4G Connectivity · Custom Development for Enterprises

4G Building Energy Data Collector Development

Targeted at energy consumption management platform companies, meter manufacturers and building integrators, it adapts to water, electricity, heat and other meters, and develops equipment address management, scheduled reading, usage conversion, sub-item statistics and abnormal usage prompts.

Networking of buildings and municipal facilitiesSoftware, hardware and system integration testingPhased delivery

SERVICE OVERVIEW

Service overview

The 4G building energy consumption collector is developed for enterprise projects that require unified statistics of energy consumption in dispersed rooms or facilities. Winge Technology carries out the docking of terminal hardware, embedded software and business systems based on existing equipment and target functions, forming design data and programs that can be used for subsequent integration testing, deployment and maintenance.

  • Device and interface access
  • Product business functions
  • Platform and data connection
  • Exception handling and operational constraints

DEVELOPMENT SCOPE

Development services

Development Scope

01

Device and interface access

Adapt to water, electricity, heat and other meters, and establish the corresponding relationship between floors, areas, equipment addresses, magnifications and statistical periods.

02

Product business functions

Adapt to water, electricity, heat and other meters, and develop equipment address management, scheduled reading, usage conversion, sub-item statistics and abnormal usage prompts.

03

Platform and data connection

Combined with the business links of field instruments and facilities → local rules or collection → 4G → group management → inspection and service tasks, the device identity, data fields, update time, abnormal status and result confirmation method are defined.

04

Exception handling and operational constraints

The statistical results depend on the measurement equipment and mapping caliber; processing records need to be kept for table replacement, reset, missing measurement and cross-cycle supplementary reporting.

Data and Operational Workflow

Multi-table polling → Data verification and freezing → 4G reporting → Itemized usage statistics → Exception prompts and reports.

The device side, communication side and platform side retain necessary status and logs respectively. Project integration testing is checked with actual equipment data and execution results, and network connection status and business completion status are recorded separately.

Project Inputs

  • Existing device models, interface and wiring diagrams, licensing agreements, data samples and available codes.
  • Business processes and parameters: meter multiplication, area mapping, usage cycle and meter replacement records.
  • Target location, operator, SIM/APN, power supply, installation method and equipment size.
  • Existing platform interfaces, user roles, development modules, number of prototypes and planned nodes.

Deliverables and Acceptance

DeliverablesDelivery contentVerification method
product realizationHardware design data, prototypes or existing equipment modification data involved in the project, as well as corresponding firmware and interfacesCheck meter reading, magnification and zone mapping.
Business integration testingData fields, status definitions, platform adaptation procedures and business integration testing recordsTest the statistics at the freezing time point and after supplementary reporting.
Version and test dataTarget hardware and software versions, build or deployment instructions, parameter configurations and test logsVerify table replacement, device offline and address conflicts.

First confirm the scope and key functions, then complete prototype or software development, system integration testing and stage acceptance. The acceptance conditions list the prototype, version, environment, duration and passing threshold; source code, design documents, third-party licenses, materials, traffic, cloud resources and on-site work are agreed separately.

Frequently Asked Questions

How does the energy consumption platform handle the accumulated amount after meter replacement?

Keep the table replacement time, old table bottom, and new table initial value associated with the device, and then calculate the usage according to statistical rules. Avoid directly treating smaller readings from the new meter as negative usage or re-accumulation.

Can I entrust only part of the functions of the building energy consumption collector?

The device interface, terminal program, 4G communication and platform integration testing can be split based on the existing R&D foundation. Please provide existing data and target boundaries, first check "meter multiplication, area mapping, usage cycle and meter replacement records", and then clarify the deliverables and interface responsibilities of each module.

How are costs and cycle time assessed?

Split the workload based on target devices, interfaces, existing data, and verification criteria. This project focuses on checking meter magnification, area mapping, usage cycle and meter replacement records; when prototypes, on-site integration testing or third-party platform cooperation are required, the corresponding costs, prerequisites and nodes will be listed separately.

PROJECT DELIVERY

From requirements to delivery

01

Requirements review

Confirm business goals, existing devices and systems, interfaces and deployment conditions.

02

Scope and solution

Review technical dependencies and agree responsibilities, deliverables and acceptance methods.

03

Development and integration

Implement the agreed scope and integrate with the target devices and systems.

04

Testing and issue resolution

Run agreed test cases and record issues, fixes and regression results.

05

Handover and acceptance

Deliver the agreed work, build configurations, interface documentation and test records.

06

Maintenance and changes

Handle version maintenance and assess new requirements within the agreed support scope.

Define Devices, Interfaces and Deliverables

Please provide the target function, existing equipment information and usage environment of the 4G building energy consumption collector, focusing on the meter multiplication rate, area mapping, usage cycle and meter replacement record, so as to facilitate the determination of the technical scope and phased delivery arrangements.

Discuss 4G Development
Online
Phone
13910119357
WeChat
WhatsApp
Winge Technology WhatsApp QR code Scan or click to contact us
Top