Engineering guide
For final-test station task definition procurement, check the inputs, evidence and unresolved items below before selecting an approach. Assign owners and acquisition methods for missing documents; a demonstration alone does not establish compatibility or performance.
Procurement checklist
Swipe the table horizontally to view all columns.
| Item | Inputs and checks | Decision boundary |
|---|---|---|
| Device under test and revision | Provide models, revisions, interfaces and IDs for normal and abnormal samples | Do not assume different revisions share test rules |
| Test points and limits | List each test point, method, instrument and basis for limits | Keep unconfirmed limits pending rather than producing a pass result |
| Final disposition | Assign automated decisions, human review, rework and release ownership | Treat software results, electrical safety and fixture safety separately |
What inputs are needed before starting?
DUT revisions, test points, samples, fixture conditions, operating workflow and the decision owner. Check document versions and availability first and retain missing items as unresolved inputs.
How should delivery and acceptance be defined?
Check states and records with normal, failed, interrupted, reviewed and repeated runs; validate measured limits against the equipment and specifications separately. A state prototype is not fixture or complete-system validation; measurement, actuation and safety interlocks require their own equipment and acceptance conditions.
Enterprises in Dongguan, China, can submit these inputs for remote review. Agree prototype integration, sample shipment, site work and associated costs for the specific project.
Review the service scope and submit the project inputs before agreeing on development and delivery. Original Chinese service directory