Save particle size files, volumes, times and invalid samples by point
Applicable purchasers
Analytical instruments, clean equipment and industrial laboratories
Test and assembly objects
Customer-provided particle counters and sampling routes
Development and delivery
Save particle size files, volumes, times and invalid samples by point
Project input
Standard medium or standard solution, reference instrument, temperature and humidity and operating flow path
Acceptance method
The standard calibration information is checked against the sampling volume, and the cleanliness level is not issued by this tool.
Implementation steps
Object and interface verification → Reference link and solution confirmation → Single module prototype → Instrument and equipment joint debugging → Independent reference re-inspection → Source code, configuration and record delivery.
Equipment condition and scope confirmation
The scope may include control boards, firmware, instrument drivers, host software, process configuration and test records. Mechanical fixtures, pressure-bearing structures, fluid circuits, power circuits and optical or acoustic references are provided or separately designed by the responsible parties. Measurement specifications are established through validation with the target equipment and independent references.
Source code, design documents, instrument licensing, procurement, on-site support and ongoing maintenance scope are listed in the project documents.
FAQ
What input conditions are required for this task?
Standard medium or standard solution, reference instrument, temperature and humidity and operating flow path
How to accept this task?
The standard calibration information is checked against the sampling volume, and the cleanliness level is not issued by this tool.
Can I delegate only the instrument interface or test software?
The scope can cover an individual instrument driver, acquisition, process control, data calculation or user-interface module. Complete equipment integration requires separate agreement on mechanical, electrical, method and site responsibilities.
Online
Phone
WeChat
Top