4G Connectivity · Custom Development for Enterprises

4G GNSS Asset Tracker Development

For asset management product companies, logistics equipment manufacturers and leasing operation companies, integrate GNSS and 4G to develop location collection, mobile wake-up, trajectory, electronic fence, low battery alarm and map display.

Logistics cold chain and asset management terminalSoftware, hardware and system integration testingPhased delivery

SERVICE OVERVIEW

Service overview

4G GNSS The asset locator is developed for enterprise projects that require location records for rotating equipment and mobile assets. Winge Technology carries out the docking of terminal hardware, embedded software and business systems based on existing equipment and target functions, forming design data and programs that can be used for subsequent integration testing, deployment and maintenance.

  • Device and interface access
  • Product business functions
  • Platform and data connection
  • Exception handling and operational constraints

DEVELOPMENT SCOPE

Development services

Development Scope

01

Device and interface access

Integrate GNSS, 4G, motion detection and power management, define positioning frequency, upload cycle, sleep wake-up and device identity.

02

Product business functions

Integrate GNSS and 4G to develop location collection, mobile wake-up, trajectory, electronic fence, low battery alarm and map display.

03

Platform and data connection

Combined with the business links of sensing and positioning → event and batch records → 4G → trajectory and environment management → disposal and traceability, the device identity, data fields, update time, abnormal status and result confirmation method are defined.

04

Exception handling and operational constraints

The position is provided by GNSS or the agreed positioning method, and 4G is responsible for transmission; occlusion, installation and work cycle need to be included in positioning and endurance verification.

Data and Operational Workflow

Movement or scheduled wake-up → Obtain location and positioning status → 4G reporting → Track, electronic fence and asset files.

The device side, communication side and platform side retain necessary status and logs respectively. Project integration testing is checked with actual equipment data and execution results, and network connection status and business completion status are recorded separately.

Project Inputs

  • Existing device models, interface and wiring diagrams, licensing agreements, data samples and available codes.
  • Business process and parameters: positioning method, antenna installation, work cycle and electronic fence rules.
  • Target location, operator, SIM/APN, power supply, installation method and equipment size.
  • Existing platform interfaces, user roles, development modules, number of prototypes and planned nodes.

Deliverables and Acceptance

DeliverablesDelivery contentVerification method
product realizationHardware design data, prototypes or existing equipment modification data involved in the project, as well as corresponding firmware and interfacesCheck position, time, speed and positioning valid marks.
Business integration testingData fields, status definitions, platform adaptation procedures and business integration testing recordsTest mobile wake and still sleep.
Version and test dataTarget hardware and software versions, build or deployment instructions, parameter configurations and test logsVerify no location, no network and fence boundary events.

First confirm the scope and key functions, then complete prototype or software development, system integration testing and stage acceptance. The acceptance conditions list the prototype, version, environment, duration and passing threshold; source code, design documents, third-party licenses, materials, traffic, cloud resources and on-site work are agreed separately.

Frequently Asked Questions

4G What determines the positioning accuracy of the locator?

Accuracy depends on positioning receiver, antenna, algorithm and field environment. 4G is mainly responsible for data transmission. The project should record positioning efficiency, errors and reporting conditions according to the actual installation method and route.

Can I delegate only part of the functionality of the GNSS Asset Locator?

The device interface, terminal program, 4G communication and platform integration testing can be split based on the existing R&D foundation. Please provide existing information and target boundaries, first check the "positioning method, antenna installation, working cycle and electronic fence rules", and then clarify the deliverables and interface responsibilities of each module.

How are costs and cycle time assessed?

Split the workload based on target devices, interfaces, existing data, and verification criteria. This project focuses on checking the positioning method, antenna installation, working cycle and electronic fence rules; when prototypes, on-site integration testing or third-party platform cooperation are required, the corresponding costs, prerequisites and nodes will be listed separately.

PROJECT DELIVERY

From requirements to delivery

01

Requirements review

Confirm business goals, existing devices and systems, interfaces and deployment conditions.

02

Scope and solution

Review technical dependencies and agree responsibilities, deliverables and acceptance methods.

03

Development and integration

Implement the agreed scope and integrate with the target devices and systems.

04

Testing and issue resolution

Run agreed test cases and record issues, fixes and regression results.

05

Handover and acceptance

Deliver the agreed work, build configurations, interface documentation and test records.

06

Maintenance and changes

Handle version maintenance and assess new requirements within the agreed support scope.

Define Devices, Interfaces and Deliverables

Please provide the target functions, existing equipment information and usage environment of the 4G

Discuss 4G Development
Online
Phone
13910119357
WeChat
WhatsApp
Winge Technology WhatsApp QR code Scan or click to contact us
Top