Start with one interface or measurement process, or combine acquisition, control, operator interfaces and data records. Confirm equipment, methods, reference instruments and acceptance conditions before implementation.
Special testing and instrument development
Liquid-cooling CDU control board and monitoring firmware
A set of CDU and pump valve sensing interface
Form pump valve state machine, HMI, communication and exception recovery firmware
Cold-plate and pipe pressure-hold and flow-resistance test control
Cold plate, joints and pipeline test pieces
Collect pressure differential flow, control the pressure maintaining process and output curves and judgment records
Cold-plate thermal resistance and heat-transfer test software
Cold plate, heating block and circulation path
Correlate input heat and temperature flow pressure conditions, output steady state and thermal performance calculation records
Liquid-cooling vacuum filling and degassing station control
Closed liquid cooling circuit and filling valve block
Control vacuuming, quantitative filling, exhaust and termination status and save filling records
Quick-connector insertion force and residual-liquid test tooling
Liquid cooled quick connect and mating connectors
Simultaneously record the insertion and extraction force, displacement, connection status and residual liquid weighing after disconnection
Cell OCV and internal-resistance sorting test tooling
Specified battery cell and voltage internal resistance meter
Correlate the workpiece identity, OCV and internal resistance to generate binning and retest records
Battery EIS instrument automation and result comparison
Cell and Authorized Impedance Analyzer
Arrange frequency points and temperature status, save complex impedance original data and reference differences
BMS cell-voltage and temperature signal simulation bench
BMSSampling channel and signal source
Control the simulated cell and temperature resistance, inject prescribed open and short circuits and collect responses
Charging connector contact-resistance and temperature-rise test control
Plugs and sockets, load and temperature measuring points
Simultaneously record current, voltage drop and temperature, output connection status and temperature rise process
Power-board double-pulse test instrument sequencing software
Customer-supplied pulse bench, probe and power board
Control instrument triggering and sampling configuration, associate original waveforms and calculated apertures
Robot-joint torque and speed test-bench control
Joint module and mechanical loading device
Synchronous torque, speed, current, temperature, output working condition curve and original records
Reducer backlash and torsional-stiffness test tools
Reducer, angle reference and torque loading
Record the forward and reverse angular load relationships, and output the hysteresis and stiffness calculation process
Multi-axis calibration tools for six-axis force sensors
Six-dimensional force sensor and reference loading fixture
Arrange load directions and solve channel matrices, preserving coupling and independent retesting
Gripper force, holding and slip test tools
Gripper, representative specimen and reference load
Correlate clamping commands, forces and slip displacements, and output to maintain process records
Servo-press force and displacement evaluation station
Press-fit workpiece, servo axis and force displacement reference
Judge the assembly process according to the force-displacement envelope, and output curves and workpiece corresponding records.
Screw-tightening torque, angle and process traceability tools
Tightening shaft, workpiece and reference torque
Collect torque angle and step status, and correlate repeated tightening with abnormal results
Adhesive-dispensing mass verification and dose-control modules
Valves, weighing references and representative compounds
Correlate weighing, pressure temperature and glue dispensing pulse to generate calibration and compensation records
Synchronized welding current, voltage and motion acquisition
Existing welding machines and workpiece process signals
Simultaneously record current, voltage, pressure and trigger, output process curve and sample mapping
Multi-station measurement channel switching and station comparison
Existing testing instruments and multiple sets of tooling
Verify channel mapping, reference parts and station differences and retain version results
Probe contact and channel open-short test tools
Probe cards or contact fixtures and reference boards
Control switching matrix and low voltage measurements, record contact stability and channel mapping
Wafer-prober and instrument coordination software
Customer-supplied probe stations, measuring instruments and wafer maps
Linked coordinates, needle drop status and instrument testing, output wafer result mapping
Package-warpage measurement data and workstation software
Customer-supplied displacement optical measurement links and packages
Bind scanning coordinates, reference surface, temperature and sample, and output warpage data processing records
Laser LIV and temperature-controlled test software
Lasers, source meters, optical power meters and TEC
Arrange current and temperature scans to output electro-optical data and original measurement conditions
Fiber-coupling active-alignment station software
Optical Components, Multi-Axis Stages and Power References
Perform power search, coordinate transformation and alignment rollback, and save process recipes
Photodetector dark-current and responsivity characterization tools
Receiver, camera obscura, source meter and light reference
Program dark state and specified light conditions, record current, optical power and response calculation
Industrial-lens focus and MTF fixture software
Imaging module, chart card and focusing mechanism
Collect designated graphics cards and locations, calculate comparison indicators and record the focusing process
Pressure-sensor multi-point calibration and temperature-drift tools
Pressure elements, pressure references and thermostats
Arrange pressure and temperature points, output fitting coefficients, residuals and independent retest records
Gravimetric flowmeter calibration-bench control software
Flow meters, weighing references and switching flow paths
Correlate mass time and media conditions to calculate flow error and repeatability
Gas-sensor mixture control and response-curve tools
Target gas sensor, reference gas and gas distribution device
Link flow concentration and cleaning steps to record response recovery and temperature and humidity conditions
Water-quality electrode liquid switching and calibration tools
Electrodes, standard liquids and existing liquid changing mechanism
Arrange cleaning, soaking and sampling, and save temperature compensation, drift and standard solution batches
Displacement-encoder error-mapping verification tools
Encoder or displacement element and reference device
Synchronize reference positions with device readings to generate error mapping and revalidation data
Microphone and loudspeaker sweep and loopback test tools
Audio modules, reference source microphones and fixtures
Control playback of recordings and sweeps, and associate acoustic references, delays and abnormal channels
Audio-video input-to-output latency test tools
Terminal, observable photoacoustic triggering and acquisition reference
Record input, display, and sound moments respectively, and output end-to-end time difference and jitter
UAV motor and propeller thrust-bench control tools
Motor propeller, thrust frame and electrical reference
Synchronize thrust speed, electric power and temperature, save working conditions and original data
Acoustic-transducer sweep and reception test tools
Transducers, reference hydrophones and designated flumes
Orchestrate frequency excitation and receive samples, preserving geometric positions and acoustic references
Pump and valve flow-pressure characteristic test control
Pump or valve, existing flow path, and reference instrument
Arrange opening speed working conditions and output flow pressure differential power characteristics
Membrane-module flux and differential-pressure test software
Membrane modules, existing filter circuits and weighing references
Correlate pressure, temperature, filtration volume and time to record flux changes and flushing processes
Online-analyzer sampling and cleaning fluid-path control
Analyzer, sampling pump valve and standards
Establish sampling, cleaning, calibration and fault fallback state machines
Gravimetric pipetting and dispensing verification tools
Liquid handling head, weighing reference and specified test fluids
Control pipetting sequences and correlate quality, evaporation conditions and channel repeatability
Microfluidic flow and pressure coordination modules
Microfluidic chip, pump valve and pressure flow reference
Develop quantitative flow, pulsation recording, blockage status and experimental parameter storage
Microplate-reader wavelength and motion-control software
Existing light source detector and plate position mechanism
Link wavelength, plate position, reading and blank reference to output raw data
Bioelectric signal simulation and acquisition-chain verification
Target acquisition board and authorized reference signal source
Output the specified waveform and artifacts, compare the acquisition results with the reference, and do not make diagnosis and treatment judgments.
Irrigation-nozzle flow and pressure-distribution test tools
Sprinklers, existing waterways and water collection metering
Correlate pressure flow and regional water collection volume to generate working condition comparison and distribution records
Seed-metering count and drop-position test tools
Seeding mechanism, reference counting and observation equipment
Correlate drive speed, seed count and drop point, retaining samples and error definitions
CIP valve sequencing and process-record modules
Existing food flow path, valve group and temperature flow concentration signal
Arrange cleaning steps and controlled rollback, and keep batch parameters and process records
Composite-curing temperature and vacuum process acquisition
Existing curing equipment, vacuum bags and temperature and pressure reference
Simultaneously record temperature, vacuum and program status, and output batch curves and abnormal segments
Material thermal-conductivity and contact-resistance test control
Specimen, Controlled Heat Source and Temperature Power Reference
Correlate clamping, temperature difference and power conditions, output calculations and raw data
PV-module IV curve instrument coordination software
Components, AuthorizationIVInstrument and Irradiation Temperature Reference
Arrange collection, save environment and original curves, record correction method version
Electrode-coating thickness and tension recording tools
Existing coating lines, thickness reference, and tension interfaces
Synchronize position, thickness, tension and batch, output process alignment data
Circuit-breaker motion and contact-timing test tools
Circuit breakers, excitation and position/contact references
Synchronize action time, displacement and contact status, output working conditions and event records
Current-transformer ratio and phase-error instrument coordination
Transformers, reference sources and authorized measuring instruments
Arrange given working conditions, save reference and measured data, phase aperture and calculations
Fan PQ curve, speed and power test tools
Fans, existing ducts and pressure flow references
Arrange speed and resistance working conditions, output pressure, flow, power and original conditions
Data-acquisition channel and measurement-chain self-check tools
Acquisition cards, sensing front-ends and reference signals
Perform loop/reference injection to verify channel mapping, biasing, and configuration consistency
Measurement-uncertainty and error-budget calculation tools
Given a measurement model, reference terms and raw data
Implement formula version, input unit and component propagation, and output a reviewable calculation sheet
Measurement-system GRR and station-variation analysis tools
Repeated measurements, operator and sample identification
Calculate measurement variation according to the agreed experimental design, retaining the sample range and algorithm caliber
Hose burst-pressure test control and data recording
Hose and customer blasting test bench
Record boost slope, peak and rupture events, and correlate batch and specimen photos
Hose pressure-impulse life-test control software
Hose Pulse Station and Pressure Feedback
Forming a pulse waveform closed-loop interface, cycle counting and failure segment interception
Servo-valve frequency-response test interfaces
Customer supplied servo valve dynamic bench
Synchronize command and pressure flow response, save amplitude and phase calculation and excitation records
Spindle radial-runout and rotation-error measurement tools
Spindle, standard rod and displacement probe
Synchronized angle and multi-point radial displacement, separated clamping eccentricity and repeated rotation error
Rotor-balancing instrument data and balance-weight traceability
Customer supplied dynamic balancing machines, rotors and counterweight rules
Read phase and imbalance, record counterweight position and re-measurement differences
Multi-section roundness and cylindricity data evaluation
Roundness meter trajectory and customer evaluation caliber
Save filtering and fitting settings, output cross-section shape and original point index
Profile and roughness instrument interfaces and batch evaluation
Customer supplied profile roughness meter
Arrange survey lines, read parameters and original contours, and bind assessment lengths
Gear composite-meshing error test data tools
Customer-supplied double-sided meshing instrument and gear
Correlate the changes in rotation angle and center distance to calculate the specified comprehensive error index
Multi-bore air-gauge acquisition and sorting modules
Customer supplied air momentum meter and standard ring gauge
Read multi-channel aperture, upper and lower calibration limits and grouping results
Pin-on-disc friction and wear test control software
Customer supply plate machine, load and speed chain
Record friction coefficient, temperature, wear displacement and working condition changes
Quench cooling-curve acquisition and feature recalculation
Standard probes and customer-supplied quenching measuring devices
Save the original data of temperature and time and calculate the cooling rate according to the specified algorithm
Viscoelastic creep and stress-relaxation acquisition modules
Customer-supplied testing machines and material samples
Maintain customer supply loading mode and record force and displacement changes over time
Polymer melt-flow instrument sequencing and weighing interfaces
Customer supplied melt flow meter and balance
Bind temperature, load, cutting time and quality, and output calculation records
Film oxygen and water-vapor transmission instrument tools
Transmittance meter and film sample provided by customer
Manage blanks, active areas, steady-state segments and gas conditions
Rubber dynamic-stiffness and loss-angle data modules
Customer-supplied dynamic material testing machine
Correlate frequency, temperature, preload and complex stiffness, and save the original force displacement phase
Barcode print-quality instrument interfaces and evidence records
Customer-supplied barcode quality meter and label samples
Read the instrument grade and defect items, and bind the lighting caliber to the original image
Insulating-glass dew-point temperature control and image records
Dew point meter and glass sample provided by customer
Correlate local cooling temperature with observation image to form operator confirmation record
Powder-rheometer automation and batch comparison modules
Customer supplied powder rheometer and reference powder
Save preprocessing, shearing or fluidization results with batch differences
Powder particle-size and sieving result comparison tools
Customer-supplied particle size analyzer and screening quality record
Unify the sample number and save the volume distribution and screening mass distribution separately
Multi-port S-parameter measurement and calibration-state tools
Customer supply network, switch matrix and devices
Arrange port matrix, save calibration status, Touchstone and workpiece mapping
Antenna-pattern turntable and instrument sequencing software
Customer supplied turntables, chambers and RF instruments
Angle-triggered acquisition of amplitude, phase or power, output pattern and coordinate definition
LNA noise-figure measurement instrument interfaces
Customer-supplied noise meter, noise source and LNA
Program frequency bands and offsets, and save noise source calibration and measurement results
TDR impedance-profile and cable-position mapping tools
Customer supplyTDR or Yanet time domain data
Bind propagation velocity and reference surface, output impedance location and anomaly candidates
Clock phase-noise instrument automation
Customer supplied phase noise analyzer and frequency source
Record offset frequency band, integration range and instrument noise floor reference
EMI receiver sweep and limit-review software
Customer supplyEMI receiver and test site
Arrange frequency band detectors and dwells, and save original spectra and repeated measurement points
Near-field spectrum scanning and coordinate-mapping tools
Near-field probes, spectrum analyzers and customer-supplied scanning stations
Form frequency band heat map and coordinate mapping, save probe height and direction
Harmonic and flicker analyzer interfaces and condition traceability
Customer power quality meter and load
Bind working conditions, measurement windows and instrument indicators, and do not set your own certification criteria.
