4G Connectivity · Custom Development for Enterprises

4G Pipeline Level and Manhole Cover Monitoring Terminal Development

For pipe network monitoring equipment companies, municipal integrators and facility operating units, it can access liquid level, cap opening or tilt detection, and develop event wake-up, hierarchical reporting, power management, equipment maps and inspection records.

Water affairs and water conservancy telemetry and control systemSoftware, hardware and system integration testingPhased delivery

SERVICE OVERVIEW

Service overview

4G Pipe network liquid level and manhole cover monitoring terminal development is aimed at enterprise projects that "need to identify abnormalities in liquid level and manhole cover in drainage pipe networks". Winge Technology carries out the docking of terminal hardware, embedded software and business systems based on existing equipment and target functions, forming design data and programs that can be used for subsequent integration testing, deployment and maintenance.

  • Device and interface access
  • Product business functions
  • Platform and data connection
  • Exception handling and operational constraints

DEVELOPMENT SCOPE

Development services

Development Scope

01

Device and interface access

Integrate liquid level, cover opening, tilt and power detection, and design the terminal structure interface according to the installation space, communication conditions and maintenance methods.

02

Product business functions

Access liquid level, cap opening or tilt detection, and develop event wake-up, hierarchical reporting, power management, equipment map and inspection records.

03

Platform and data connection

Combined with the business link of water level and rainfall and meter →

04

Exception handling and operational constraints

Communication at underground points requires on-site verification; waterproofing, anti-corrosion and battery life are determined according to the installation conditions of the complete device, and module parameters are not used to replace the results of the complete device.

Data and Operational Workflow

Periodic liquid level collection or wake-up by opening the lid → Event determination → 4G reporting → Map site and alarm → Inspection and disposal records.

The device side, communication side and platform side retain necessary status and logs respectively. Project integration testing is checked with actual equipment data and execution results, and network connection status and business completion status are recorded separately.

Project Inputs

  • Existing device models, interface and wiring diagrams, licensing agreements, data samples and available codes.
  • Business processes and parameters: underground installation, antenna location, event triggering and battery maintenance conditions.
  • Target location, operator, SIM/APN, power supply, installation method and equipment size.
  • Existing platform interfaces, user roles, development modules, number of prototypes and planned nodes.

Deliverables and Acceptance

DeliverablesDelivery contentVerification method
product realizationHardware design data, prototypes or existing equipment modification data involved in the project, as well as corresponding firmware and interfacesVerify capping, tilting, and level threshold events.
Business integration testingData fields, status definitions, platform adaptation procedures and business integration testing recordsRecord the connection and reporting status of the target well location.
Version and test dataTarget hardware and software versions, build or deployment instructions, parameter configurations and test logsTest for low battery, repeated triggering, and cache capacity boundaries.

First confirm the scope and key functions, then complete prototype or software development, system integration testing and stage acceptance. The acceptance conditions list the prototype, version, environment, duration and passing threshold; source code, design documents, third-party licenses, materials, traffic, cloud resources and on-site work are agreed separately.

Frequently Asked Questions

How to deal with weak signals at underground well locations?

First record the well location, manhole cover material, antenna location and network conditions, and then evaluate the antenna layout, installation method and reporting strategy. It is necessary to use an on-site prototype to confirm the link, and cannot only judge based on ground mobile phone signals.

Can I entrust only part of the functions of the pipe network liquid level and manhole cover monitoring terminal?

The device interface, terminal program, 4G communication and platform integration testing can be split based on the existing R&D foundation. Please provide existing data and target boundaries, first check "underground installation, antenna location, event triggering and battery maintenance conditions", and then clarify the deliverables and interface responsibilities of each module.

How are costs and cycle time assessed?

Split the workload based on target devices, interfaces, existing data, and verification criteria. This project focuses on checking underground installation, antenna location, event triggering and battery maintenance conditions; when prototypes, on-site integration testing or third-party platform cooperation are required, the corresponding costs, prerequisites and nodes will be listed separately.

PROJECT DELIVERY

From requirements to delivery

01

Requirements review

Confirm business goals, existing devices and systems, interfaces and deployment conditions.

02

Scope and solution

Review technical dependencies and agree responsibilities, deliverables and acceptance methods.

03

Development and integration

Implement the agreed scope and integrate with the target devices and systems.

04

Testing and issue resolution

Run agreed test cases and record issues, fixes and regression results.

05

Handover and acceptance

Deliver the agreed work, build configurations, interface documentation and test records.

06

Maintenance and changes

Handle version maintenance and assess new requirements within the agreed support scope.

Define Devices, Interfaces and Deliverables

Please provide the target functions, existing equipment information and usage environment of the 4G pipe network liquid level and manhole cover monitoring terminal, focusing on underground installation, antenna location, event triggering and battery maintenance conditions, so as to facilitate the determination of technical scope and stage delivery arrangements.

Discuss 4G Development
Online
Phone
13910119357
WeChat
WhatsApp
Winge Technology WhatsApp QR code Scan or click to contact us
Top