Development Scope
Scope and Basic Check
Determine the existing foundation, technical dependencies and content that needs to be developed based on the prototype version, usage location, modules and firmware, SIM operators, test conditions and passing thresholds.
Implementation and integration
Develop a reproducible test matrix, covering normal connections, network abnormalities, power supply changes, power consumption and long-term operation, to locate problems and return them.
Delivery Documentation
Delivery plans, logs and reports.
Verification and Constraints
Functional testing, laboratory special testing and certification results are recorded separately, and limited sample results cannot be extrapolated to all networks and environments.
Project implementation process
Verification of data and interfaces → Confirmation of technical solutions and verification use cases → Implementation of integration with the target environment → Regression of abnormal scenarios → Transfer of version data.
Verify the implementation results in the target hardware and software environment, and deliver records of associated interface configurations, version dependencies, and problem handling to facilitate subsequent integration and maintenance by the enterprise R&D team.
Project Inputs
- Prototype version, usage location, modules and firmware, SIM operators, test conditions and pass thresholds.
- Design information, code, interface permissions and target test equipment can be provided.
- Source files, programs or tools expected to be delivered, inter-module integration testing responsibilities and project nodes.
- Acceptance samples, environment, test conditions and passing thresholds.
Deliverables and Acceptance
| Deliverables | Delivery content | Verification method |
|---|---|---|
| achieve results | Delivery plans, logs and reports. | Keep each prototype version and original log. |
| Integrated data | Versions and dependencies, interface configuration, usage or deployment steps, and integration changes | Records reconnections, restarts, and unrecovered failures. |
| Verify records | Test conditions, execution records, problem lists and regression results | Pass or fail conclusions are given based on indicators and sample range. |
The delivery scope and acceptance criteria are determined based on the target environment. Third-party SDK, licenses, laboratories, cloud resources, equipment materials and on-site support are listed separately; when the existing information is insufficient, follow-up work will be determined through interface verification or key function verification.
Frequently Asked Questions
How does the communication test form a report that can be used for acceptance?+
The report needs to list the device, version, network, location, duration, data size and threshold, and attach original records and failed use cases. Just showing a "working fine" screenshot is not enough to illustrate the scope of stability.
4G What information do I need to provide first for complete machine communication and reliability testing services?+
Please give priority to providing the prototype version, usage location, module and firmware, SIM operator, test conditions and pass threshold. At the same time, the existing implementation, problems encountered, expected changes, and compatible test conditions are explained to facilitate the determination of implementation scope and reproduction methods.
Can it be implemented on existing products?+
You can first evaluate the scope of existing designs and versions that can be changed, retain the verified parts, and determine the interfaces and dependencies that need to be adjusted. Please note that for this service: functional testing, laboratory special testing and certification results are recorded separately, and limited sample results cannot be extrapolated to all networks and environments. Existing and new functions must undergo regression testing within the agreed scope after the changes.
Online
Phone
WeChat
Top