Ultrasonic thickness-grid positioning and reading acquisition
Ultrasonic thickness gauge and positioning information provided by customers
Map thickness readings, locations and quality flags into a grid
Phased-array ultrasonic scan and encoder synchronization interfaces
Customer-supplied phased array instruments and coded scanners
Record the encoding location, A-scan or original machine file and configuration version
Eddy-current array scan coordinates and defect annotation tools
Customer-supplied eddy current array instrument and standard test block
Correlate scan traces, raw data and manual defect annotations
Multi-channel acoustic-emission triggering and event-location tools
Customer-supplied acoustic emission instrument and sensor arrangement
Read the event time, amplitude and original waveform, and output the position according to the customer's algorithm
Electrochemical-corrosion polarization instrument interfaces
Customer powered chemical workstation and corrosion sample
Program approved potential scans and save reference electrode and raw current potentials
Coating-adhesion scratch-instrument data acquisition modules
Custom scratch meter and microscopic images
Synchronize load, position and scratch images, record critical events for manual confirmation
Autotitrator batch sequencing and endpoint review
Customer supplied titrators and authorization methods
Manage blanks, standardization, original curve and endpoint manual review
Cleanroom particle-counter route acquisition tools
Customer-provided particle counters and sampling routes
Save particle size files, volumes, times and invalid samples by point
Gas adsorption and desorption instrument sequencing modules
Adsorption analyzers and standards provided by customers
Record pretreatment, pressure, temperature and raw adsorption data
Residual-gas analyzer scan and background-comparison tools
Customer supplyRGA and vacuum system
Record mass, ion current and chamber status, and save background differences
Quartz-crystal deposition-monitor interfaces
Customer supplyQCMmonitors and coating controllers
Read frequency, thickness estimation and set parameters, correlate batches
Customized range selected by measurement and process
Measurement of flow, differential pressure and pump and valve characteristics
Circulation pump flow head and power consumption test control development
Test and assembly objects:Specify circulation pump and existing circulation rack
Development and delivery:Adjust working conditions and collect flow and pressure differential power to form pump characteristic data
Project input:Medium, flow pressure range, temperature, reference instrument and existing flow path
Acceptance method:Check the reference flow pressure difference, medium temperature, steady state and repeated operating conditions; save the measuring point location and original curve.
Filter clogging pressure difference and bypass status test tool
Test and assembly objects:Filter, bypass valve and flow path
Development and delivery:Linkage flow pressure difference collection and bypass status recording, output working condition comparison
Project input:Medium, flow pressure range, temperature, reference instrument and existing flow path
Acceptance method:Check the reference flow pressure difference, medium temperature, steady state and repeated operating conditions; save the measuring point location and original curve.
Filter dust holding and pressure drop test and control package
Test and assembly objects:Filters, existing air-liquid circuits and reference sources
Development and delivery:Record the flow pressure difference and feeding batch, and retain the method and status
Project input:Medium, flow pressure range, temperature, reference instrument and existing flow path
Acceptance method:Check the reference flow pressure difference, medium temperature, steady state and repeated operating conditions; save the measuring point location and original curve.
Air valve actuator opening and leakage test package
Test and assembly objects:Air valve, actuator and existing flow path reference
Development and delivery:Record flow rate at fluid/rotary stage at angle, drive and specified differential pressure
Project input:Medium, flow pressure range, temperature, reference instrument and existing flow path
Acceptance method:Check the reference flow pressure difference, medium temperature, steady state and repeated operating conditions; save the measuring point location and original curve.
Proportional valve current flow hysteresis test bench software
Test and assembly objects:Proportional valves, valve stages and actuators
Development and delivery:Automatic forward and reverse current scanning to form dead zone, hysteresis and flow curves
Project input:Medium, flow pressure range, temperature, reference instrument and existing flow path
Acceptance method:Fixed pressure difference and temperature comparison bidirectional scanning to check the difference between zero point and repeated scanning
Pneumatic valve response time and air consumption measurement package
Test and assembly objects:Pneumatic valves, volume chambers and flow meters
Development and delivery:Correlate drive edge, pressure build-up time and air consumption per cycle
Project input:Medium, flow pressure range, temperature, reference instrument and existing flow path
Acceptance method:Clear time start and end and standard condition conversion, separate valve idle action and volume results
Pressure regulating valve static pressure difference and flow droop test
Test and assembly objects:Pressure regulating valve and variable flow circuit
Development and delivery:Arrange inlet pressure and flow steps and record outlet pressure sag and recovery
Project input:Medium, flow pressure range, temperature, reference instrument and existing flow path
Acceptance method:Use independent pressure gauges to check the ascending and descending steps and steady-state sections, and save the temperature conditions
Fabric air permeability differential pressure flow test module
Test and assembly objects:Breathable fixtures and flow differential pressure meters
Development and delivery:Maintain the specified pressure difference and record the flow rate per unit area and leakage edge baseline
Project input:Medium, flow pressure range, temperature, reference instrument and existing flow path
Acceptance method:Standard orifice plate and seal blank review to clarify the effective area and gas state
Bipolar plate flow channel pressure drop and distribution test package
Test and assembly objects:Bipolar plates and passenger flow differential pressure tables
Development and delivery:Record the flow pressure difference of the branch and compare the working conditions of the output flow channel
Project input:Medium, flow pressure range, temperature, reference instrument and existing flow path
Acceptance method:Reference flow and pressure difference verification, gas status and fixture leakage are listed separately
Vacuum cleaner vacuum air volume and input power test package
Test and assembly objects:Customer supplied vacuum cleaner flow meter and power meter
Development and delivery:Record the air volume, negative pressure and power, and output the specified working condition curve
Project input:Medium, flow pressure range, temperature, reference instrument and existing flow path
Acceptance method:Reference flow negative pressure check, filter element and dust collection status are separated before and after
Coffee machine extraction pressure flow temperature recording package
Test and assembly objects:Coffee machines and measuring devices for customers
Development and delivery:Synchronize extraction pressure, flow, temperature and quality, and save recipe conditions
Project input:Medium, flow pressure range, temperature, reference instrument and existing flow path
Acceptance method:Refer to the instrument to check and control the amount of powder, and do not directly recommend the taste from the process curve.
Smart toilet valve pump and cleaning action test package
Test and assembly objects:Customer water lines, valve pumps and control panels
Development and delivery:Configure flow pressure and action timing, record mode exceptions and recovery
Project input:Medium, flow pressure range, temperature, reference instrument and existing flow path
Acceptance method:Original waterway reference value verification, medium and water supply conditions are fully recorded
Slit coating wet film thickness and liquid supply work package
Test and assembly objects:Customer-supplied coating machine and thickness measurement flow chain
Development and delivery:Synchronous belt speed, liquid supply and wet film thickness, output stable section record
Project input:Medium, flow pressure range, temperature, reference instrument and existing flow path
Acceptance method:Independent thickness reference check, theoretical liquid supply thickness and measured thickness are separated
Impedance, microresistance and electrical property characterization
Battery connection piece solder joint micro-resistance testing tool
Test and assembly objects:Connector, solder joint and four-wire measuring instrument
Development and delivery:Define measuring point contact and current conditions, record micro-resistance and re-measurement consistency
Project input:Reference electrical measuring instruments, wiring contacts, excitation range and temperature conditions
Acceptance method:Verify excitation, contact and wiring compensation, temperature and independent references, and record raw electrical performance data and calculation methods.
Busbar connection resistance and temperature rise station tools
Test and assembly objects:Connections, Low Resistance Meter, Temperature and Existing Load
Development and delivery:Correlate the original records of tightening status, four-wire resistance and temperature rise
Project input:Reference electrical measuring instruments, wiring contacts, excitation range and temperature conditions
Acceptance method:Verify excitation, contact and wiring compensation, temperature and independent references, and record raw electrical performance data and calculation methods.
Resistance welding dynamic resistance and electrode displacement monitoring package
Test and assembly objects:Customer-supplied welding machines, current voltage and displacement chains
Development and delivery:Calculate dynamic resistance for a specified period and correlate electrode displacement and solder joint number
Project input:Reference electrical measuring instruments, wiring contacts, excitation range and temperature conditions
Acceptance method:Check the voltage and current synchronization and zero point, and the quality conclusion needs to independently destroy the sample correspondence
Conductive fabric tensile resistance test package
Test and assembly objects:Conductive fabrics and customer-supplied electrical equipment
Development and delivery:Synchronous elongation and four-wire resistance, output loading and unloading resistance changes
Project input:Reference electrical measuring instruments, wiring contacts, excitation range and temperature conditions
Acceptance method:Check the contact resistance and the influence of the fixture, and retest independently after repeated stretching.
Fuel cell monolithic voltage inspection and acquisition module
Test and assembly objects:Customer supply voltage collector and fuel cell stack
Development and delivery:Map the cell sequence and save the stack current and single-chip voltage distribution
Project input:Reference electrical measuring instruments, wiring contacts, excitation range and temperature conditions
Acceptance method:Standard voltage source check channel, distinguish between disconnection and low voltage status
Joint measurement of membrane electrode contact resistance and compression working conditions
Test and assembly objects:Membrane electrode fixture and customer power tester
Development and delivery:Synchronize the pressing force, displacement and four-wire resistance to form an assembly condition curve
Project input:Reference electrical measuring instruments, wiring contacts, excitation range and temperature conditions
Acceptance method:Verification of empty fixture and standard piece, wire and electrode contact affects single row
Electrolytic cell impedance measurement linkage work package
Test and assembly objects:Customer-supplied EIS instrument and electrolytic cell test bench
Development and delivery:Configure the electrolytic cell EIS instrument interface, DC bias and steady-state conditions, and save impedance data and control records.
Project input:Reference electrical measuring instruments, wiring contacts, excitation range and temperature conditions
Acceptance method:Standard impedance is compared with the original instrument results, and the bench protection and AC disturbance range are pre-set.
Wind power slip ring multi-channel contact noise test package
Test and assembly objects:Slip rings, rotary tables and passenger power testers
Development and delivery:Record voltage drop, interruption and noise by corner and channel
Project input:Reference electrical measuring instruments, wiring contacts, excitation range and temperature conditions
Acceptance method:The reference signal checks the noise floor and sampling dead zone, and the empty station baseline is in a single column
Physical signal simulation and fault injection
Development of battery balancing channel verification tool
Test and assembly objects:Balance board and simulated cell load
Development and delivery:Measure channel action current, timing and thermal status, and output equalization process records
Project input:Interface under test, electrical range, reference signal source, allowable failure and recovery use cases
Acceptance method:First, verify the output electrical range, timing and reference consistency on the bench, and check the allowable faults and the response and recovery of the terminal under test.
Multi-channel power supply power-on sequence and power-down test tool
Test and assembly objects:Multi-power domain board and controllable power supply
Development and delivery:Synchronize output timing, acquire rail voltage and reset status, and reproduce exceptions
Project input:Interface under test, electrical range, reference signal source, allowable failure and recovery use cases
Acceptance method:First, verify the output electrical range, timing and reference consistency on the bench, and check the allowable faults and the response and recovery of the terminal under test.
Rework board fault injection and symptom reproduction tool
Test and assembly objects:Defined faults and controllable board-level nodes
Development and delivery:Combine open and short circuit simulations, logs, and reference samples to generate fault recurrence experiments
Project input:Interface under test, electrical range, reference signal source, allowable failure and recovery use cases
Acceptance method:First, verify the output electrical range, timing and reference consistency on the bench, and check the allowable faults and the response and recovery of the terminal under test.
Compressor start, stop and protection status verification tool
Test and assembly objects:Compressor matching controller and existing testing machine
Development and delivery:Reproduce start/stop and specified protection inputs, record command status and measurement signals
Project input:Interface under test, electrical range, reference signal source, allowable failure and recovery use cases
Acceptance method:First, verify the output electrical range, timing and reference consistency on the bench, and check the allowable faults and the response and recovery of the terminal under test.
Power electrical testing and load instrument linkage
Battery charging and discharging and thermostat linkage testing software
Test and assembly objects:Already have charging and discharging cabinets, thermostats and samples
Development and delivery:Arrange loops, pause and resume, and associate individual cells and temperature raw data
Project input:Existing power supplies/loads/instruments, power ranges, test loops and approved operating conditions
Acceptance method:Check the instrument range, bandwidth, probe, load conditions and termination status, and distinguish between instrument readings and complete energy links.
Power supply dynamic load response test software development
Test and assembly objects:Power supplies, electronic loads and oscilloscopes
Development and delivery:Program load steps and output voltage recovery, overshoot and raw waveform indexing
Project input:Existing power supplies/loads/instruments, power ranges, test loops and approved operating conditions
Acceptance method:Check the instrument range, bandwidth, probe, load conditions and termination status, and distinguish between instrument readings and complete energy links.
Power supply energy efficiency and standby power consumption automatic testing tool
Test and assembly objects:Specify power supplies, power analyzers, and loads
Development and delivery:Program input load conditions and associate power range, steady state and results tables
Project input:Existing power supplies/loads/instruments, power ranges, test loops and approved operating conditions
Acceptance method:Check the instrument range, bandwidth, probe, load conditions and termination status, and distinguish between instrument readings and complete energy links.
