Engineering guide
For MCU acquisition terminal signal definition procurement, check the inputs, evidence and unresolved items below before selecting an approach. Assign owners and acquisition methods for missing documents; a demonstration alone does not establish compatibility or performance.
Procurement checklist
Swipe the table horizontally to view all columns.
| Item | Inputs and checks | Decision boundary |
|---|---|---|
| Measurement objective | Specify quantity, range, units and reference method | A sensor specification is not the accuracy of the entire chain |
| Sensor output | Check analog or digital interface, power, raw format and error outputs | Use device documentation to determine conditioning, isolation or excitation needs |
| MCU input and timing | Check electrical limits, resources, sampling and reporting for the exact MCU | A family name does not replace checks of the exact ADC, pins and clocks |
What inputs are needed before starting?
Exact sensor and MCU models, signal ranges and units, interfaces and power, sampling targets and reference equipment. Check document versions and availability first and retain missing items as unresolved inputs.
How should delivery and acceptance be defined?
For each channel check raw and converted values, units, time source and error states; bind accuracy conclusions to reference equipment and test conditions separately. Communication, reporting rate and display refresh do not establish measurement accuracy; verify hardware and reference methods separately.
Enterprises in Nanjing, China, can submit these inputs for remote review. Agree prototype integration, sample shipment, site work and associated costs for the specific project.
Review the service scope and submit the project inputs before agreeing on development and delivery. Original Chinese service scope
Online
Phone
WeChat
Top