4G Connectivity · Custom Development for Enterprises

4G EV Charger Communication and Control Board Development

For charging equipment manufacturers, charging operation platform companies and system integrators, it connects charging main controller, metering and operation platforms, develops networking, transaction status synchronization, fault reporting and upgrades; charging power control is determined by interface.

Energy equipment networking and operation and maintenanceSoftware, hardware and system integration testingPhased delivery

SERVICE OVERVIEW

Service overview

4G The EV charger communication control board is developed for enterprise projects where "charging equipment needs to be connected to the operation platform". Winge Technology carries out the docking of terminal hardware, embedded software and business systems based on existing equipment and target functions, forming design data and programs that can be used for subsequent integration testing, deployment and maintenance.

  • Device and interface access
  • Product business functions
  • Platform and data connection
  • Exception handling and operational constraints

DEVELOPMENT SCOPE

Development services

Development Scope

01

Device and interface access

Adapt the charging master control and meter interface to establish the corresponding relationship between device identity, connection status, order number, power and fault fields.

02

Product business functions

Connect the charging main controller, meter and operation platform to develop networking, transaction status synchronization, fault reporting and upgrades; charging power control is determined separately according to the interface.

03

Platform and data connection

Combined with the business link of main controller and instrument → data and order status → 4G → enterprise operation platform → operation and maintenance processing, the device identity, data fields, update time, abnormal status and result confirmation method are defined.

04

Exception handling and operational constraints

Communication board development is defined separately from power loop and electrical protection; order status should be checked with on-site execution, and protocol version and payment interface are confirmed by the project.

Data and Operational Workflow

Platform order → Communication board transfers to the main controller → Charging status and power return → Transaction end confirmation → Abnormal order verification.

The device side, communication side and platform side retain necessary status and logs respectively. Project integration testing is checked with actual equipment data and execution results, and network connection status and business completion status are recorded separately.

Project Inputs

  • Existing device models, interface and wiring diagrams, licensing agreements, data samples and available codes.
  • Business processes and parameters: master control and platform protocols, order fields, power caliber and abnormal transaction verification.
  • Target location, operator, SIM/APN, power supply, installation method and equipment size.
  • Existing platform interfaces, user roles, development modules, number of prototypes and planned nodes.

Deliverables and Acceptance

DeliverablesDelivery contentVerification method
product realizationHardware design data, prototypes or existing equipment modification data involved in the project, as well as corresponding firmware and interfacesCheck the order number, start and end time and battery capacity.
Business integration testingData fields, status definitions, platform adaptation procedures and business integration testing recordsTest disconnection, reconnection and repeated startup messages.
Version and test dataTarget hardware and software versions, build or deployment instructions, parameter configurations and test logsVerify charging failure, end of receipt and order reimbursement.

First confirm the scope and key functions, then complete prototype or software development, system integration testing and stage acceptance. The acceptance conditions list the prototype, version, environment, duration and passing threshold; source code, design documents, third-party licenses, materials, traffic, cloud resources and on-site work are agreed separately.

Frequently Asked Questions

Can the existing charging master controller be added to the operation platform?

Communication boards or firmware can be developed based on the main controller open interface. It is necessary to clarify the main controller state machine, platform protocol, order fields, authentication and upgrade responsibilities, and first complete the joint verification of the device and platform.

Can I entrust only part of the functions of the EV charger communication control panel?

The device interface, terminal program, 4G communication and platform integration testing can be split based on the existing R&D foundation. Please provide existing information and target boundaries, first check "main controller and platform protocols, order fields, power caliber and abnormal transaction verification", and then clarify the deliverables and interface responsibilities of each module.

How are costs and cycle time assessed?

Split the workload based on target devices, interfaces, existing data, and verification criteria. This project focuses on checking the main controller and platform protocols, order fields, power calibers, and abnormal transactions; when prototypes, on-site integration testing, or third-party platform cooperation are required, the corresponding costs, prerequisites, and milestones will be listed separately.

PROJECT DELIVERY

From requirements to delivery

01

Requirements review

Confirm business goals, existing devices and systems, interfaces and deployment conditions.

02

Scope and solution

Review technical dependencies and agree responsibilities, deliverables and acceptance methods.

03

Development and integration

Implement the agreed scope and integrate with the target devices and systems.

04

Testing and issue resolution

Run agreed test cases and record issues, fixes and regression results.

05

Handover and acceptance

Deliver the agreed work, build configurations, interface documentation and test records.

06

Maintenance and changes

Handle version maintenance and assess new requirements within the agreed support scope.

Define Devices, Interfaces and Deliverables

Please provide the target functions, existing equipment information and usage environment of the 4G EV charger communication control board, focusing on the main controller and platform protocols, order fields, power caliber and abnormal transaction verification, so as to facilitate the determination of technical scope and stage delivery arrangements.

Discuss 4G Development
Online
Phone
13910119357
WeChat
WhatsApp
Winge Technology WhatsApp QR code Scan or click to contact us
Top