Terminal power consumption and battery life condition reproduction tool
Test and assembly objects:Terminal, power analyzer and business scripts are already available
Development and delivery:Recurring wake-up captures networked sleep, and correlates power supply side energy and business status
Project input:Existing power supplies/loads/instruments, power ranges, test loops and approved operating conditions
Acceptance method:Check the instrument range, bandwidth, probe, load conditions and termination status, and distinguish between instrument readings and complete energy links.
Machine tool energy consumption and process status segmentation analysis package
Test and assembly objects:Machine tool power and process status records
Development and delivery:Distinguish standby, idling and cutting energy consumption, and associate processing batches
Project input:Existing power supplies/loads/instruments, power ranges, test loops and approved operating conditions
Acceptance method:The power integral is compared with the reference meter. The status is missing in a single column. Guessing the process is prohibited.
Voltage sag short interruption test orchestration package
Test and assembly objects:Customer-supplied programmable power and device status chain
Development and delivery:Arrange dip interruptions according to customer supply waveforms and record restart and running status
Project input:Existing power supplies/loads/instruments, power ranges, test loops and approved operating conditions
Acceptance method:Independent waveform verification amplitude duration, status monitoring delay needs to be confirmed separately
Comparison of electrolytic cell DC operating conditions and gas production measurement
Test and assembly objects:Customer power supply tank stand and gas metering chain
Development and delivery:Synchronize current, voltage, temperature, pressure and gas production, retain conversion conditions
Project input:Existing power supplies/loads/instruments, power ranges, test loops and approved operating conditions
Acceptance method:Standard instrument verification and gas volume status conversion and recalculation, without relying on current to estimate actual gas production
Fuel cell polarization curve bench arrangement package
Test and assembly objects:Customer supplied fuel cell bench and load
Development and delivery:Arrange and approve working conditions, record steady-state conditions and current and voltage curves
Project input:Existing power supplies/loads/instruments, power ranges, test loops and approved operating conditions
Acceptance method:Independent power reference review, the point mark of unsteady temperature and humidity flow is invalid
Electric kettle temperature control and dry boil protection record package
Test and assembly objects:Customer-supplied test equipment and electric kettle
Development and delivery:Record temperature, power, interruption and original device protection status
Project input:Existing power supplies/loads/instruments, power ranges, test loops and approved operating conditions
Acceptance method:Reference temperature power and independent breaking detection and verification, protection test according to approved working conditions
Plating tank current waveform and plating batch tool
Test and assembly objects:Customer power readings and workpiece batches
Development and delivery:Correlate current integration, bath analysis and coating measurement results
Project input:Existing power supplies/loads/instruments, power ranges, test loops and approved operating conditions
Acceptance method:Independent current reference check, the actual coating thickness is not determined by the electric quantity alone.
Protocol simulation, recording, playback and diagnostics
BMS and inverter protocol simulation use case package
Test and assembly objects:Specify the BMS protocol and the gateway under test
Development and delivery:Provide status messages, timeouts, invalid values, recovery sequences and use case records of the specified BMS and the inverter.
Project input:Target protocol, electrical interface, authorization message, status and timing samples
Acceptance method:Check the message fields, cycle, status, timeout and recovery, and record the simulation results and real device electrical/compatibility verification separately.
Ground load bus record playback toolkit
Test and assembly objects:Specify buses, messages, and ground receivers
Development and delivery:Configure ground load bus recording and playback, check time fields, status and exception sequences.
Project input:Target protocol, electrical interface, authorization message, status and timing samples
Acceptance method:Check the message fields, cycle, status, timeout and recovery, and record the simulation results and real device electrical/compatibility verification separately.
Burning, board final inspection and identity traceability
Battery interface boardEOL and identity traceability work package
Test and assembly objects:One battery interface board SKU
Development and delivery:Configure the battery interface board programming, fault input, firmware version and serial number verification processes.
Project input:Single SKU, test points, firmware, normal fault samples and serial number rules
Acceptance method:Use normal and faulty samples to check test points, misjudgments and missed tests, version identity and tooling repeatability. The complete cycle includes loading, unloading and uploading.
USBLoopback fixture package with interface module function
Test and assembly objects:Designated interface modules, wiring harnesses and test terminals
Development and delivery:Configure USB with interface module power supply, function loopback, identity readback and error use cases.
Project input:Single SKU, test points, firmware, normal fault samples and serial number rules
Acceptance method:Use normal and faulty samples to check test points, misjudgments and missed tests, version identity and tooling repeatability. The complete cycle includes loading, unloading and uploading.
Display touch and button synchronization production test package
Test and assembly objects:Screen, touch, buttons and target motherboard
Development and delivery:Define the synchronous production testing process of display patterns, touch points, key signals and workstation records.
Project input:Single SKU, test points, firmware, normal fault samples and serial number rules
Acceptance method:Use normal and faulty samples to check test points, misjudgments and missed tests, version identity and tooling repeatability. The complete cycle includes loading, unloading and uploading.
Camera module chart and dead pixel function test package
Test and assembly objects:Specify modules, charts and fixed imaging fixtures
Development and delivery:Configure camera exposure, frame acquisition, image card and dead pixel function checks, and retain abnormal images and versions.
Project input:Single SKU, test points, firmware, normal fault samples and serial number rules
Acceptance method:Use normal and faulty samples to check test points, misjudgments and missed tests, version identity and tooling repeatability. The complete cycle includes loading, unloading and uploading.
Industrial motor winding electrical testing and version traceability package
Test and assembly objects:Motors, low resistance/insulation instruments and tooling
Development and delivery:Combined electrical testing and production testing platforms to save wiring, temperature, parameters and versions
Project input:Single SKU, test points, firmware, normal fault samples and serial number rules
Acceptance method:Use normal and faulty samples to check test points, misjudgments and missed tests, version identity and tooling repeatability. The complete cycle includes loading, unloading and uploading.
Automatic inspection of reference parts and tool drift monitoring tool
Test and assembly objects:Standard parts, workstations and reference instruments
Development and delivery:Schedule inspections, compare workstation/time changes and manage result review after failure
Project input:Single SKU, test points, firmware, normal fault samples and serial number rules
Acceptance method:Use normal and faulty samples to check test points, misjudgments and missed tests, version identity and tooling repeatability. The complete cycle includes loading, unloading and uploading.
Automatic function regression package before and after environmental testing
Test and assembly objects:Defined functional interfaces, environmental equipment and samples
Development and delivery:Combine production testing and instrumentation processes, and correlate pre- and post-differences, configurations and failure sections
Project input:Single SKU, test points, firmware, normal fault samples and serial number rules
Acceptance method:Use normal and faulty samples to check test points, misjudgments and missed tests, version identity and tooling repeatability. The complete cycle includes loading, unloading and uploading.
Test adapter board and probe interface board design package
Test and assembly objects:Customer supplied pin tables, ranges and instrument interfaces
Development and delivery:Delivery of interface circuit, PCB and controlled power-on verification matrix
Project input:Single SKU, test points, firmware, normal fault samples and serial number rules
Acceptance method:Continuity, leakage and signal integrity are measured according to the project indicators to avoid just looking at the schematic diagram.
Insulation, electrical status and special instrument dispatch
DC contactor breaking sequence verification tooling
Test and assembly objects:Specified contactor and existing test circuit
Development and delivery:Record coil excitation, auxiliary contacts, main circuit response and rebound
Project input:Off-the-shelf electrical instrumentation, approval processes, electrical scope, tooling and wiring
Acceptance method:Wiring, triggering, status and results are verified using existing instrumentation and approved procedures. Instrument protection and power loops are verified by the appropriate responsible party.
Relay contact bounce and conduction life test package
Test and assembly objects:Low voltage relays, loads and acquisition links
Development and delivery:Synchronize contact voltage and excitation, record contact status after bounce and cycle
Project input:Off-the-shelf electrical instrumentation, approval processes, electrical scope, tooling and wiring
Acceptance method:Wiring, triggering, status and results are verified using existing instrumentation and approved procedures. Instrument protection and power loops are verified by the appropriate responsible party.
Connector Low Voltage Continuity and Pin Mapping Test Kit
Test and assembly objects:Wiring harness, adapter board and pin drawings
Development and delivery:Configure low-voltage continuity, misconnection, and mapping checks based on connector pinout and electrical range.
Project input:Off-the-shelf electrical instrumentation, approval processes, electrical scope, tooling and wiring
Acceptance method:Wiring, triggering, status and results are verified using existing instrumentation and approved procedures. Instrument protection and power loops are verified by the appropriate responsible party.
Ground harness and load interface automatic inspection package
Test and assembly objects:Load harness, pins and low voltage analog sources
Development and delivery:Output ground harness connections, interface timing and status inspection matrices and automatic inspection records.
Project input:Off-the-shelf electrical instrumentation, approval processes, electrical scope, tooling and wiring
Acceptance method:Wiring, triggering, status and results are verified using existing instrumentation and approved procedures. Instrument protection and power loops are verified by the appropriate responsible party.
Underwater connector contact insulation and plugging test kit
Test and assembly objects:Connectors, low voltage instruments and motion fixtures
Development and delivery:Correlation of plug and unplug status, contact resistance and specified insulation measurement records
Project input:Off-the-shelf electrical instrumentation, approval processes, electrical scope, tooling and wiring
Acceptance method:Wiring, triggering, status and results are verified using existing instrumentation and approved procedures. Instrument protection and power loops are verified by the appropriate responsible party.
Contactor Coil and Pick-up Release Test Kit
Test and assembly objects:Contactors, controlled low voltage power supplies and collection
Development and delivery:Configure pickup release, rebound and status matrix according to the common electrical platform
Project input:Off-the-shelf electrical instrumentation, approval processes, electrical scope, tooling and wiring
Acceptance method:Wiring, triggering, status and results are verified using existing instrumentation and approved procedures. Instrument protection and power loops are verified by the appropriate responsible party.
Insulation withstand voltage meter and product process integration package
Test and assembly objects:Existing qualified instruments, tooling and approved testing procedures
Development and delivery:Responsible for equipment interface, steps, results and identity records, does not replace instrument protection design
Project input:Off-the-shelf electrical instrumentation, approval processes, electrical scope, tooling and wiring
Acceptance method:Wiring, triggering, status and results are verified using existing instrumentation and approved procedures. Instrument protection and power loops are verified by the appropriate responsible party.
Partial discharge instrument data triggering and result management tools
Test and assembly objects:Customer-supplied PD instruments, calibration data and test pieces
Development and delivery:Correlate working condition triggers, original waveforms, backgrounds and manual review results
Project input:Off-the-shelf electrical instrumentation, approval processes, electrical scope, tooling and wiring
Acceptance method:Wiring, triggering, status and results are verified using existing instrumentation and approved procedures. Instrument protection and power loops are verified by the appropriate responsible party.
Ground continuity and protective conductor testing work package
Test and assembly objects:Special instruments and assembly workpieces for customers
Development and delivery:Configure test points and contact checks, save loop results and identities
Project input:Off-the-shelf electrical instrumentation, approval processes, electrical scope, tooling and wiring
Acceptance method:Standard resistance and contact failure sample verification, test current comes from the original instrument
Leakage current meter wiring status and mode arrangement package
Test and assembly objects:Customer-supplied leakage current meter and controlled test fixture
Development and delivery:Switch according to customer supply mode and read the results, record the wiring and power supply status
Project input:Off-the-shelf electrical instrumentation, approval processes, electrical scope, tooling and wiring
Acceptance method:Compare it item by item with the original instrument mode. Abnormal wiring shall not be automatically continued.
Elevator door lock contact and mechanical linkage record package
Test and assembly objects:Customer door lock testing agency
Development and delivery:Synchronized lock hook displacement, contact status and action times
Project input:Off-the-shelf electrical instrumentation, approval processes, electrical scope, tooling and wiring
Acceptance method:Reference displacement and oscillographic record verification do not replace special equipment inspection
Rail transit relay suction drop and contact synchronization test package
Test and assembly objects:Customer-supplied relay station and collector
Development and delivery:Record suction drop value, action time and contact bounce according to voltage scan
Project input:Off-the-shelf electrical instrumentation, approval processes, electrical scope, tooling and wiring
Acceptance method:Reference voltage and time base check, component standards specified by customer
Force-displacement and assembly process curve
Dexterous tendon rope tension and stroke test tool
Test and assembly objects:Tendons, drives and finger-end mechanisms
Development and delivery:Synchronize tension stroke and drive status, compare relaxation and return conditions
Project input:Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture
Acceptance method:Check the real force displacement, loading speed and fixture, and save the normal abnormal sample curve; the actuator air pressure cannot be used to replace the workpiece force.
Riveting and stamping process curve monitoring module
Test and assembly objects:Riveting machine or press and force displacement signal
Development and delivery:Collect curves step by step, retaining reference envelopes and abnormal artifact indexes
Project input:Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture
Acceptance method:Check the real force displacement, loading speed and fixture, and save the normal abnormal sample curve; the actuator air pressure cannot be used to replace the workpiece force.
Connector insertion and extraction retention and cycle test tooling
Test and assembly objects:Connectors and plug-in motion fixtures
Development and delivery:Records insertion and extraction force travel, conduction status and cycle count
Project input:Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture
Acceptance method:Check the real force displacement, loading speed and fixture, and save the normal abnormal sample curve; the actuator air pressure cannot be used to replace the workpiece force.
