4G Connectivity · Custom Development for Enterprises

STM32 and RTOS Firmware Development for 4G Connectivity

For MCU product manufacturers and embedded R&D teams, develop UART/USB interfaces, AT commands or protocol stack adaptations, networking state machines, acquisition tasks and watchdogs; deliver firmware source code and construction instructions.

Firmware and system adaptationSpecialist DevelopmentInterface and verification

SERVICE OVERVIEW

Service overview

Winge Technology provides STM32/RTOS 4G networking firmware development services to MCU product manufacturers and embedded R&D teams, and implements specific technical links around the company's existing products and target systems. Services can be commissioned independently or combined with terminal hardware, firmware and platform development, with interfaces and scope of responsibilities confirmed at project launch.

  • Scope and Basic Check
  • Implementation and integration
  • Delivery Documentation
  • Verification and Constraints

DEVELOPMENT SCOPE

Development services

Development Scope

01

Scope and Basic Check

Determine the existing foundation, technical dependencies and content that needs to be developed based on MCU and board, RTOS, module firmware, UART/USB, memory and task cycle.

02

Implementation and integration

Split acquisition, communication, storage and control tasks and develop AT adaptation or host protocol stacks, asynchronous messages, connection state machines and fault recovery.

03

Delivery Documentation

Deliver firmware source code and build instructions.

04

Verification and Constraints

Peripheral and memory conditions will limit concurrent tasks, TLS, and cache size, and should be confirmed on the target board rather than a simulation environment.

Project implementation process

Verification of data and interfaces → Confirmation of technical solutions and verification use cases → Implementation of integration with the target environment → Regression of abnormal scenarios → Transfer of version data.

Verify the implementation results in the target hardware and software environment, and deliver records of associated interface configurations, version dependencies, and problem handling to facilitate subsequent integration and maintenance by the enterprise R&D team.

Project Inputs

  • MCU and board, RTOS, module firmware, UART/USB, memory and task cycle.
  • Design information, code, interface permissions and target test equipment can be provided.
  • Source files, programs or tools expected to be delivered, inter-module integration testing responsibilities and project nodes.
  • Acceptance samples, environment, test conditions and passing thresholds.

Deliverables and Acceptance

DeliverablesDelivery contentVerification method
achieve resultsDeliver firmware source code and build instructions.Test asynchronous reporting and command responses interleaved.
Integrated dataVersions and dependencies, interface configuration, usage or deployment steps, and integration changesVerify buffer overflows, task timeouts, and watchdogs.
Verify recordsTest conditions, execution records, problem lists and regression resultsData integrity when recording acquisition and communication in parallel.

The delivery scope and acceptance criteria are determined based on the target environment. Third-party SDK, licenses, laboratories, cloud resources, equipment materials and on-site support are listed separately; when the existing information is insufficient, follow-up work will be determined through interface verification or key function verification.

Frequently Asked Questions

How to troubleshoot AT commands that occasionally time out?

At the same time, record the serial port raw data, command timing, asynchronous events and power status, distinguish module unresponsiveness, parsing misalignment, task blocking and network timeout, and then determine correction and regression use cases.

STM32/RTOS 4G What information is required for network firmware development?

Please give priority to providing MCU and board, RTOS, module firmware, UART/USB, memory and task cycle. At the same time, the existing implementation, problems encountered, expected changes, and compatible test conditions are explained to facilitate the determination of implementation scope and reproduction methods.

Can it be implemented on existing products?

You can first evaluate the scope of existing designs and versions that can be changed, retain the verified parts, and determine the interfaces and dependencies that need to be adjusted. This service requires attention: peripheral and memory conditions will limit concurrent tasks, TLS and cache size, and should be confirmed on the target board rather than the simulation environment. Existing and new functions must undergo regression testing within the agreed scope after the changes.

PROJECT DELIVERY

From requirements to delivery

01

Requirements review

Confirm business goals, existing devices and systems, interfaces and deployment conditions.

02

Scope and solution

Review technical dependencies and agree responsibilities, deliverables and acceptance methods.

03

Development and integration

Implement the agreed scope and integrate with the target devices and systems.

04

Testing and issue resolution

Run agreed test cases and record issues, fixes and regression results.

05

Handover and acceptance

Deliver the agreed work, build configurations, interface documentation and test records.

06

Maintenance and changes

Handle version maintenance and assess new requirements within the agreed support scope.

Define Devices, Interfaces and Deliverables

Please explain the goals, existing versions and delivery requirements of the STM32/RTOS

Discuss 4G Development
Online
Phone
13910119357
WeChat
WhatsApp
Winge Technology WhatsApp QR code Scan or click to contact us
Top