Scenario development scope
Field devices and terminals
Focus on 4G hydrological telemetry RTU development, 4G pumping station monitoring terminal development and other products to clarify the interface, power supply and installation conditions, and develop or transform terminals.
Business and data
Define data, events, commands and results according to water level, rainfall and meter → RTU or monitoring terminal → 4G → Water Platform → Duty and Maintenance, and retain the association between equipment, sites or projects.
Platform and operation and maintenance
Connect with existing enterprise platforms, or develop device management, historical data, alarms, permissions and client functions, and determine the scope by module.
system constraints
In the planning stage, check the telemetry protocol version, site power supply, underground communication, pump station interlocking and metering caliber, and clarify the responsibilities and exception handling of local and remote systems.
product development services
Select corresponding technical services based on field equipment and target business. You can start with a single terminal or combine multiple device types. The following products describe the interfaces, business processes, delivery materials and acceptance methods respectively.
4G Hydrological Telemetry RTU Development
For hydrological equipment companies, water conservancy integrators and monitoring platform companies, it is connected to water level and rainfall equipment, and develops scheduled reporting, event reporting, clock management, telemetry protocol adaptation and low battery processing.
View Development Scope and Deliverables →Product Development4G Pump Station Monitoring Terminal Development
For pump station equipment manufacturers, water operators and control system integrators, it collects liquid level, pressure, pump status and faults, and develops control permissions, command acknowledgments, local interlocking interfaces and platform monitoring.
View Development Scope and Deliverables →Product Development4G Pipeline Level and Manhole Cover Monitoring Terminal Development
For pipe network monitoring equipment companies, municipal integrators and facility operating units, it can access liquid level, cap opening or tilt detection, and develop event wake-up, hierarchical reporting, power management, equipment maps and inspection records.
View Development Scope and Deliverables →Product Development4G Remote Meter Reading Data Collector Development
For meter manufacturers, energy consumption platform companies and meter reading system integrators, it adapts to pulse or serial meter protocols and develops reading collection, magnification conversion, time freezing, re-reading and usage statistics.
View Development Scope and Deliverables →System composition and business process
Water level, rainfall and meter → RTU or monitoring terminal → 4G → Water affairs platform → Duty and maintenance.
The platform manages devices according to enterprise projects, sites and permissions. After the link is restored, check the data and service status; when control is involved, separately confirm command authority, timeliness, local conditions and execution feedback.
Project Inputs
- Target business, equipment list, on-site location, equipment size and users.
- Wiring, protocols, raw data and open software interfaces to existing equipment.
- Key points to confirm: telemetry protocol version, site power supply, underground communications, pumping station interlocking and metering caliber.
- Platform status, data retention, client and deployment methods, prototype and on-site verification conditions.
Deliverables and Acceptance
| stage | Delivery content | Verification basis |
|---|---|---|
| Needs and plans | Equipment interface list, business process, system architecture and development division of labor | Verify telemetry protocol versions, site power supplies, underground communications, pump station interlocks, and metering calibers. |
| Development and integration testing | Agree on terminal hardware, firmware, interfaces and platform applications | Check the fields, status, instructions and abnormal behaviors one by one according to the actual device. |
| Acceptance and handover | Prototype or program, design and deployment data, test records and version list | Accept according to the agreed environment, sample, duration and threshold, and record the handling of failed items. |
R&D, prototype materials, structure, testing, on-site implementation and subsequent operation and maintenance are listed separately. Project cost and cycle are evaluated based on equipment type, interface complexity, existing foundation and verification workload.
Specialist Development Services
Existing products or internal R&D teams can only entrust the following technical links. The interface and integration testing responsibilities are clearly stated in the project documents.
4G Battery and Solar Power System Development
For battery terminal manufacturers and outdoor equipment R&D teams, we develop charging, power conversion, peak power supply, power detection and sleep control; deliver circuits, power consumption state design, battery life estimation and measurement records.
View Development Scope and Deliverables →Specialist Development4G Modbus Data Acquisition and Protocol Conversion Development
For instrumentation companies, industrial equipment manufacturers and system integrators, develop RTU/TCP device polling, byte order and scaling, platform field mapping and write acknowledgments; deliver mapping tables, source code and message records.
View Development Scope and Deliverables →Specialist Development4G Offline Buffering and Resumable Data Upload Development
For monitoring terminal enterprises and data gateway R&D teams, develop persistent queues, serial numbers, confirmations, deduplication, speed limits and capacity overflow strategies; deliver cache modules, parameter descriptions and network and power outage records.
View Development Scope and Deliverables →Specialist Development4G Remote Command and Execution Acknowledgment Development
For networked control equipment companies and platform R&D teams, develop command identification, permissions, validity period, idempotence, execution status and result acknowledgments; deliver command specifications and verification records such as timeout, duplication, loss of contact, etc.
View Development Scope and Deliverables →Frequently Asked Questions
How to divide the scope of monitoring and remote control?+
The monitoring side clarifies readings, events and records, and the control side adds permissions, validity period, local interlocking and execution feedback. The protection and disconnection behavior of pumping stations and other equipment are confirmed in the system design stage.
Can I reuse existing platforms and terminals?+
You can first check the existing interfaces, data and code, and focus new development on the missing links. In this scenario, it is necessary to focus on checking the telemetry protocol version, site power supply, underground communication, pumping station interlocking and metering caliber, and then determine the reusable range and return work.
Online
Phone
WeChat
Top