4G Connectivity · Custom Development for Enterprises

4G Electronic Lock and Electronic Seal Development

For logistics lock companies, sealing product companies and equipment operation platform companies, develop lock control interfaces, lock status feedback, anti-tamper events, identity verification, instruction timeliness verification, authority management and operation traceability.

Logistics cold chain and asset management terminalSoftware, hardware and system integration testingPhased delivery

SERVICE OVERVIEW

Service overview

4G The development of electronic locks and electronic seals is aimed at enterprise projects where "logistics seals need to record authorized unlocking and disassembly". Winge Technology carries out the docking of terminal hardware, embedded software and business systems based on existing equipment and target functions, forming design data and programs that can be used for subsequent integration testing, deployment and maintenance.

  • Device and interface access
  • Product business functions
  • Platform and data connection
  • Exception handling and operational constraints

DEVELOPMENT SCOPE

Development services

Development Scope

01

Device and interface access

Develop lock control driver, lock state, anti-tamper and identity verification interface, design instruction validity period, local feedback and abnormal power supply handling.

02

Product business functions

Develop lock control interface, lock status feedback, anti-tamper events, identity verification, command timeliness verification, authority management and operation traceability.

03

Platform and data connection

Combined with the business links of sensing and positioning → event and batch records → 4G → trajectory and environment management → disposal and traceability, the device identity, data fields, update time, abnormal status and result confirmation method are defined.

04

Exception handling and operational constraints

The fact that the platform has sent a command does not mean that the mechanical lock has been activated. The unlocking result should be based on the lock status and agreed feedback; it should be confirmed separately through offline authorization.

Data and Operational Workflow

Authorization application → Platform permission verification → 4G command → Local execution verification → Lock status feedback → Operation record.

The device side, communication side and platform side retain necessary status and logs respectively. Project integration testing is checked with actual equipment data and execution results, and network connection status and business completion status are recorded separately.

Project Inputs

  • Existing device models, interface and wiring diagrams, licensing agreements, data samples and available codes.
  • Business processes and parameters: lock driver, lock status feedback, anti-tamper events and instruction validity period.
  • Target location, operator, SIM/APN, power supply, installation method and equipment size.
  • Existing platform interfaces, user roles, development modules, number of prototypes and planned nodes.

Deliverables and Acceptance

DeliverablesDelivery contentVerification method
product realizationHardware design data, prototypes or existing equipment modification data involved in the project, as well as corresponding firmware and interfacesTest authorization, override and expired commands.
Business integration testingData fields, status definitions, platform adaptation procedures and business integration testing recordsVerify mechanical jamming, inconsistent lock status and tamper-evident events.
Version and test dataTarget hardware and software versions, build or deployment instructions, parameter configurations and test logsTest the command deduplication after power off and reconnection.

First confirm the scope and key functions, then complete prototype or software development, system integration testing and stage acceptance. The acceptance conditions list the prototype, version, environment, duration and passing threshold; source code, design documents, third-party licenses, materials, traffic, cloud resources and on-site work are agreed separately.

Frequently Asked Questions

How does the platform confirm that the lock has been opened?

The terminal needs to read the lock state or agreed execution feedback and associate the command identifier with the result. Record the status of stuck, timeout and feedback conflicts respectively to avoid relying solely on network delivery as the basis for successful unlocking.

Can I entrust only part of the functions of electronic locks and electronic seals?

The device interface, terminal program, 4G communication and platform integration testing can be split based on the existing R&D foundation. Please provide existing information and target boundaries, first check "lock driver, lock status feedback, anti-tamper events and instruction validity period", and then clarify the deliverables and interface responsibilities of each module.

How are costs and cycle time assessed?

Split the workload based on target devices, interfaces, existing data, and verification criteria. This project focuses on checking lock drive, lock status feedback, anti-tamper events and instruction validity period; when prototypes, on-site integration testing or third-party platform cooperation are required, the corresponding costs, prerequisites and nodes will be listed separately.

PROJECT DELIVERY

From requirements to delivery

01

Requirements review

Confirm business goals, existing devices and systems, interfaces and deployment conditions.

02

Scope and solution

Review technical dependencies and agree responsibilities, deliverables and acceptance methods.

03

Development and integration

Implement the agreed scope and integrate with the target devices and systems.

04

Testing and issue resolution

Run agreed test cases and record issues, fixes and regression results.

05

Handover and acceptance

Deliver the agreed work, build configurations, interface documentation and test records.

06

Maintenance and changes

Handle version maintenance and assess new requirements within the agreed support scope.

Define Devices, Interfaces and Deliverables

Please provide the target functions, existing equipment information and usage environment of 4G electronic locks and electronic seals, focusing on the lock driver, lock status feedback, anti-tamper events and instruction validity period, so as to facilitate the determination of technical scope and stage delivery arrangements.

Discuss 4G Development
Online
Phone
13910119357
WeChat
WhatsApp
Winge Technology WhatsApp QR code Scan or click to contact us
Top