Key encoder operating force and electrical signal synchronization test
Test and assembly objects:Buttons or knobs and reference force angle devices
Development and delivery:Correlate force displacement or torque angle to electrical output, trigger point and return stroke
Project input:Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture
Acceptance method:Check the real force displacement, loading speed and fixture, and save the normal abnormal sample curve; the actuator air pressure cannot be used to replace the workpiece force.
Bonding tension and shear testing equipment software package
Test and assembly objects:Existing loader, fixture and reference force link
Development and delivery:Control loading steps, acquire force displacements and correlate fracture locations and results
Project input:Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture
Acceptance method:Check the real force displacement, loading speed and fixture, and save the normal abnormal sample curve; the actuator air pressure cannot be used to replace the workpiece force.
Load cell eccentric load and creep test package
Test and assembly objects:Weighing cells, loading fixtures and reference loads
Development and delivery:Record load position, time and output changes to form eccentric load creep data
Project input:Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture
Acceptance method:Check the real force displacement, loading speed and fixture, and save the normal abnormal sample curve; the actuator air pressure cannot be used to replace the workpiece force.
Wearing Contact Pressure and Wearing Mechanism Test Kit
Test and assembly objects:Wearing mechanism, representative load and force displacement reference
Development and delivery:Record the contact position, clamping force and mechanism stroke and associate the sample configuration
Project input:Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture
Acceptance method:Check the real force displacement, loading speed and fixture, and save the normal abnormal sample curve; the actuator air pressure cannot be used to replace the workpiece force.
Syringe thrust displacement and residual volume testing tool
Test and assembly objects:Syringe consumables and reference force displacement gantry
Development and delivery:Collect starting/sliding force, stroke and end residual weight to form engineering records
Project input:Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture
Acceptance method:Check the real force displacement, loading speed and fixture, and save the normal abnormal sample curve; the actuator air pressure cannot be used to replace the workpiece force.
Food packaging seal strength and leakage test kit
Test and assembly objects:Packaging samples, loading fixtures and leak detection instruments
Development and delivery:Configure strength and leak detection instruments according to the sealing geometry and test methods, and retain the original curves and results.
Project input:Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture
Acceptance method:Check the real force displacement, loading speed and fixture, and save the normal abnormal sample curve; the actuator air pressure cannot be used to replace the workpiece force.
Adhesive peel and shear curve testing software
Test and assembly objects:Bonded specimen, loading device and reference force displacement
Development and delivery:Control loading and record specimen geometry, velocity, force curves and failure tags
Project input:Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture
Acceptance method:Check the real force displacement, loading speed and fixture, and save the normal abnormal sample curve; the actuator air pressure cannot be used to replace the workpiece force.
Film puncture and friction coefficient test package
Test and assembly objects:Film, loading fixture and reference force displacement
Development and delivery:Use a common loading platform to configure the puncture or friction process and save the original curve
Project input:Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture
Acceptance method:Check the real force displacement, loading speed and fixture, and save the normal abnormal sample curve; the actuator air pressure cannot be used to replace the workpiece force.
Multi-sample plug-in and bend life test control package
Test and assembly objects:Motion Fixtures, Samples, and Electrical Switching References
Development and delivery:Configure cycle actions, stop conditions and sample positions, output times and failure records
Project input:Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture
Acceptance method:Check the real force displacement, loading speed and fixture, and save the normal abnormal sample curve; the actuator air pressure cannot be used to replace the workpiece force.
Cylinder friction and low speed crawl test tool
Test and assembly objects:Cylinder, load and displacement reference
Development and delivery:Synchronize the pressure and displacement of the two chambers, output starting friction and low-speed speed fluctuations
Project input:Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture
Acceptance method:Compare reference force and displacement to distinguish seal friction and external loading effects
Bearing preload assembly force and torque combined tooling
Test and assembly objects:Bearing components and assembly mechanisms
Development and delivery:Correlate the press-fit displacement, assembly force and post-assembly rotation torque to form a workpiece record
Project input:Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture
Acceptance method:Repeat the test with qualified and unqualified benchmark components to distinguish tooling friction and bearing resistance.
Forming Limit and Cupping Test Data Tool
Test and assembly objects:Customer-supplied cupping or forming testing machine
Development and delivery:Synchronized force stroke and customer supply deformation images to form sample condition comparison
Project input:Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture
Acceptance method:Check specimen geometry and fracture events, do not push all forming limits from a single curve
Rubber compression permanent deformation tooling recording module
Test and assembly objects:Compression grips, specimens and thickness gauges
Development and delivery:Manage compression amount, recovery time and thickness results, and output calculation basis
Project input:Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture
Acceptance method:Recalculation using independent thickness data, time starting point and temperature must be traceable
Plastic pipe ring stiffness and flattening test package
Test and assembly objects:Ring pipe sample and customer-supplied compression testing machine
Development and delivery:Output load curve and circumferential deformation based on displacement and diameter
Project input:Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture
Acceptance method:Check the length and diameter of the sample and recalculate independently according to the customer-supplied formula.
Sealing strip corner stretch and compression rebound tooling kit
Test and assembly objects:Sealing strip corners and clamps
Development and delivery:Configure sealing strip joint angle clamping, tension and compression rebound measurements, and save working condition curves and damage locations.
Project input:Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture
Acceptance method:Check the clamping slippage and compare it with the reference sample to record the damage location.
Yarn tension fluctuation and end-break event collection package
Test and assembly objects:Yarn path, tension and length reference
Development and delivery:Correlate tension spectrum, end breaks and splice events by speed
Project input:Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture
Acceptance method:The weight checks the tension chain and length, and the vibration of the empty yarn path is separated from the yarn fluctuation.
Fabric tear tensile multi-clamp test process package
Test and assembly objects:Customer-supplied testing machines and fabric fixtures
Development and delivery:Manage specimens, fixtures, and tear peak results by latitude and longitude
Project input:Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture
Acceptance method:Manual reference curve recalculation to record clamping slippage and non-effective damage
Zipper reciprocating pull and pull force test package
Test and assembly objects:Zipper sample and reciprocating mechanism
Development and delivery:Synchronize pull force, position and cycle to save stuck and out-of-gear events
Project input:Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture
Acceptance method:Retest the reference sample to deduct the mechanism friction and verify the cycle leakage meter
Carton compression and stacking creep test package
Test and assembly objects:Carton and customer-supplied pressure testing machines
Development and delivery:Correlate box shape, humidity and load to preserve peak compression or long-term deformation
Project input:Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture
Acceptance method:Review of standard load and displacement, breakdown of instantaneous compression and long-term stacking results
Paperboard edge and flat pressing instrument data work package
Test and assembly objects:Cardboard and customer supply testing machine
Development and delivery:Bind the flute type, direction and specimen size, and output effective curves and damage records
Project input:Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture
Acceptance method:Use confirmation samples and manual recalculation to eliminate clamping or trimming abnormalities.
Heat sealing window and hot tack strength test control package
Test and assembly objects:Customer-supplied heat sealing machine and strength measuring device
Development and delivery:Correlation between temperature, pressure time and tension at specified time after heat sealing
Project input:Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture
Acceptance method:Independent temperature verification and re-inspection with specified waiting time, normal temperature peeling results are listed separately
Glass four-point bending load displacement recording package
Test and assembly objects:Glass specimens and customer-supplied bending devices
Development and delivery:Record support span, load displacement and damage events
Project input:Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture
Acceptance method:Check the fulcrum and load distribution, damage location and invalid test retention
Concrete compression testing machine network acquisition transformation
Test and assembly objects:Customer supplied presses and test blocks
Development and delivery:Read load speed and peak value, correlate test block maintenance and dimensions
Project input:Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture
Acceptance method:The reference force is checked and the testing machine control remains the original machine; if the dimensions are missing, the strength shall not be automatically given.
Building insulation board drawing and bonding test package
Test and assembly objects:Insulation materials and customer-supplied drawing devices
Development and delivery:Record pullout load, area and fracture location
Project input:Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture
Acceptance method:Independent area verification and failure mode confirmation, interface failures and substrate failures are separated
Anchor pullout load displacement and retention test package
Test and assembly objects:Customer-supplied anchor bolt loading device and displacement table
Development and delivery:Record the loading, unloading and load-holding displacements, and output the working condition trajectory
Project input:Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture
Acceptance method:Force and displacement reference verification, support deformation must not be used as anchor slip
Seat adjustment mechanism force displacement life work package
Test and assembly objects:Passenger seat mechanism and loading tooling
Development and delivery:Record operating current, displacement, operating force and number of jams
Project input:Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture
Acceptance method:Independent stroke and load verification, no-load and loaded life statistics respectively
Door seal compression and door closing force test package
Test and assembly objects:Door assembly and passenger power displacement device
Development and delivery:Correlation of compression state, closing force and locking position
Project input:Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture
Acceptance method:Hinge friction and sealing contribution recorded separately against reference door assembly
Window lift clamping force and position recording package
Test and assembly objects:Customer supplied lift test bench and force sensor
Development and delivery:Record clamping position, force and original controller action
Project input:Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture
Acceptance method:Use specified test pieces and independent force references, and do not write tooling verification as regulations.
Automatic door opening and closing force and obstacle response test package
Test and assembly objects:Door operators, passenger barriers and force-displacement chains
Development and delivery:Correlate opening and closing trajectories, contact forces and controller responses
Project input:Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture
Acceptance method:Reference force position review, the actual protection level is confirmed by the complete machine plan
Furniture drawer slide push-pull force and life tooling
Test and assembly objects:Drawer slides and customer supply circulation mechanism
Development and delivery:Record loads, push-pull forces and cycles to identify sticking and loosening events
Project input:Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture
Acceptance method:Load and stroke reference retest, mechanism body friction baseline single row
Roll-to-roll tension and edge position data tools
Test and assembly objects:Customer supplied winding system and tension displacement input
Development and delivery:Related to roll diameter, tension and edge deviation, it does not replace the original motion closed loop
Project input:Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture
Acceptance method:Reference tension and edge scale re-inspection, roll diameter changes and slippage are separated
Pressure, vacuum and pressure holding process measurement and control
Vacuum cup gripping circuit test package
Test and assembly objects:Suction cup, vacuum source and valve group
Development and delivery:Record the negative pressure establishment, maintenance and release curves according to the specified test piece
Project input:Specimen medium, pressure/vacuum range, volume temperature, reference instrument, flow path and fixture
Acceptance method:Check pressure/time and repeat process under specified medium, volume, temperature and reference instrument; pressure drop does not directly convert to leakage rate.
Cavity vacuum gauge and valve sequence joint adjustment module
Test and assembly objects:Existing vacuum chamber, regulation and valve manifold
Development and delivery:Realize pumping, steady state, vacuum and fault processes, and record vacuum curves and actions
Project input:Specimen medium, pressure/vacuum range, volume temperature, reference instrument, flow path and fixture
Acceptance method:Check pressure/time and repeat process under specified medium, volume, temperature and reference instrument; pressure drop does not directly convert to leakage rate.
Airborne pressure and airspeed signal ground simulation tool
Test and assembly objects:Existing air circuit reference, pressure source and target sensors
Development and delivery:Controls the air pressure changes on the stand and records the response, and is not responsible for conclusions about the flight environment.
Project input:Specimen medium, pressure/vacuum range, volume temperature, reference instrument, flow path and fixture
Acceptance method:Check pressure/time and repeat process under specified medium, volume, temperature and reference instrument; pressure drop does not directly convert to leakage rate.
Underwater electronic cabin pressure cycle monitoring tool
Test and assembly objects:Existing pressure chamber, electronic chamber prototypes and reference instruments
Development and delivery:Linked pressure cycle, cabin humidity and interface status to record the test piece process
Project input:Specimen medium, pressure/vacuum range, volume temperature, reference instrument, flow path and fixture
Acceptance method:Check pressure/time and repeat process under specified medium, volume, temperature and reference instrument; pressure drop does not directly convert to leakage rate.
Industrial vacuum pump pumping speed and ultimate pressure measurement and control package
Test and assembly objects:Vacuum pump, existing volume and vacuum reference
Development and delivery:Arrange pumping conditions and output time pressure, temperature and reference conditions
Project input:Specimen medium, pressure/vacuum range, volume temperature, reference instrument, flow path and fixture
Acceptance method:Check pressure/time and repeat process under specified medium, volume, temperature and reference instrument; pressure drop does not directly convert to leakage rate.
Hydraulic cylinder internal leakage and pressure maintaining displacement work package
Test and assembly objects:Hydraulic cylinder and isolation circuit
Development and delivery:Align pressure, charge flow and piston drift, and record internal and external leakage separately
Project input:Specimen medium, pressure/vacuum range, volume temperature, reference instrument, flow path and fixture
Acceptance method:After verification of the isolation valve and no-load baseline, compare the reference flow rate and displacement, and determine internal leakage alone without relying on pressure drop.
Accumulator precharging and energy release process acquisition tool
Test and assembly objects:Customer-supplied accumulator test device
Development and delivery:Collect pre-charge pressure, liquid side volume and energy release curve according to the established process
Project input:Specimen medium, pressure/vacuum range, volume temperature, reference instrument, flow path and fixture
Acceptance method:Compare with reference pressure and volume data to record temperature and isolation status
Fabric hydrostatic pressure meter measurement and water seepage marking
Test and assembly objects:Customer water pressure fixture and observation images
Development and delivery:Record the pressure and water seepage event time according to the established pressure increase
Project input:Specimen medium, pressure/vacuum range, volume temperature, reference instrument, flow path and fixture
Acceptance method:Reference pressure is used to review the pressure increase rate, and separate edge leakage and effective water leakage events.
