4G Connectivity · Custom Development for Enterprises

4G Pump Station Monitoring Terminal Development

For pump station equipment manufacturers, water operators and control system integrators, it collects liquid level, pressure, pump status and faults, and develops control permissions, command acknowledgments, local interlocking interfaces and platform monitoring.

Water affairs and water conservancy telemetry and control systemSoftware, hardware and system integration testingPhased delivery

SERVICE OVERVIEW

Service overview

4G Pumping station monitoring terminal development is aimed at enterprise projects where "pumping stations have few people on duty and need to check operation and faults". Winge Technology carries out the docking of terminal hardware, embedded software and business systems based on existing equipment and target functions, forming design data and programs that can be used for subsequent integration testing, deployment and maintenance.

  • Device and interface access
  • Product business functions
  • Platform and data connection
  • Exception handling and operational constraints

DEVELOPMENT SCOPE

Development services

Development Scope

01

Device and interface access

Access liquid level, pressure, flow, pump operation and fault signals, and realize status reading and authorization command docking according to the control cabinet interface.

02

Product business functions

Collect liquid level, pressure, pump status and faults, and develop control permissions, command acknowledgments, local interlocking interfaces and platform monitoring.

03

Platform and data connection

Combined with the business link of water level and rainfall and meter →

04

Exception handling and operational constraints

Pump protection, emergency stop and necessary interlocking are executed locally; remote instructions specify validity period, priority and on-site/remote switching conditions.

Data and Operational Workflow

On-site status collection → 4G telemetry → platform research and judgment → authorized command → local interlocking check → execution feedback and operation traces.

The device side, communication side and platform side retain necessary status and logs respectively. Project integration testing is checked with actual equipment data and execution results, and network connection status and business completion status are recorded separately.

Project Inputs

  • Existing device models, interface and wiring diagrams, licensing agreements, data samples and available codes.
  • Business processes and parameters: pump and instrument interface, field interlocking, manual and automatic priority and execution feedback.
  • Target location, operator, SIM/APN, power supply, installation method and equipment size.
  • Existing platform interfaces, user roles, development modules, number of prototypes and planned nodes.

Deliverables and Acceptance

DeliverablesDelivery contentVerification method
product realizationHardware design data, prototypes or existing equipment modification data involved in the project, as well as corresponding firmware and interfacesVerify pump status, instrument readings and alarm mapping.
Business integration testingData fields, status definitions, platform adaptation procedures and business integration testing recordsTest for duplicate, expired, and commands that do not meet interlock conditions.
Version and test dataTarget hardware and software versions, build or deployment instructions, parameter configurations and test logsVerify the control behavior when the network is disconnected and the status synchronization after the network is restored.

First confirm the scope and key functions, then complete prototype or software development, system integration testing and stage acceptance. The acceptance conditions list the prototype, version, environment, duration and passing threshold; source code, design documents, third-party licenses, materials, traffic, cloud resources and on-site work are agreed separately.

Frequently Asked Questions

How does the water pump operate after the network is disconnected?

Retain local automatic or manual logic based on process and control cabinet capabilities. The project needs to clarify the operation strategy, on-site priority and status synchronization after recovery when the network is disconnected, so as to avoid re-executing expired commands.

Can I entrust only some functions of the pump station monitoring terminal?

The device interface, terminal program, 4G communication and platform integration testing can be split based on the existing R&D foundation. Please provide existing information and target boundaries, first check the "pump and instrument interface, on-site interlocking, manual and automatic priority and execution feedback", and then clarify the deliverables and interface responsibilities of each module.

How are costs and cycle time assessed?

Split the workload based on target devices, interfaces, existing data, and verification criteria. This project focuses on checking the pump and instrument interface, on-site interlocking, manual-automatic priority and execution feedback; when prototypes, on-site integration testing or third-party platform cooperation are required, the corresponding costs, prerequisites and nodes will be listed separately.

PROJECT DELIVERY

From requirements to delivery

01

Requirements review

Confirm business goals, existing devices and systems, interfaces and deployment conditions.

02

Scope and solution

Review technical dependencies and agree responsibilities, deliverables and acceptance methods.

03

Development and integration

Implement the agreed scope and integrate with the target devices and systems.

04

Testing and issue resolution

Run agreed test cases and record issues, fixes and regression results.

05

Handover and acceptance

Deliver the agreed work, build configurations, interface documentation and test records.

06

Maintenance and changes

Handle version maintenance and assess new requirements within the agreed support scope.

Define Devices, Interfaces and Deliverables

Please provide the target functions, existing equipment information and usage environment of the 4G pumping station monitoring terminal, focusing on the pump and instrument interface, on-site interlocking, manual and automatic priority and execution feedback, so as to facilitate the determination of technical scope and stage delivery arrangements.

Discuss 4G Development
Online
Phone
13910119357
WeChat
WhatsApp
Winge Technology WhatsApp QR code Scan or click to contact us
Top