4G Connectivity · Custom Development for Enterprises

4G Electrical Distribution Room Monitoring Terminal Development

For power distribution operation and maintenance enterprises, electrical equipment manufacturers and building integrators, it can access temperature, flood, access control and power instruments, and develop event correlation, inspection interface, alarm confirmation and historical records.

Energy equipment networking and operation and maintenanceSoftware, hardware and system integration testingPhased delivery

SERVICE OVERVIEW

Service overview

4G The development of power distribution room status monitoring terminal is aimed at enterprise projects that require "remote inspection of power distribution room equipment". Winge Technology carries out the docking of terminal hardware, embedded software and business systems based on existing equipment and target functions, forming design data and programs that can be used for subsequent integration testing, deployment and maintenance.

  • Device and interface access
  • Product business functions
  • Platform and data connection
  • Exception handling and operational constraints

DEVELOPMENT SCOPE

Development services

Development Scope

01

Device and interface access

Access power meters, temperature, flooding and access control status, and establish monitoring points, area numbers, event levels and equipment health status.

02

Product business functions

Access temperature, water immersion, access control and power instruments, and develop event correlation, inspection interface, alarm confirmation and historical records.

03

Platform and data connection

Combined with the business link of main controller and instrument → data and order status → 4G → enterprise operation platform → operation and maintenance processing, the device identity, data fields, update time, abnormal status and result confirmation method are defined.

04

Exception handling and operational constraints

Condition monitoring and electrical protection functions are separated; on-site sensor layout, insulation and installation construction conditions need to be confirmed during the design stage.

Data and Operational Workflow

On-site collection → status verification and alarm generation → 4G reporting → duty notification → inspection processing and record archiving.

The device side, communication side and platform side retain necessary status and logs respectively. Project integration testing is checked with actual equipment data and execution results, and network connection status and business completion status are recorded separately.

Project Inputs

  • Existing device models, interface and wiring diagrams, licensing agreements, data samples and available codes.
  • Business processes and parameters: monitoring points, instrument protocols, alarm levels, and inspection and disposal processes.
  • Target location, operator, SIM/APN, power supply, installation method and equipment size.
  • Existing platform interfaces, user roles, development modules, number of prototypes and planned nodes.

Deliverables and Acceptance

DeliverablesDelivery contentVerification method
product realizationHardware design data, prototypes or existing equipment modification data involved in the project, as well as corresponding firmware and interfacesCheck the monitoring point location with the actual installation area.
Business integration testingData fields, status definitions, platform adaptation procedures and business integration testing recordsTest for flooding, temperature overruns, and door status events.
Version and test dataTarget hardware and software versions, build or deployment instructions, parameter configurations and test logsVerify lost connection prompts, alarm recovery and disposal records.

First confirm the scope and key functions, then complete prototype or software development, system integration testing and stage acceptance. The acceptance conditions list the prototype, version, environment, duration and passing threshold; source code, design documents, third-party licenses, materials, traffic, cloud resources and on-site work are agreed separately.

Frequently Asked Questions

Can it be connected to the existing power distribution monitoring system?

Data access or forwarding can be developed based on existing system open interfaces. Point tables, protocols, access rights and historical system constraints need to be provided to determine which party is responsible for data synchronization methods and alarms.

Can I entrust only part of the functions of the power distribution room status monitoring terminal?

The device interface, terminal program, 4G communication and platform integration testing can be split based on the existing R&D foundation. Please provide existing data and target boundaries, first check "monitoring points, instrument protocols, alarm levels and inspection and disposal processes", and then clarify the deliverables and interface responsibilities of each module.

How are costs and cycle time assessed?

Split the workload based on target devices, interfaces, existing data, and verification criteria. This project focuses on checking monitoring points, instrument protocols, alarm levels, and inspection and disposal processes; when prototypes, on-site integration testing, or third-party platform cooperation are required, the corresponding costs, prerequisites, and milestones will be listed separately.

PROJECT DELIVERY

From requirements to delivery

01

Requirements review

Confirm business goals, existing devices and systems, interfaces and deployment conditions.

02

Scope and solution

Review technical dependencies and agree responsibilities, deliverables and acceptance methods.

03

Development and integration

Implement the agreed scope and integrate with the target devices and systems.

04

Testing and issue resolution

Run agreed test cases and record issues, fixes and regression results.

05

Handover and acceptance

Deliver the agreed work, build configurations, interface documentation and test records.

06

Maintenance and changes

Handle version maintenance and assess new requirements within the agreed support scope.

Define Devices, Interfaces and Deliverables

Please provide the target functions, existing equipment information and usage environment of the 4G power distribution room status monitoring terminal, focusing on the monitoring point location, instrument protocol, alarm level and inspection and disposal process, so as to facilitate the determination of technical scope and stage delivery arrangements.

Discuss 4G Development
Online
Phone
13910119357
WeChat
WhatsApp
Winge Technology WhatsApp QR code Scan or click to contact us
Top