Door and window airtight and watertight wind pressure resistance test interface package
Test and assembly objects:Customer-supplied door and window inspection bench and test pieces
Development and delivery:Synchronize pressure difference, spray and displacement, and save leakage events according to working conditions
Project input:Specimen medium, pressure/vacuum range, volume temperature, reference instrument, flow path and fixture
Acceptance method:Reference pressure difference and spray verification, the boundary seal of the specimen is separated from the body leakage
Quantitative perfusion, metering and weighing closed loop
Potting material vacuum degassing and proportioning control module
Test and assembly objects:Existing glue dispensing machine, vacuum chamber and weighing
Development and delivery:Control the proportion, vacuum process and mixing sequence to form batch parameter records
Project input:Allowed media or materials, weighing/flow reference, pump valve and container/action conditions
Acceptance method:Check mass/volume, time and repeatability with independent weighing/flow reference and record material, temperature and evaporation/residual conditions.
Quantitative water sampling and sample traceability tool for unmanned ships
Test and assembly objects:Sampling pump valves, containers and weighing or flow references
Development and delivery:Control the cleaning, sampling and retention process, and record bottle position, sampling volume and status
Project input:Allowed media or materials, weighing/flow reference, pump valve and container/action conditions
Acceptance method:Check mass/volume, time and repeatability with independent weighing/flow reference and record material, temperature and evaporation/residual conditions.
Water treatment dosing dosage and pump calibration tool
Test and assembly objects:Metering pumps, weighing references and permitted media
Development and delivery:Arrange dosing conditions, output unit time dosing volume, repeatability and calibration table
Project input:Allowed media or materials, weighing/flow reference, pump valve and container/action conditions
Acceptance method:Check mass/volume, time and repeatability with independent weighing/flow reference and record material, temperature and evaporation/residual conditions.
Feed dosage weighing and calibration tool
Test and assembly objects:Feeder, weighing reference and representative pellets
Development and delivery:Record feeding pulse, quality and material level, and establish calibration and repeatability records
Project input:Allowed media or materials, weighing/flow reference, pump valve and container/action conditions
Acceptance method:Check mass/volume, time and repeatability with independent weighing/flow reference and record material, temperature and evaporation/residual conditions.
Refrigerant charging, weighing and vacuuming process module
Test and assembly objects:Existing filling equipment, weighing and vacuum reference
Development and delivery:Arrange evacuation, inspection, metering, filling and termination, and record the identity of equipment and workpieces
Project input:Allowed media or materials, weighing/flow reference, pump valve and container/action conditions
Acceptance method:Check mass/volume, time and repeatability with independent weighing/flow reference and record material, temperature and evaporation/residual conditions.
Grease quantitative supply and distribution consistency tooling
Test and assembly objects:Dispenser and weighing reference
Development and delivery:Weigh a single grease supply outlet by outlet and record the effect of interval and temperature on the difference.
Project input:Allowed media or materials, weighing/flow reference, pump valve and container/action conditions
Acceptance method:Repeat the collection and weighing and check the residue to distinguish between start-up emptying and effective measurement.
Spray pump dose and rebound life tooling
Test and assembly objects:Spray pump and weighing loading device
Development and delivery:Synchronize operating force, stroke and mass per press to record rebound failure
Project input:Allowed media or materials, weighing/flow reference, pump valve and container/action conditions
Acceptance method:Weighing recovery is separated from empty pressing and is included in the residual and evaporation baselines.
Powder feeder mass flow rate and pulsation test package
Test and assembly objects:Powder feeder, collection unit and weighing chain
Development and delivery:Record the set value, output quality time and short-term pulsation
Project input:Allowed media or materials, weighing/flow reference, pump valve and container/action conditions
Acceptance method:Weighing points are compared with collection and recovery amounts to prevent delays from being regarded as flow deviations.
3D printing extrusion head temperature and flow calibration work package
Test and assembly objects:Extrusion head and customer-supplied temperature weighing chain
Development and delivery:Correlate command feed, actual mass and temperature to output extrusion characteristics
Project input:Allowed media or materials, weighing/flow reference, pump valve and container/action conditions
Acceptance method:Collect and weigh for verification, start lag and stable extrusion statistics separately
Powder tap density and repose angle collection tool
Test and assembly objects:Customer supplied vibrators, graduated cylinders and graphic scales
Development and delivery:Bind mass volume and times, output specified density and angle records
Project input:Allowed media or materials, weighing/flow reference, pump valve and container/action conditions
Acceptance method:The weighing volume and image scale are independently checked, and the method and filling process are fixed.
Wind power lubrication system grease supply remote verification package
Test and assembly objects:Customer-supplied grease metering and valve position interface
Development and delivery:Check the wind power lubrication system's grease supply action, actual supply volume and branch circuit alarms, and keep on-site verification records.
Project input:Allowed media or materials, weighing/flow reference, pump valve and container/action conditions
Acceptance method:Compare the actual collection amount with the action log. Empty actions cannot be regarded as successful fat supply.
Floor washing machine liquid supply recovery and residual water tooling
Test and assembly objects:Customer-supplied floor scrubber and weighing collection device
Development and delivery:Synchronize liquid supply, recovery volume and ground residue, and record operating conditions
Project input:Allowed media or materials, weighing/flow reference, pump valve and container/action conditions
Acceptance method:Weighing mass balance verification, evaporation and non-recoverable residues are listed separately
Vacuum drying end point and weight loss test package
Test and assembly objects:Customer-supplied vacuum drying oven and weighing device
Development and delivery:Record temperature, pressure and weight loss trends, and mark endpoint candidates according to approved rules
Project input:Allowed media or materials, weighing/flow reference, pump valve and container/action conditions
Acceptance method:The weighing baseline is compared with the independent water content reference. Weight loss does not automatically equal water content.
Thermal performance, temperature field and thermal cycle measurement and control
Chip carrier board temperature control station and electrical measurement synchronization program
Test and assembly objects:Temperature control table, device board and measuring instrument
Development and delivery:Correlate actual temperature, steady state and electrical measurement steps, and save sample versions and original data
Project input:Heat source and cooling loop, temperature power reference, specimen installation and steady state definition
Acceptance method:Check temperature and power references, heat loss/installation conditions, steady state and thermal balance calibers, and retain calculation inputs and residuals.
Temperature probe multi-channel comparison and calibration tool
Test and assembly objects:Probes, constant temperature sources and reference thermometers
Development and delivery:Collect steady state, channel difference and temperature rise and fall records, and output comparison parameters
Project input:Heat source and cooling loop, temperature power reference, specimen installation and steady state definition
Acceptance method:Check temperature and power references, heat loss/installation conditions, steady state and thermal balance calibers, and retain calculation inputs and residuals.
Sample temperature-controlled incubation and multi-point temperature difference verification tool
Test and assembly objects:Incubation device, sample position and temperature reference
Development and delivery:Control the temperature rise and fall and record the steady state, position difference and lid opening recovery
Project input:Heat source and cooling loop, temperature power reference, specimen installation and steady state definition
Acceptance method:Check temperature and power references, heat loss/installation conditions, steady state and thermal balance calibers, and retain calculation inputs and residuals.
Heat exchanger thermal balance and performance testing software
Test and assembly objects:Heat exchanger, existing hot and cold sources and temperature flow pressure reference
Development and delivery:Synchronize the thermal conditions on both sides, record the steady state and thermal balance difference and the calculation process
Project input:Heat source and cooling loop, temperature power reference, specimen installation and steady state definition
Acceptance method:Check temperature and power references, heat loss/installation conditions, steady state and thermal balance calibers, and retain calculation inputs and residuals.
Heat pump defrost and multi-condition test scheduling software
Test and assembly objects:Existing heat pump and environmental testing equipment
Development and delivery:Correlate mode, temperature, humidity, pressure and power, record switching and recovery process
Project input:Heat source and cooling loop, temperature power reference, specimen installation and steady state definition
Acceptance method:Check temperature and power references, heat loss/installation conditions, steady state and thermal balance calibers, and retain calculation inputs and residuals.
Heat treatment furnace multi-point temperature measurement and furnace loading batch tools
Test and assembly objects:Customer-supplied furnace temperature system and workpiece thermocouple
Development and delivery:Form furnace-following curve, furnace loading position and batch traceability records
Project input:Heat source and cooling loop, temperature power reference, specimen installation and steady state definition
Acceptance method:Use the reference probe to check the cold end and measuring point. Furnace temperature control cannot be used to replace the workpiece temperature.
Functional fabric thermal and moisture resistance test interface package
Test and assembly objects:Guest heating panels and humidity control devices
Development and delivery:Read steady-state power and environmental conditions, and output thermal and moisture resistance calculation records
Project input:Heat source and cooling loop, temperature power reference, specimen installation and steady state definition
Acceptance method:Customer reference cloth to check heat loss compensation, temperature and humidity conditions and steady-state rules can be traced
Active infrared thermal imaging pulse and acquisition linkage
Test and assembly objects:Guest heat source and infrared camera
Development and delivery:Synchronized heating triggers, temperature sequences and part numbering
Project input:Heat source and cooling loop, temperature power reference, specimen installation and steady state definition
Acceptance method:Reference specimen and independent trigger verification, surface emissivity and heating conditions are fixed
Cyclic corrosion chamber working mode switching and sample tool
Test and assembly objects:Customer-supplied corrosion chamber and sample rack
Development and delivery:Document wet and dry salt spray cycles, sample location and interruption recovery
Project input:Heat source and cooling loop, temperature power reference, specimen installation and steady state definition
Acceptance method:Check the original equipment log and working condition timing. The interruption segment is not considered a complete cycle.
Equipment host computer and instrument process integration
Semiconductor equipment host and recipe permissions work package
Test and assembly objects:Existing equipment protocols and recipe tasks
Development and delivery:Configure the device Host interface, recipe version, permissions and status records, and check the operation and exception recovery process.
Project input:Device protocol/SDK, license, operating procedures, target environment and abnormal samples
Acceptance method:Verify specified instrument commands, processes, timeout recovery, and data correspondence; device software does not replace physical measurement and calibration.
Material testing machine instrument interface and report matching
Test and assembly objects:Testing machine, protocol and results templates are available
Development and delivery:Configure material testing machine data interface and report fields to check original measurement values, specimens and versions.
Project input:Device protocol/SDK, license, operating procedures, target environment and abnormal samples
Acceptance method:Verify specified instrument commands, processes, timeout recovery, and data correspondence; device software does not replace physical measurement and calibration.
HALT or integrated stress equipment software interface package
Test and assembly objects:Existing test equipment and approved working conditions
Development and delivery:Only device control, acquisition and event recording are integrated, and the test method is defined by the responsible party
Project input:Device protocol/SDK, license, operating procedures, target environment and abnormal samples
Acceptance method:Verify specified instrument commands, processes, timeout recovery, and data correspondence; device software does not replace physical measurement and calibration.
Ultrasonic welding amplitude energy and collapse amount acquisition package
Test and assembly objects:Customer-supplied ultrasonic welding machines and joint samples
Development and delivery:Read the welding energy, amplitude and collapse amount, and output abnormal section review records
Project input:Device protocol/SDK, license, operating procedures, target environment and abnormal samples
Acceptance method:Instrument readings are checked against independent displacements to verify that unwelded samples are not masked by individual energy items.
Adhesive open time and curing process measurement package
Test and assembly objects:Glue samples, timing and customer-supplied rheology or hardness testers
Development and delivery:Record the mixing starting point, temperature and property changes at specified times
Project input:Device protocol/SDK, license, operating procedures, target environment and abnormal samples
Acceptance method:The results of different test methods are listed separately, and the degree of curing is not directly inferred from the single-point hardness.
Paper burst resistance and water absorption weighing joint inspection record package
Test and assembly objects:Customer-supplied burst resistance meter and water absorption weighing process
Development and delivery:Unify the sample number and store the bursting pressure and water absorption capacity separately.
Project input:Device protocol/SDK, license, operating procedures, target environment and abnormal samples
Acceptance method:Check the instrument reference and weighing timing separately, and do not combine the two items into an unfounded grade.
Mortar fluidity and setting time collection tool
Test and assembly objects:Customer-supplied flow and condensation test equipment
Development and delivery:Record environment, time, images and manual measurements by batch
Project input:Device protocol/SDK, license, operating procedures, target environment and abnormal samples
Acceptance method:Check the timing starting point and ruler, and keep manual and image measurements separately.
OTA darkroom equipment linkage and results archiving package
Test and assembly objects:Customer supplied darkroom, turntable and OTA test system
Development and delivery:Synchronize test plans, sample versions and original system results without self-developed OTA algorithms
Project input:Device protocol/SDK, license, operating procedures, target environment and abnormal samples
Acceptance method:The complete results of the original system correspond to the index of this tool one-to-one, and the failure and interruption status are checked.
Radar module target simulator interface and playback package
Test and assembly objects:Customer-supplied radar modules and licensed target simulators
Development and delivery:Correlate the target scene, configuration version and module output, and do not establish the true value of the real scene
Project input:Device protocol/SDK, license, operating procedures, target environment and abnormal samples
Acceptance method:The target conditions of the original simulator correspond to the device output, and the effective range of the simulation is clearly recorded.
Surge pulse group equipment status linkage recording package
Test and assembly objects:Customer-supplied generator and equipment operation monitoring
Development and delivery:Correlate interference steps and state changes to save recovery trajectories
Project input:Device protocol/SDK, license, operating procedures, target environment and abnormal samples
Acceptance method:Original generator log verification steps, instrument interface is not used as test level evidence
Industrial endoscope workpiece point location and image tracing
Test and assembly objects:Customer endoscopy and workpiece inspection routes
Development and delivery:Save the original video, screenshots and manual notes by point
Project input:Device protocol/SDK, license, operating procedures, target environment and abnormal samples
Acceptance method:Missed inspection points on the route are visible, and the original map time and workpiece identity are verified.
