4G Connectivity · Custom Development for Enterprises

4G Remote Meter Reading Data Collector Development

For meter manufacturers, energy consumption platform companies and meter reading system integrators, it adapts to pulse or serial meter protocols and develops reading collection, magnification conversion, time freezing, re-reading and usage statistics.

Water affairs and water conservancy telemetry and control systemSoftware, hardware and system integration testingPhased delivery

SERVICE OVERVIEW

Service overview

4G The remote meter reading collector is developed for enterprise projects that require centralized reading of dispersed water meters or flow meters. Winge Technology carries out the docking of terminal hardware, embedded software and business systems based on existing equipment and target functions, forming design data and programs that can be used for subsequent integration testing, deployment and maintenance.

  • Device and interface access
  • Product business functions
  • Platform and data connection
  • Exception handling and operational constraints

DEVELOPMENT SCOPE

Development services

Development Scope

01

Device and interface access

Adapt to pulse, RS-485 or customer-specified meter protocols to establish meter address, magnification, unit, cumulative amount and time freezing rules.

02

Product business functions

Adapt to pulse or serial meter protocols and develop reading collection, magnification conversion, time freezing, replacement copying and usage statistics.

03

Platform and data connection

Combined with the business link of water level and rainfall and meter →

04

Exception handling and operational constraints

The cumulative amount, time period consumption and meter replacement need to be distinguished; the development of collection links does not change the measurement characteristics of the original meter.

Data and Operational Workflow

Meter reading → Legality check → Freezing and local saving → 4G upload → Usage statistics and re-copying verification.

The device side, communication side and platform side retain necessary status and logs respectively. Project integration testing is checked with actual equipment data and execution results, and network connection status and business completion status are recorded separately.

Project Inputs

  • Existing device models, interface and wiring diagrams, licensing agreements, data samples and available codes.
  • Business process and parameters: meter protocol, address and multiplier, freezing time point and meter replacement rules.
  • Target location, operator, SIM/APN, power supply, installation method and equipment size.
  • Existing platform interfaces, user roles, development modules, number of prototypes and planned nodes.

Deliverables and Acceptance

DeliverablesDelivery contentVerification method
product realizationHardware design data, prototypes or existing equipment modification data involved in the project, as well as corresponding firmware and interfacesCheck the bottom of the table, magnification and statistical usage.
Business integration testingData fields, status definitions, platform adaptation procedures and business integration testing recordsVerify power outage count saving and repeated copying.
Version and test dataTarget hardware and software versions, build or deployment instructions, parameter configurations and test logsTest table replacement, address conflicts and single-table communication timeout.

First confirm the scope and key functions, then complete prototype or software development, system integration testing and stage acceptance. The acceptance conditions list the prototype, version, environment, duration and passing threshold; source code, design documents, third-party licenses, materials, traffic, cloud resources and on-site work are agreed separately.

Frequently Asked Questions

Can meters from multiple manufacturers be connected to the same collector?

The protocol and address can be configured separately, but each model information needs to be provided. The bus load, polling duration, field definitions and frozen diameters should be checked at the same time to ensure that platform statistics are consistent with on-site meter measurements.

Can I entrust only part of the functions of the remote meter reading collector?

The device interface, terminal program, 4G communication and platform integration testing can be split based on the existing R&D foundation. Please provide existing data and target boundaries, first check the "metering protocol, address and magnification, freezing time point and meter replacement rules", and then clarify the deliverables and interface responsibilities of each module.

How are costs and cycle time assessed?

Split the workload based on target devices, interfaces, existing data, and verification criteria. This project focuses on checking the meter agreement, address and magnification, freezing time point and meter replacement rules; when prototypes, on-site integration testing or third-party platform cooperation are required, the corresponding costs, prerequisites and nodes will be listed separately.

PROJECT DELIVERY

From requirements to delivery

01

Requirements review

Confirm business goals, existing devices and systems, interfaces and deployment conditions.

02

Scope and solution

Review technical dependencies and agree responsibilities, deliverables and acceptance methods.

03

Development and integration

Implement the agreed scope and integrate with the target devices and systems.

04

Testing and issue resolution

Run agreed test cases and record issues, fixes and regression results.

05

Handover and acceptance

Deliver the agreed work, build configurations, interface documentation and test records.

06

Maintenance and changes

Handle version maintenance and assess new requirements within the agreed support scope.

Define Devices, Interfaces and Deliverables

Please provide the target functions, existing equipment information and usage environment of the 4G remote meter reading collector, focusing on the meter protocol, address and magnification, freezing time point and meter replacement rules, so as to facilitate the determination of the technical scope and phased delivery arrangements.

Discuss 4G Development
Online
Phone
13910119357
WeChat
WhatsApp
Winge Technology WhatsApp QR code Scan or click to contact us
Top