4G Connectivity · Custom Development for Enterprises

4G Street Lighting Central Controller Development

For lighting control product companies, municipal integrators and facility operation units, develop group switches, time period planning, brightness interfaces, fault collection, power statistics and local plan execution when the network is disconnected.

Networking of buildings and municipal facilitiesSoftware, hardware and system integration testingPhased delivery

SERVICE OVERVIEW

Service overview

4G Street light centralized controller development is aimed at enterprise projects that require "centralized operation and maintenance of street lights or lighting control boxes". Winge Technology carries out the docking of terminal hardware, embedded software and business systems based on existing equipment and target functions, forming design data and programs that can be used for subsequent integration testing, deployment and maintenance.

  • Device and interface access
  • Product business functions
  • Platform and data connection
  • Exception handling and operational constraints

DEVELOPMENT SCOPE

Development services

Development Scope

01

Device and interface access

Adapt switch, dimming, power and loop status interfaces to establish lamp or control box grouping, time period plan and device address.

02

Product business functions

Develop group switches, time period plans, brightness interfaces, fault collection, power statistics and local plan execution when the network is disconnected.

03

Platform and data connection

Combined with the business links of field instruments and facilities → local rules or collection → 4G → group management → inspection and service tasks, the device identity, data fields, update time, abnormal status and result confirmation method are defined.

04

Exception handling and operational constraints

The dimming protocol, clock and local plan need to be confirmed at the same time; when the public network is lost, it will still operate according to the confirmed local policy.

Data and Operational Workflow

Platform setting plan → 4G synchronization → local scheduled execution → loop and power feedback → fault recording and maintenance.

The device side, communication side and platform side retain necessary status and logs respectively. Project integration testing is checked with actual equipment data and execution results, and network connection status and business completion status are recorded separately.

Project Inputs

  • Existing device models, interface and wiring diagrams, licensing agreements, data samples and available codes.
  • Business processes and parameters: dimming protocol, loop grouping, local clock and plan priority.
  • Target location, operator, SIM/APN, power supply, installation method and equipment size.
  • Existing platform interfaces, user roles, development modules, number of prototypes and planned nodes.

Deliverables and Acceptance

DeliverablesDelivery contentVerification method
product realizationHardware design data, prototypes or existing equipment modification data involved in the project, as well as corresponding firmware and interfacesVerify grouping switches and time slot plans.
Business integration testingData fields, status definitions, platform adaptation procedures and business integration testing recordsCheck the dimming value, loop feedback and energy consumption fields.
Version and test dataTarget hardware and software versions, build or deployment instructions, parameter configurations and test logsTest clock correction, network outage and power outage recovery.

First confirm the scope and key functions, then complete prototype or software development, system integration testing and stage acceptance. The acceptance conditions list the prototype, version, environment, duration and passing threshold; source code, design documents, third-party licenses, materials, traffic, cloud resources and on-site work are agreed separately.

Frequently Asked Questions

Can street light control plans be executed offline?

The plan can be stored locally in the controller for execution, and the version and effective time can be recorded. It is necessary to clarify the handling of clock abnormalities, power outage recovery, and holiday plan conflicts, and then conduct on-site verification.

Is it possible to entrust only part of the functions of the centralized streetlight controller?

The device interface, terminal program, 4G communication and platform integration testing can be split based on the existing R&D foundation. Please provide existing information and target boundaries, first check the "dimming protocol, loop grouping, local clock and plan priority", and then clarify the deliverables and interface responsibilities of each module.

How are costs and cycle time assessed?

Split the workload based on target devices, interfaces, existing data, and verification criteria. This project focuses on checking the dimming protocol, loop grouping, local clock and plan priority; when prototypes, on-site integration testing or third-party platform cooperation are required, the corresponding costs, prerequisites and nodes will be listed separately.

PROJECT DELIVERY

From requirements to delivery

01

Requirements review

Confirm business goals, existing devices and systems, interfaces and deployment conditions.

02

Scope and solution

Review technical dependencies and agree responsibilities, deliverables and acceptance methods.

03

Development and integration

Implement the agreed scope and integrate with the target devices and systems.

04

Testing and issue resolution

Run agreed test cases and record issues, fixes and regression results.

05

Handover and acceptance

Deliver the agreed work, build configurations, interface documentation and test records.

06

Maintenance and changes

Handle version maintenance and assess new requirements within the agreed support scope.

Define Devices, Interfaces and Deliverables

Please provide the target functions, existing equipment information and usage environment of the 4G street light centralized controller, focusing on the dimming protocol, loop grouping, local clock and plan priority, so as to facilitate the determination of technical scope and phase delivery arrangements.

Discuss 4G Development
Online
Phone
13910119357
WeChat
WhatsApp
Winge Technology WhatsApp QR code Scan or click to contact us
Top