4G Connectivity · Custom Development for Enterprises

4G Solar PV Data Acquisition Gateway Development

For photovoltaic equipment companies, energy management platform companies and power station operation and maintenance integrators, it adapts inverter and meter protocols, develops power generation, operating status, fault collection, multi-device polling and platform data synchronization.

Energy equipment networking and operation and maintenanceSoftware, hardware and system integration testingPhased delivery

SERVICE OVERVIEW

Service overview

4G Photovoltaic data collection gateway is developed for enterprise projects where "distributed photovoltaic sites require centralized operation and maintenance". Winge Technology carries out the docking of terminal hardware, embedded software and business systems based on existing equipment and target functions, forming design data and programs that can be used for subsequent integration testing, deployment and maintenance.

  • Device and interface access
  • Product business functions
  • Platform and data connection
  • Exception handling and operational constraints

DEVELOPMENT SCOPE

Development services

Development Scope

01

Device and interface access

Adapt the authorization agreement of the inverter and electric meter, configure the device address, power generation rate, operating status, fault code and collection cycle.

02

Product business functions

Adapt inverter and meter protocols, develop power generation, operating status, fault collection, multi-device polling and platform data synchronization.

03

Platform and data connection

Combined with the business link of main controller and instrument → data and order status → 4G → enterprise operation platform → operation and maintenance processing, the device identity, data fields, update time, abnormal status and result confirmation method are defined.

04

Exception handling and operational constraints

The cumulative amount of power generation and periodic power need to be unified; the writing and control of equipment parameters should list the authority and scope of influence separately.

Data and Operational Workflow

Inverter and meter reading → data normalization → cache → 4G reporting → site power generation statistics and operation and maintenance alarms.

The device side, communication side and platform side retain necessary status and logs respectively. Project integration testing is checked with actual equipment data and execution results, and network connection status and business completion status are recorded separately.

Project Inputs

  • Existing device models, interface and wiring diagrams, licensing agreements, data samples and available codes.
  • Business process and parameters: inverter model, power generation rate, fault code and multi-device polling.
  • Target location, operator, SIM/APN, power supply, installation method and equipment size.
  • Existing platform interfaces, user roles, development modules, number of prototypes and planned nodes.

Deliverables and Acceptance

DeliverablesDelivery contentVerification method
product realizationHardware design data, prototypes or existing equipment modification data involved in the project, as well as corresponding firmware and interfacesCheck the inverter power, charge and fault fields.
Business integration testingData fields, status definitions, platform adaptation procedures and business integration testing recordsTest multi-device collection timeout and reconnection.
Version and test dataTarget hardware and software versions, build or deployment instructions, parameter configurations and test logsVerify cross-day statistics, make up for network outages, and replace equipment.

First confirm the scope and key functions, then complete prototype or software development, system integration testing and stage acceptance. The acceptance conditions list the prototype, version, environment, duration and passing threshold; source code, design documents, third-party licenses, materials, traffic, cloud resources and on-site work are agreed separately.

Frequently Asked Questions

Can it be connected to inverters of multiple brands?

It is necessary to obtain the protocol and test equipment according to the model, and establish field and fault code mapping respectively. Even if the interfaces are the same, the address definition, magnification and write permissions may be different, requiring integration testing on a model-by-model basis.

Can I entrust only part of the functions of the photovoltaic data collection gateway?

The device interface, terminal program, 4G communication and platform integration testing can be split based on the existing R&D foundation. Please provide existing information and target boundaries, first check the "inverter model, power generation rate, fault code and multi-device polling", and then clarify the deliverables and interface responsibilities of each module.

How are costs and cycle time assessed?

Split the workload based on target devices, interfaces, existing data, and verification criteria. This project focuses on checking the inverter model, power generation rate, fault code and multi-device polling; when prototypes, on-site integration testing or third-party platform cooperation are required, the corresponding costs, prerequisites and nodes will be listed separately.

PROJECT DELIVERY

From requirements to delivery

01

Requirements review

Confirm business goals, existing devices and systems, interfaces and deployment conditions.

02

Scope and solution

Review technical dependencies and agree responsibilities, deliverables and acceptance methods.

03

Development and integration

Implement the agreed scope and integrate with the target devices and systems.

04

Testing and issue resolution

Run agreed test cases and record issues, fixes and regression results.

05

Handover and acceptance

Deliver the agreed work, build configurations, interface documentation and test records.

06

Maintenance and changes

Handle version maintenance and assess new requirements within the agreed support scope.

Define Devices, Interfaces and Deliverables

Please provide the target functions, existing equipment information and usage environment of the 4G photovoltaic data collection gateway, focusing on the inverter model, power generation rate, fault code and multi-device polling to facilitate the determination of the technical scope and stage delivery arrangements.

Discuss 4G Development
Online
Phone
13910119357
WeChat
WhatsApp
Winge Technology WhatsApp QR code Scan or click to contact us
Top