IoT · Engineering Services for Businesses
Edge Computing Unit Requirements and Architecture Design
Sort out the field interfaces, computing tasks, resources and deployment constraints of edge devices, and define system selection, data flow, service management and acceptance conditions.
Development Scope
Sort out the field interfaces, computing tasks, resources and deployment constraints of edge devices, and define system selection, data flow, service management and acceptance conditions.
Embedded Linux BSP and Device Application Integration
Adapt boot, device trees, peripheral drivers and application services using the designated development board and SDK.
Explore Scope and Deliverables →Edge Gateways and Existing Equipment IntegrationGateway Offline Buffering and Resumable Data Uploads
Implement persistent queues, message sequence numbers, resumable uploads, deduplication and storage-capacity policies.
Explore Scope and Deliverables →Edge Gateways and Existing Equipment IntegrationGateway Remote Configuration and Application Management
Develop gateway enrollment, remote configuration, service status, log retrieval and application updates.
Explore Scope and Deliverables →Project Inputs
Information is used to determine interfaces, implementation conditions, and scope of work.
- Processor, board version, manufacturer SDK and kernel version
- Data rate, offline duration, and available storage capacity
- Gateway hardware, system, process or container operation mode
Deliverables and Acceptance
- Delivery Documentation
- Patches, images or build packages, deployment instructions and board-level verification records, cache modules, configuration instructions and test records for network and power outages, management agents, server interfaces, operation and maintenance pages and upgrade test records.
- Versions and Reproducibility
- The delivery list records the target hardware, software version, build or deployment steps, interface configuration and test records to facilitate subsequent integration testing and maintenance.
- Verify the identification, reading and writing of the startup link and target peripherals
- Check the integrity of records before and after offline according to the message sequence number
- Check configuration delivery, validity and failure receipts
The acceptance is carried out based on the equipment, version, environment, samples and indicators confirmed by both parties; the scope of source code and design documents, prototype materials, third-party fees and subsequent maintenance are listed in the project documents.
Frequently Asked Questions
Can I delegate only one of the development modules?
Yes. Embedded Linux BSP and Device Application Integration, Gateway Offline Buffering and Resumable Data Uploads, Gateway Remote Configuration and Application Management can be scoped separately. Define the interfaces and integration responsibilities between modules before development.
Can an application move directly from a development board to a custom board?
Boot, power, device trees and peripheral drivers must be verified on the custom board before application migration. Development-board results do not replace interface or stability testing on the custom hardware.
Discuss Your Project
Define the Scope with Your Device and Interface Information
Please provide target functions, existing equipment or code, interface protocols, deployment environment and planned milestones to facilitate assessment of workload and stage delivery arrangements.
Online
Phone
WeChat
Top