Development Scope
Scope and Basic Check
Determine the existing foundation, technical dependencies and content that needs to be developed based on the command list, permissions, validity period, execution conditions, feedback signals and local control priorities.
Implementation and integration
Establish command identification and state machine to complete reception verification, deduplication, execution, result acknowledgment, query and operation log.
Delivery Documentation
Deliver command specifications and verification records such as timeouts, duplications, and lost connections.
Verification and Constraints
Local interlocking, emergency stop and necessary protection are performed according to system responsibilities, and remote instructions cannot bypass the established restrictions.
Project implementation process
Verification of data and interfaces → Confirmation of technical solutions and verification use cases → Implementation of integration with the target environment → Regression of abnormal scenarios → Transfer of version data.
Verify the implementation results in the target hardware and software environment, and deliver records of associated interface configurations, version dependencies, and problem handling to facilitate subsequent integration and maintenance by the enterprise R&D team.
Project Inputs
- Command list, permissions, validity period, execution conditions, feedback signals and local control priority.
- Design information, code, interface permissions and target test equipment can be provided.
- Source files, programs or tools expected to be delivered, inter-module integration testing responsibilities and project nodes.
- Acceptance samples, environment, test conditions and passing thresholds.
Deliverables and Acceptance
| Deliverables | Delivery content | Verification method |
|---|---|---|
| achieve results | Deliver command specifications and verification records such as timeouts, duplications, and lost connections. | Test for expired, duplicate and over-the-top commands. |
| Integrated data | Versions and dependencies, interface configuration, usage or deployment steps, and integration changes | Validation execution timeout conflicts with feedback. |
| Verify records | Test conditions, execution records, problem lists and regression results | Check lost contact, restart and result re-reporting. |
The delivery scope and acceptance criteria are determined based on the target environment. Third-party SDK, licenses, laboratories, cloud resources, equipment materials and on-site support are listed separately; when the existing information is insufficient, follow-up work will be determined through interface verification or key function verification.
Frequently Asked Questions
How to judge when a remote control is truly completed?+
Record platform sending, terminal acceptance, execution start and on-site feedback respectively. Confirm completion with the agreed execution feedback, and provide queryable results for timeouts, rejections, and status inconsistencies.
4G What information do I need to provide first to develop remote commands and execution acknowledgments?+
Please give priority to providing the command list, permissions, validity period, execution conditions, feedback signals and local control priority. At the same time, the existing implementation, problems encountered, expected changes, and compatible test conditions are explained to facilitate the determination of implementation scope and reproduction methods.
Can it be implemented on existing products?+
You can first evaluate the scope of existing designs and versions that can be changed, retain the verified parts, and determine the interfaces and dependencies that need to be adjusted. This service requires attention: local interlocking, emergency stop and necessary protection are performed according to system responsibilities, and remote instructions cannot bypass the established restrictions. Existing and new functions must undergo regression testing within the agreed scope after the changes.