Paint viscosity flow cup and temperature recording terminal
Test and assembly objects:Customer flow cup, timing and temperature chain
Development and delivery:Save flow time, cup size and temperature, calculated according to approved formula
Project input:Device protocol/SDK, license, operating procedures, target environment and abnormal samples
Acceptance method:Standard liquid check timing and formula, temperature out-of-range results are clearly marked
Density-viscosity refractometer multi-instrument joint work package
Test and assembly objects:Customer supplied density viscosity refractometer
Development and delivery:Bind the same sample and temperature, and save the results of each instrument separately.
Project input:Device protocol/SDK, license, operating procedures, target environment and abnormal samples
Acceptance method:Standard liquids are checked instrument by instrument. If the temperature is inconsistent, direct horizontal comparison is not allowed.
Thermal analysis DSC and TGA file comparison tool
Test and assembly objects:License DSC or TGAoriginal file
Development and delivery:Bind temperature range atmosphere and sample quality, save events for manual review
Project input:Device protocol/SDK, license, operating procedures, target environment and abnormal samples
Acceptance method:Check the reference sample and the original software results, and do not mix the peak conclusions of different heating rates.
Instrument driver plug-in and version compatibility package
Test and assembly objects:Customer supplied instrumentSDK and main program interface
Development and delivery:Package driver adaptation, error status and compatibility matrix
Project input:Device protocol/SDK, license, operating procedures, target environment and abnormal samples
Acceptance method:Actual measurement of different firmware and interface versions, driver missing and equipment failure reported separately
Geometry, motion errors and reference calibration
Package fixture posture and visual alignment tools
Test and assembly objects:Existing sports platform, camera and target
Development and delivery:Related coordinate calibration, alignment compensation and repeated positioning records, no guarantee of the complete machine process capability
Project input:Position angle reference, coordinate definition, installation posture and repeated measurement conditions
Acceptance method:Check the actual position angle reference, coordinates, installation, and repeat the test in forward and reverse directions. A normal interface does not mean that the geometric accuracy is passed.
Spindle thermal elongation and speed temperature rise test work package
Test and assembly objects:Spindle and axial displacement reference
Development and delivery:Synchronized speed, temperature and end displacement, output heating and cooling drift curves
Project input:Position angle reference, coordinate definition, installation posture and repeated measurement conditions
Acceptance method:Independent displacement reference checks cold zero point and bracket thermal drift, fixed operating rhythm
Electric lift table synchronization and eccentric load test package
Test and assembly objects:Customer service lift table and position load reference
Development and delivery:Record the height difference, current and eccentric load conditions on both sides
Project input:Position angle reference, coordinate definition, installation posture and repeated measurement conditions
Acceptance method:Independent displacement measurement checks the errors on both sides, and the shutdown and recovery positions are consistent.
Light source, spectrum and photoelectric instrument measurement and control
Optical module temperature cycle and bit error meter linkage program
Test and assembly objects:Modules, thermostats, error detectors and designated links
Development and delivery:Correlate temperature, link status and raw error count, and output working condition comparison
Project input:Light source/detection/spectral reference, optical path/chart, motion mechanism and environmental conditions
Acceptance method:Check the optical path, light source/power/wavelength reference and algorithm input, record the sample attitude, environment and independent re-measurement.
Optical switch channel matrix and insertion loss test package
Test and assembly objects:Optical switches, light sources and power meters
Development and delivery:Configure port matrix and associate reference power, insertion loss and repeated measurements
Project input:Light source/detection/spectral reference, optical path/chart, motion mechanism and environmental conditions
Acceptance method:Check the optical path, light source/power/wavelength reference and algorithm input, record the sample attitude, environment and independent re-measurement.
LED spectrum and dimming waveform joint measurement and control tool
Test and assembly objects:LED driver, spectrometer and oscilloscope
Development and delivery:Synchronize electrical dimming conditions and spectral results, retain reference and sampling settings
Project input:Light source/detection/spectral reference, optical path/chart, motion mechanism and environmental conditions
Acceptance method:Check the optical path, light source/power/wavelength reference and algorithm input, record the sample attitude, environment and independent re-measurement.
Chromatic Gloss and Haze Instrument Joint Work Package
Test and assembly objects:Customer supplied color difference, gloss and haze meter
Development and delivery:Bind the light source angle, specimen direction and measurement points, and output the appearance measurement table
Project input:Light source/detection/spectral reference, optical path/chart, motion mechanism and environmental conditions
Acceptance method:Standard board check configuration to distinguish instrument readings from manual appearance judgment
Laser welding molten pool signal and workpiece coordinate binding tool
Test and assembly objects:Customer supplied photoelectric detection and welding controller
Development and delivery:Bind the intensity waveform to the coordinate segment, and output traceability and abnormal candidate segments.
Project input:Light source/detection/spectral reference, optical path/chart, motion mechanism and environmental conditions
Acceptance method:The synchronization error is rechecked with the trigger, and the defect judgment must be compared with the cross-sectional results.
Additive melt pool monitoring and scan trajectory alignment tools
Test and assembly objects:Customer-provided monitoring signals and scanning traces
Development and delivery:Correlate location, layer number and signal strength to locate abnormal candidate segments
Project input:Light source/detection/spectral reference, optical path/chart, motion mechanism and environmental conditions
Acceptance method:Trigger baseline verification location mapping, actual defects must still be independently detected
Light dose and platform gap test for light curing printing
Test and assembly objects:Customer supplied radiometer, platform and printed samples
Development and delivery:Record the light dose distribution in the field of view and the platform gap, and correlate the process version
Project input:Light source/detection/spectral reference, optical path/chart, motion mechanism and environmental conditions
Acceptance method:Reference radiometer and gap benchmark verification, do not use software grayscale directly as dose
Coating spectral transmission, reflection and film thickness comparison package
Test and assembly objects:Customer supplied spectrometer and independent film thickness results
Development and delivery:Bind measuring points, incident angles and transmission and reflection spectra to compare film thickness conditions
Project input:Light source/detection/spectral reference, optical path/chart, motion mechanism and environmental conditions
Acceptance method:Standard optics and independent film thickness comparison, model inversion results indicate assumptions
Inertia, time synchronization and multi-modal acquisition
UAV attachment vibration and image inertia correlation tool
Test and assembly objects:Vibration table, camera and IMU provided by customer
Development and delivery:Synchronize vibration references, poses and image frames to preserve structural configuration and data quality
Project input:Time sources, sample/trigger definitions, target interfaces and independent references
Acceptance method:Distinguish sampling, receiving and writing time, measure deviation/jitter/sample loss; hard trigger capability and software alignment are recorded separately.
Unified time base tool for temperature chamber vibration and acquisition system
Test and assembly objects:Existing environmental equipment, triggering and data collection
Development and delivery:Unify task time stamps and save equipment status, specimen and multi-physical raw data
Project input:Time sources, sample/trigger definitions, target interfaces and independent references
Acceptance method:Distinguish sampling, receiving and writing time, measure deviation/jitter/sample loss; hard trigger capability and software alignment are recorded separately.
Tool cutting force and vibration synchronous acquisition module
Test and assembly objects:Customer-supplied force testers and cutting test pieces
Development and delivery:Map cutting force, spindle angle and vibration to process segments and output original waveforms
Project input:Time sources, sample/trigger definitions, target interfaces and independent references
Acceptance method:Check idling and cutting baselines separately, check trigger delay and channel dimensions
Packaging drop impact waveform and attitude recording package
Test and assembly objects:Customer supplied drop device and impact sensing chain
Development and delivery:Bind drop height, attitude and impact waveform, and save data before and after triggering
Project input:Time sources, sample/trigger definitions, target interfaces and independent references
Acceptance method:Reference impact and sampling chain verification, drop attitude and buffer curve are recorded separately
Transport vibration table and packaging compression linkage record package
Test and assembly objects:Customer supplied vibrating table and upper ballast
Development and delivery:Correlate ballast, vibration spectrum and packaging status events
Project input:Time sources, sample/trigger definitions, target interfaces and independent references
Acceptance method:The original control spectrum is compared with the actual measured response, and the effective period of ballast can be traced
Electrostatic discharge test events and equipment response records
Test and assembly objects:Customer-supplied ESD generator and device under test logs
Development and delivery:Record test points, times, polarity and fault recovery evidence
Project input:Time sources, sample/trigger definitions, target interfaces and independent references
Acceptance method:Manual test records are checked against equipment events, and missing test points are explicitly marked
Bearing vibration order tracking and speed synchronization module
Test and assembly objects:Vibration waveform and independent speed reference
Development and delivery:Output speed-related order diagram and original segment index
Project input:Time sources, sample/trigger definitions, target interfaces and independent references
Acceptance method:Reference speed and known excitation review, missing speed segments must not automatically fill in the true value
Blade strain load and fiber optic demodulator interface
Test and assembly objects:Customer supply transformer or fiber optic demodulator
Development and delivery:Read multi-point strain and load, record zero point, temperature compensation and synchronization basis
Project input:Time sources, sample/trigger definitions, target interfaces and independent references
Acceptance method:Reference loading and temperature channel re-inspection, the temperature compensation model is provided by the test party
Washing Machine Load Vibration and Eccentricity Tool
Test and assembly objects:Customer-supplied washing machine and vibration speed chain
Development and delivery:Related load eccentricity, rotational speed process and box vibration
Project input:Time sources, sample/trigger definitions, target interfaces and independent references
Acceptance method:Independent rotation speed and load condition check, empty machine and loading results are separated
Torque—Angle, Speed, and Rotational Loading
Underwater propeller thrust power consumption water tank test tool
Test and assembly objects:Thruster, existing tank and thrust power reference
Development and delivery:Control operating conditions and synchronize thrust, current, voltage, speed, and output efficiency calculation caliber
Project input:Mechanical loading/motion device, torque speed or angle reference, test piece and protection status
Acceptance method:Check the torque/angle/speed reference and time base, verify the forward and reverse directions and different working conditions; set the ranges of mechanical loading, hysteresis and life respectively.
Centrifugal equipment speed and vibration recording tool
Test and assembly objects:Existing centrifugal equipment and speed vibration reference
Development and delivery:Synchronized speed vibration temperature, linked to sample load and process configuration
Project input:Mechanical loading/motion device, torque speed or angle reference, test piece and protection status
Acceptance method:Check the torque/angle/speed reference and time base, verify the forward and reverse directions and different working conditions; set the ranges of mechanical loading, hysteresis and life respectively.
Lead screw friction torque and backlash test package
Test and assembly objects:Screw pair, loading and angle reference
Development and delivery:Record the torque, forward and reverse stroke and backlash under preload conditions
Project input:Mechanical loading/motion device, torque speed or angle reference, test piece and protection status
Acceptance method:Compare different preloads and speeds, double reference verification of angular displacement and linear displacement
Shaft seal rotation life and leakage trend recording package
Test and assembly objects:Shaft seal test piece and customer-supplied rotary table
Development and delivery:Record the speed eccentricity temperature and cumulative leakage to locate the first failure section
Project input:Mechanical loading/motion device, torque speed or angle reference, test piece and protection status
Acceptance method:Cycle counting and weighing verification, downtime does not include effective running time
Gearbox mechanical efficiency and churning loss test package
Test and assembly objects:Gearbox and input and output torque reference
Development and delivery:Compare the transmission power and no-load oil stirring conditions, and save the warm and viscous conditions
Project input:Mechanical loading/motion device, torque speed or angle reference, test piece and protection status
Acceptance method:Both ends of the torque and speed are checked at the same time, and the total loss of the motor is not included in the gearbox.
Belt friction transmission slip and tension test package
Test and assembly objects:Belt drive table and speed reference at both ends
Development and delivery:Record tension, speed and load at both ends, and output slip changes
Project input:Mechanical loading/motion device, torque speed or angle reference, test piece and protection status
Acceptance method:Check wheel diameter and speed measurement benchmark to distinguish elastic creep and macro-slip
Bottle cap unscrewing torque and anti-theft ring breaking tooling
Test and assembly objects:Caps, Bottles and Torque Angle Devices
Development and delivery:Output initial opening, ring break and re-sealing torque curves
Project input:Mechanical loading/motion device, torque speed or angle reference, test piece and protection status
Acceptance method:Check and record the unscrewing speed and clamping deformation with reference torque
Door lock tongue force and opening and closing life test package
Test and assembly objects:Door locks and guest opening and closing mechanisms
Development and delivery:Synchronized operating torque, deadbolt position and cycle to locate stuck sections
Project input:Mechanical loading/motion device, torque speed or angle reference, test piece and protection status
Acceptance method:Retest the reference lock and reference torque to verify the continuity of the power outage and restart cycle
Door hinge door closer torque angle test kit
Test and assembly objects:Door hinges or door closers and rotating devices
Development and delivery:Output opening and closing angle torque, door closing time and return difference
Project input:Mechanical loading/motion device, torque speed or angle reference, test piece and protection status
Acceptance method:Reference angle and torque verification, gravity and installation attitude clearly recorded
Wind power pitch actuator load and tracking test package
Test and assembly objects:Customer supplied pitch actuator and loading device
Development and delivery:Record commands, angles, loads and emergency response
Project input:Mechanical loading/motion device, torque speed or angle reference, test piece and protection status
Acceptance method:The reference angle load is checked against the original controller records, and the working condition boundary is given by the equipment side.
