From requirements to delivery

01

Requirements review

Confirm business goals, existing devices and systems, interfaces and deployment conditions.

02

Scope and solution

Review technical dependencies and agree responsibilities, deliverables and acceptance methods.

03

Development and integration

Implement the agreed scope and integrate with the target devices and systems.

04

Testing and issue resolution

Run agreed test cases and record issues, fixes and regression results.

05

Handover and acceptance

Deliver the agreed work, build configurations, interface documentation and test records.

06

Maintenance and changes

Handle version maintenance and assess new requirements within the agreed support scope.

Define Devices, Interfaces and Deliverables

Please provide the target functions, existing equipment information and usage environment of the 4G cold chain temperature and humidity recorder, focusing on the probe calibration, sampling interval, batch number and offline recording time, so as to facilitate the determination of the technical scope and stage delivery arrangements.

Discuss 4G Development
Online
Phone
13910119357
WeChat
WhatsApp
Winge Technology WhatsApp QR code Scan or click to contact us
Top