IoT · Engineering Services for Businesses

IoT Communication Development

Connect equipment electrical interfaces, communication protocols and network services to complete message parsing, message conversion, connection recovery and two-way data integration testing.

System solutionSoftware and hardware integration testingstaged delivery

Project Inputs

Information is used to determine interfaces, implementation conditions, and scope of work.

  • Existing motherboard interfaces, voltages, connectors and space dimensions
  • Modbus register table, device address and function code
  • Register table, device address, connection parameters and polling cycle

Deliverables and Acceptance

Delivery Documentation
Communication board design data, firmware and interface test records, protocol code, register mapping, message samples and test records, conversion procedures, mapping configuration and device-to-platform integration testing records.
Versions and Reproducibility
The delivery list records the target hardware, software version, build or deployment steps, interface configuration and test records to facilitate subsequent integration testing and maintenance.
  • Check pin definitions, logic levels and transmit and receive timings
  • Check registers, numerical conversions, and reading and writing results item by item
  • Check register to platform field conversion

The acceptance is carried out based on the equipment, version, environment, samples and indicators confirmed by both parties; the scope of source code and design documents, prototype materials, third-party fees and subsequent maintenance are listed in the project documents.

Frequently Asked Questions

Can I delegate only one of the development modules?

Yes. RS-485, CAN and Ethernet Communication Board Development, Modbus RTU and TCP Protocol Development, Modbus-to-MQTT Protocol Gateway Development can be scoped separately. Define the interfaces and integration responsibilities between modules before development.

Does adding a communication board require changes to the main board?

An add-on board can be evaluated when interfaces, power capacity and mounting space are available. Otherwise, the main-board interface or mechanical design may need changes. Schematics and prototypes establish the modification scope first.

Discuss Your Project

Define the Scope with Your Device and Interface Information

Please provide target functions, existing equipment or code, interface protocols, deployment environment and planned milestones to facilitate assessment of workload and stage delivery arrangements.

Discuss IoT Development
Online
Phone
13910119357
WeChat
WhatsApp
Winge Technology WhatsApp QR code Scan or click to contact us
Top