Driveline Torque Ripple and Torsional Vibration Data Tool
Test and assembly objects:Customer-supplied torque angle sensing and operation records
Development and delivery:Extract torque fluctuation and torsional vibration frequency band under specified working conditions
Project input:Mechanical loading/motion device, torque speed or angle reference, test piece and protection status
Acceptance method:Independent torque reference and sampling time base check, filtering and order settings can be recalculated
Recording of start-stop sliding and friction loss of rotating equipment
Test and assembly objects:Speed, power and passenger load status
Development and delivery:Correlate launch and glide curves to calculate loss terms based on approved models
Project input:Mechanical loading/motion device, torque speed or angle reference, test piece and protection status
Acceptance method:Check the speed reference and load status, and separate the inertia assumption from the actual measured value.
Brake caliper pressure displacement and drag test package
Test and assembly objects:Customer-supplied brake pads and calipers
Development and delivery:Correlate hydraulic pressure, piston displacement and drag torque, and output working condition records
Project input:Mechanical loading/motion device, torque speed or angle reference, test piece and protection status
Acceptance method:Reference pressure and torque review, not responsible for vehicle braking performance or road judgment.
Electric Steering Actuator Bench Tracking Record Package
Test and assembly objects:Customer supplied steering rack and controller
Development and delivery:Record angle command, torque, alignment and controller status
Project input:Mechanical loading/motion device, torque speed or angle reference, test piece and protection status
Acceptance method:Angle and torque are independently verified with reference, and fault conditions are approved by the platform party
Wiper mechanism swing angle wiping force and current test package
Test and assembly objects:Wiper mechanism and customer-supplied simulated glass
Development and delivery:Synchronized swivel angle, current, contact force and operating cycle
Project input:Mechanical loading/motion device, torque speed or angle reference, test piece and protection status
Acceptance method:Reference angle and load re-inspection, wet conditions and glass curvature are clear
Cockpit knob tactile torque and rebound test package
Test and assembly objects:Cockpit knob and torque angle meter
Development and delivery:Joint test results of output gear peak and valley, return stroke and pressing electric trigger
Project input:Mechanical loading/motion device, torque speed or angle reference, test piece and protection status
Acceptance method:Reference torque and angle check, subjective feel evaluation recorded separately
Conveyor roller running resistance and noise test package
Test and assembly objects:Drum and passenger rotation loading device
Development and delivery:Record load, starting resistance, operating noise and speed
Project input:Mechanical loading/motion device, torque speed or angle reference, test piece and protection status
Acceptance method:Check reference torque and acoustic conditions, and separate bearing and bench noise
AGV traction and wheel-terrain slip test package
Test and assembly objects:Customer supplied AGV bench and force speed reference
Development and delivery:Records traction, wheel speed and ground speed differential by load
Project input:Mechanical loading/motion device, torque speed or angle reference, test piece and protection status
Acceptance method:Force and two speed reference checks, ground material and load clear
Caster rolling resistance and rotation back-alignment test kit
Test and assembly objects:Casters and loading traveling mechanism
Development and delivery:Record starting resistance, rolling resistance and steering torque
Project input:Mechanical loading/motion device, torque speed or angle reference, test piece and protection status
Acceptance method:Independent force and torque check, ground joints and eccentric load conditions are fixed
Controller, firmware, state machine and HMI
Underwater equipment leakage and fault diagnosis work package
Test and assembly objects:Select probe, ROV bus and interface board
Development and delivery:Configure underwater equipment leakage input and fault samples, check the ROV interface, alarm and recovery records.
Project input:Existing interfaces, electrical power supply, control objects, status tables and software and hardware information
Acceptance method:Fixed interface and status table, verification of input and output, loss of connection/restart and recovery, control logic and safety functions are defined separately.
Industrial heater zone control and temperature difference tools
Test and assembly objects:Zoned heating units and temperature references
Development and delivery:Supplement state machine, steady state, channel difference and abnormal records according to actual partitions
Project input:Existing interfaces, electrical power supply, control objects, status tables and software and hardware information
Acceptance method:Fixed interface and status table, verification of input and output, loss of connection/restart and recovery, control logic and safety functions are defined separately.
Tool magazine tool changing action sequence and fault recurrence package
Test and assembly objects:Tool magazine, robot and position input
Development and delivery:Collect action chain timing to reproduce absence, clamping failure and recovery path
Project input:Existing interfaces, electrical power supply, control objects, status tables and software and hardware information
Acceptance method:Check the customer supply status chart item by item, and test the position consistency after interruption and manual recovery
Sputtering power supply and deposition recipe linkage work package
Test and assembly objects:Customer supplied sputtering equipment and power interface
Development and delivery:Record power, air pressure and step status according to approved formula
Project input:Existing interfaces, electrical power supply, control objects, status tables and software and hardware information
Acceptance method:Compare the original controller and power supply readings, and do not take over undefined process protection
ALDCycling valve action and dose recording module
Test and assembly objects:Customer-supplied atomic layer deposition equipment interface
Development and delivery:Synchronize cycle number, valve pulse and pressure response, save deviation events
Project input:Existing interfaces, electrical power supply, control objects, status tables and software and hardware information
Acceptance method:Original equipment log and independent pressure response check, valve command cannot be regarded as actual flow rate
Laboratory Samples, Flow Paths and Process Control
Marine sensor antifouling cleaning control module
Test and assembly objects:Existing water quality probe, cleaning mechanism and control port
Development and delivery:Arrange cleaning and soaking measurement steps, and save readings and consumable records before and after cleaning
Project input:Sample/test solution, ready-made flow path mechanism, parameters/formula and cleaning failure status
Acceptance method:Fixed samples and recipes to verify complete steps, cleaning/sampling, and failure rollback; save process parameters and sample identity.
Chromatograph sample queue and raw file index
Test and assembly objects:Authorized chromatography software interface and sample table
Development and delivery:Synchronize queue, sample identity and original file path, do not replace peak integration by itself
Project input:Sample/test solution, ready-made flow path mechanism, parameters/formula and cleaning failure status
Acceptance method:The original software sample sequence is checked item by item, and re-injections and blanks cannot be tied incorrectly.
TOCAnalyzer sampling cleaning and blanking tools
Test and assembly objects:Customer supply of TOC instrument and sampling mechanism
Development and delivery:Linked sample switching, blanking and cleaning, saving the original concentration and status
Project input:Sample/test solution, ready-made flow path mechanism, parameters/formula and cleaning failure status
Acceptance method:Standard solutions are checked against blanks, and residual effects are verified by alternating concentration samples.
Leak detection instrument, valve group and test piece linkage
Fluid Equipment Manifold Leak Backflow Test Kit
Test and assembly objects:Valve bank, reference flow and pressure conditions
Development and delivery:Configure valve position, return flow and pressure holding use cases according to the existing leak detection fluid platform
Project input:Leak detection methods, reference leak holes/samples, ready-made leak detectors, air sources and valve groups
Acceptance method:Check ready-made instruments, reference leaks/samples, gas circuit background and action status; a single specification of an instrument does not serve as the leak detection capability of the entire site.
Differential Pressure Leak Detection Temperature Compensation Evaluation Work Package
Test and assembly objects:Test piece, reference chamber and customer-supplied leak detector
Development and delivery:Establish a comparison between the empty fixture and the reference leak hole to evaluate the impact of temperature drift and volume on the judgment.
Project input:Leak detection methods, reference leak holes/samples, ready-made leak detectors, air sources and valve groups
Acceptance method:Use known leak rates and non-leak samples for blind testing, and save misjudgment records before and after compensation.
Chamber Leak Detector and Component Identification Work Pack
Test and assembly objects:Customer supplied leak detectors, valve manifolds and vacuum components
Development and delivery:Configure cavity segment leak detection, valve group and component identity association, and keep standard leak holes and background comparison records.
Project input:Leak detection methods, reference leak holes/samples, ready-made leak detectors, air sources and valve groups
Acceptance method:Standard leak and cavity baseline review, helium background affects single column
Test data, provenance, traceability and quality tools
Laboratory sample barcoding and instrument worklist tools
Test and assembly objects:Sample barcodes, instrument interfaces and established processes
Development and delivery:Combined interface and traceability, checking sample list, result return and manual review
Project input:Real authorization data, units/fields, manual baselines, models/formulas, and permissions
Acceptance method:Use real independent data to check fields/units, formulas/versions, source permissions and failure handling with manual benchmarks; draft reports require human review.
Calibration coefficient publishing and device binding tools
Test and assembly objects:Calibration data, coefficients, device identity and permissions
Development and delivery:Check issuance, write readback, version rollback and evidence correspondence, and do not sign calibration certificates on behalf of others
Project input:Real authorization data, units/fields, manual baselines, models/formulas, and permissions
Acceptance method:Use real independent data to check fields/units, formulas/versions, source permissions and failure handling with manual benchmarks; draft reports require human review.
Report draft and work order manual confirmation work package
Test and assembly objects:Structured test results, templates and operation permissions
Development and delivery:Convert structured test results into draft reports and work orders, and enter the agreed business process after confirmation by authorized personnel.
Project input:Real authorization data, units/fields, manual baselines, models/formulas, and permissions
Acceptance method:Use real independent data to check fields/units, formulas/versions, source permissions and failure handling with manual benchmarks; draft reports require human review.
Thread gauge and multi-parameter measurement and recording terminal
Test and assembly objects:Threaded workpieces, customer-supplied gauges and digital measuring tools
Development and delivery:Record the pass-stop, tooth type and manual retest results according to the workpiece
Project input:Real authorization data, units/fields, manual baselines, models/formulas, and permissions
Acceptance method:The sources of different measuring tools are separated from manual judgment, and the verification workpiece is incorrectly bound and intercepted.
Lubrication wear map and expert review package
Test and assembly objects:Historical wear debris images and licensing tags
Development and delivery:Provides related search and manual review of the same batch, and does not automatically determine the remaining life of the equipment.
Project input:Real authorization data, units/fields, manual baselines, models/formulas, and permissions
Acceptance method:Independent batch review of search results and sources, keeping unlabeled samples unknown
Metal powder recycling batch and sample control package
Test and assembly objects:Recycled powder batches, screening and test results
Development and delivery:Trace the proportion of mixed batches and the source of testing to form a record that can be reviewed and reused
Project input:Real authorization data, units/fields, manual baselines, models/formulas, and permissions
Acceptance method:Mass balance and batch chain verification, reuse determination is confirmed by the material process party
Comparison of multi-method data on density and porosity of printed parts
Test and assembly objects:Weighing density and CT or metallographic results provided by customers
Development and delivery:Save the sampling positions and results of each method separately, without forcibly merging the true values
Project input:Real authorization data, units/fields, manual baselines, models/formulas, and permissions
Acceptance method:Standard sample and independent cross-section review, volume porosity and cross-sectional area ratio are separated
Environmental, gas and chemical quantity calibration
Power consumption and dissolved oxygen linkage tool for breeding aeration equipment
Test and assembly objects:Existing aeration equipment, dissolved oxygen reference and water conditions
Development and delivery:Arrange working conditions and correlate power, dissolved oxygen, temperature and water configuration
Project input:Standard medium or standard solution, reference instrument, temperature and humidity and operating flow path
Acceptance method:Check the standard gas/liquid and reference value, operating flow path, temperature and humidity conditions, record response recovery, cross-influence and independent retest.
Hydrogen energy bench humidification and dew point instrument interface
Test and assembly objects:Customer-supplied humidification device and dew point meter
Development and delivery:Document actual dew point, temperature and flow setting values per approved process
Project input:Standard medium or standard solution, reference instrument, temperature and humidity and operating flow path
Acceptance method:Refer to the dew point meter review and stabilization time record. Relative humidity cannot be used to directly replace dew point.
Hydrogen detector cross-response test record package
Test and assembly objects:Customer-supplied detectors and approved gas distribution devices
Development and delivery:Record the response recovery under concentration, interfering gas and temperature and humidity conditions
Project input:Standard medium or standard solution, reference instrument, temperature and humidity and operating flow path
Acceptance method:Check the standard gas and reference instrument. Do not prepare your own unconfirmed gas source or promise to alarm compliance.
Salt spray chamber multi-point environment and spray collection tools
Test and assembly objects:Customer supplied salt spray chamber and reference temperature collector
Development and delivery:Correlate temperature, sedimentation, rehydration and door opening events
Project input:Standard medium or standard solution, reference instrument, temperature and humidity and operating flow path
Acceptance method:Check the reference temperature and collection volume, do not use the temperature in the box to replace all effective conditions
Industrial cleaning tank concentration and rinse conductivity recording package
Test and assembly objects:Customer-supplied cleaning tank and concentration conductivity meter
Development and delivery:Correlate concentration, temperature and rinse conductivity by workpiece batch
Project input:Standard medium or standard solution, reference instrument, temperature and humidity and operating flow path
Acceptance method:Check and record the temperature compensation of the standard solution. The conductivity is not automatically equal to all residues.
Visual inspection, manual review and equipment linkage
Agricultural products grading, weighing and work station linkage package
Test and assembly objects:Represents sample, camera, scale and rejection interfaces
Development and delivery:Configure agricultural product grading rules, visual and weighing data, as well as workstation actions and traceability interfaces.
Project input:Fixed imaging/triggering, normal abnormal samples, annotation and workstation interfaces
Acceptance method:Check test results with independent samples and manual review to verify triggering, data identity, anomalies and complete beats at the target station.
Photovoltaic electroluminescence imaging and defect review tools
Test and assembly objects:Components, existing imaging equipment and power supplies
Development and delivery:Correlate images, stimuli and samples to support manual annotation and result tracing
Project input:Fixed imaging/triggering, normal abnormal samples, annotation and workstation interfaces
Acceptance method:Check test results with independent samples and manual review to verify triggering, data identity, anomalies and complete beats at the target station.
Tool Wear Image and Dimensional Review Tool
Test and assembly objects:Tool microscopic images and wear artificial benchmarks
Development and delivery:Mark wear bands, nicks, and labor time associations to create a reviewable image record
Project input:Fixed imaging/triggering, normal abnormal samples, annotation and workstation interfaces
Acceptance method:Set aside independent tool batch comparisons for manual annotation, and do not directly equate image area with lifespan.
Vision measurement lens distortion and ruler calibration package
Test and assembly objects:Fixed lenses, standard scales and prototypes
Development and delivery:Output pixel scale, field of view position error and reinstallation re-inspection record
Project input:Fixed imaging/triggering, normal abnormal samples, annotation and workstation interfaces
Acceptance method:Independent ruler multi-position retest, cannot only use the calibration plate participating in the fitting
Weld cross-section image measurement and serial number traceability
Test and assembly objects:Microscopic cross-section image and solder joint identity
Development and delivery:Output welding depth, fusion width and other manually confirmed dimensions and map them to the original image
Project input:Fixed imaging/triggering, normal abnormal samples, annotation and workstation interfaces
Acceptance method:Independent ruler re-inspection and manual annotation comparison, image processing results must not cover the original image
Fabric wear-resistant pilling image review tool
Test and assembly objects:Customer-supplied wear-resistant testing machine and grade reference chart
Development and delivery:Binding loop times, shooting conditions and manual level review
Project input:Fixed imaging/triggering, normal abnormal samples, annotation and workstation interfaces
Acceptance method:Independent fabric batches are compared with manual grading, and grade conflicts are handled manually.
Leather image recording bag resistant to folding and surface cracks
Test and assembly objects:Customer-supplied folding machines and fixed imaging
Development and delivery:Save bending area images and artificial crack marks by number of times
Project input:Fixed imaging/triggering, normal abnormal samples, annotation and workstation interfaces
Acceptance method:Re-inspection with fixed lighting and bending state, image detection must be compared with manual inspection
Printing Registration Deviation and Stroboscopic Image Measurement Package
Test and assembly objects:Printed markers, encoders and fixed cameras
Development and delivery:Record the relative position and registration deviation of the color mark according to the speed
Project input:Fixed imaging/triggering, normal abnormal samples, annotation and workstation interfaces
Acceptance method:Standard mark rechecks pixel scale and trigger position to distinguish the impact of paper expansion and contraction
Powder bed uniformity image and layer number tool
Test and assembly objects:Customer-provided imaging and layer number triggering
Development and delivery:Output the powder coating defect candidate area, layer number and original image traceability
Project input:Fixed imaging/triggering, normal abnormal samples, annotation and workstation interfaces
Acceptance method:Independent powder layer sample and manual annotation review, the image texture is not equal to the true value of the thickness
Magnetic particle penetrant inspection image and process record package
Test and assembly objects:Customer-supplied inspection process and fixed imaging
Development and delivery:Binding cleaning, application, observation and review records
Project input:Fixed imaging/triggering, normal abnormal samples, annotation and workstation interfaces
Acceptance method:Known display test pieces are compared with manual inspection, lighting conditions and process time records
Logistics sorting trigger and drop point verification tool
Test and assembly objects:Sorters, encoders and customer-supplied imaging
Development and delivery:Correlate object ID, trigger position and actual impact area
Project input:Fixed imaging/triggering, normal abnormal samples, annotation and workstation interfaces
Acceptance method:Independent object batch review, missed or incorrect classification, time deviation and visual error are separated
Cleaning Robot Stains Before and After Image Review Pack
Test and assembly objects:Specify stain samples and fixed imaging
Development and delivery:Correlate the running route with images before and after cleaning, and output manual review records
Project input:Fixed imaging/triggering, normal abnormal samples, annotation and workstation interfaces
Acceptance method:Independent stain batch review with manual benchmarks, fixed illumination and residue measurement apertures
Rust area image and manual grade review package
Test and assembly objects:Fixed imaging and corrosion specimens
Development and delivery:Output area mark, area ratio and manual grade, without automatically predicting life span
Project input:Fixed imaging/triggering, normal abnormal samples, annotation and workstation interfaces
Acceptance method:Comparison of independent samples with manual annotation, edge and hole processing rules are fixed
Particle cleanliness diaphragm image and classification review
Test and assembly objects:Diaphragm images and authorized particle classification rules
Development and delivery:Provide particle candidate marking, size and manual review records
Project input:Fixed imaging/triggering, normal abnormal samples, annotation and workstation interfaces
Acceptance method:Independent diaphragms are compared with manual counting, and overlapping and edge particles are left for manual processing.
Sample and multi-station automatic scheduling
Laboratory instrument reservation and test queue tools
Test and assembly objects:Instrument assets, user permissions, and test tasks
Development and delivery:Combine business systems and instrument interfaces to check occupancy, suspension, priority and traceability
Project input:Existing institutions and instruments, sample identities, queues/interlocks, and failure fallback rules
Acceptance method:Verify queue, location/sample identity, interlocks, and instrument status, verify pauses, failures, resumes correspond to results.
Dimensional, morphological and surface instrument data
Machine tool ballbar and laser measurement data comparison tool
Test and assembly objects:Customer supplied ballbar and laser measurement results
Development and delivery:Align machine axes, orientation and compensation versions to generate geometric error comparison reports
Project input:Customer reference instruments/measuring instruments, geometric datums, clamping and error budgets
Acceptance method:Recalculate the original results according to the same coordinates and stroke, and check the comparability before and after compensation.
Flatness and warpage non-contact measurement work package
Test and assembly objects:Displacement instrument, motion table and plates provided by customer
Development and delivery:Establish reference plane and scanning grid, output flatness and missing measurement points
Project input:Customer reference instruments/measuring instruments, geometric datums, clamping and error budgets
Acceptance method:Review the support deformation of standard plane and inverted parts, and save the defect processing rules
Thickness gauge multi-layer material parameter switching work package
Test and assembly objects:Customer-supplied thickness gauges and samples of different layer structures
Development and delivery:Manage material parameters, matrix and measuring points, save original readings and review them
Project input:Customer reference instruments/measuring instruments, geometric datums, clamping and error budgets
Acceptance method:Standard films and actual samples are verified separately, without the need for single-layer parameters to push multi-layer true values.
Metal hardness tester multi-point automatic reading and indentation review
Test and assembly objects:Hardness tester and standard block provided by customer
Development and delivery:Associated load holding, indentation readings, point positions and manual review
Project input:Customer reference instruments/measuring instruments, geometric datums, clamping and error budgets
Acceptance method:Check before and after the standard block, and save manual corrections and original readings
Comparison package of plate rebound angle and mold working conditions
Test and assembly objects:Bending sample parts and customer-supplied angle measuring instruments
Development and delivery:Correlate the angle before and after unloading, plate direction and bending conditions
Project input:Customer reference instruments/measuring instruments, geometric datums, clamping and error budgets
Acceptance method:Multiple pieces of the same batch and reverse measurement review to distinguish clamping angle and free rebound
Industrial CT batch file and slice review tools
Test and assembly objects:Authorize CT reconstruction volumes and metadata
Development and delivery:Manage part coordinates, slicing, manual measurements and defect candidate review
Project input:Customer reference instruments/measuring instruments, geometric datums, clamping and error budgets
Acceptance method:Compare the known sample and the original software results, the threshold affects a single column, and no ray source is constructed.
Friction, wear and dynamic loading of materials
Reciprocating friction test waveform and stroke control package
Test and assembly objects:Customer-supplied reciprocating test bench and friction pair
Development and delivery:Linkage frequency stroke load, save the positive and negative friction curves periodically
Project input:Customer-supplied testing machines, normal/tangential force or torque references, specimens and environmental conditions
Acceptance method:Check the commutation section, phase and peak value. The wear amount needs to be measured independently.
Four-ball lubrication tester data acquisition module
Test and assembly objects:Customer-supplied four-ball and specified test procedures
Development and delivery:Read the speed load temperature and correlate the wear spot image and sample batch
Project input:Customer-supplied testing machines, normal/tangential force or torque references, specimens and environmental conditions
Acceptance method:Check the instrument records and artificial wear spot size, and do not automatically deduce the unmeasured anti-wear grade
Seal Friction and Leakage Coupling Test Package
Test and assembly objects:Sealing pair and customer-supplied moving fluid bench
Development and delivery:Synchronized friction, temperature, speed and collected leakage
Project input:Customer-supplied testing machines, normal/tangential force or torque references, specimens and environmental conditions
Acceptance method:Use the empty mechanism and the reference leakage separation fixture to review the start-up and steady-state sections.
Metal fatigue machine load and crack event interface package
Test and assembly objects:Customer-supplied fatigue machines and crack monitors
Development and delivery:Records loads and crack events in cycles and does not replace the original machine load closed loop.
Project input:Customer-supplied testing machines, normal/tangential force or torque references, specimens and environmental conditions
Acceptance method:Check the reference cycle count and overload section, and the crack threshold is fixed according to the test plan
Foam indentation hardness and rebound test package
Test and assembly objects:Foam sample and loading mechanism
Development and delivery:Linked preloading and load holding, recording indentation force, hysteresis and recovery process
Project input:Customer-supplied testing machines, normal/tangential force or torque references, specimens and environmental conditions
Acceptance method:Check the pressure head area and pretreatment, and compare the repeatability after fixing the waiting time.
Plastic tensile extensometer and testing machine synchronization module
Test and assembly objects:Custom tensile machines and contact or optical extensometers
Development and delivery:Correlate force, gauge length and beam displacement, record data before and after fracture
Project input:Customer-supplied testing machines, normal/tangential force or torque references, specimens and environmental conditions
Acceptance method:Reference displacement check synchronization, beam displacement cannot replace gauge length strain
Rope torsion and cyclic tension test interface
Test and assembly objects:Passenger pull and twist devices and ropes
Development and delivery:Record pre-tension, torsion angle and cyclic elongation, and perform manual inspection related to broken wires
Project input:Customer-supplied testing machines, normal/tangential force or torque references, specimens and environmental conditions
Acceptance method:Force angle reference and gauge length re-inspection, chuck slippage shall not be regarded as rope extension
Shock absorber force speed and temperature rise test data package
Test and assembly objects:Customer supplied shock absorber stand and force displacement chain
Development and delivery:Output force, speed loop and temperature rise according to frequency and stroke
Project input:Customer-supplied testing machines, normal/tangential force or torque references, specimens and environmental conditions
Acceptance method:Reference displacement speed and force check, phase compensation and empty table friction record
Coupler buffer load displacement data interface package
Test and assembly objects:Customer-supplied mechanical testing machines and buffer parts
Development and delivery:Read the compression recovery curve and energy integral, and bind the test conditions
Project input:Customer-supplied testing machines, normal/tangential force or torque references, specimens and environmental conditions
Acceptance method:Force displacement reference and integral recalculation, the entire series performance is not deduced from the component curve.
Conveyor belt joint tensile and fatigue recording package
Test and assembly objects:Customer-supplied testing machine and sample parts with joints
Development and delivery:Associating joint patterns, tension cycles, and failure locations
Project input:Customer-supplied testing machines, normal/tangential force or torque references, specimens and environmental conditions
Acceptance method:Gauge length and clamping slip inspection, joint and base material damage are recorded separately
Coating wear resistance and wear quality record package
Test and assembly objects:Wear resistance meter and balance provided by customer
Development and delivery:Binding grinding wheels, loads, cycles and mass loss
Project input:Customer-supplied testing machines, normal/tangential force or torque references, specimens and environmental conditions
Acceptance method:Weighing and cycle checking, pre-treatment and grinding wheel status traceability
Audio Acoustic Testing and Reference Links
Building sound insulation and sound absorption measurement instrument work package
Test and assembly objects:Customer-supplied acoustic instruments and designated measuring points
Development and delivery:Arrange sound source, measurement points and background noise records, and save the original spectrum
Project input:Sound source/reference sensing, coupling fixtures, geometric environment, time base and sampling configuration
Acceptance method:Reference sound calibration and background noise check, calculation method and site conditions are fixed
Vehicle PartsNVHInstrument and Condition Alignment Package
Test and assembly objects:Customer-supplied acoustic and vibration equipment and component racks
Development and delivery:Unify working conditions, speed and sound and vibration records, and save the original results of the instrument
Project input:Sound source/reference sensing, coupling fixtures, geometric environment, time base and sampling configuration
Acceptance method:Acoustic calibration and speed reference recheck, bench background and measured component signals separated
RF network, antenna and spectrum instrumentation orchestration
RF power amplifier power gain and compression test package
Test and assembly objects:Amplifiers, signal sources and power measurement chains
Development and delivery:Scan input power and frequency points, record gain compression and temperature conditions
Project input:Customer Supply Network/Spectrum/Signal Source, Band Power, RF Fixtures and Calibration Parts
Acceptance method:Check link loss and power reference, keep temperature rise and protection action records
RF filter insertion loss out-of-band suppression binning tool
Test and assembly objects:Customer supplied vector nets and filter fixtures
Development and delivery:Calculate specified frequency band indicators and bins from raw S parameters
Project input:Customer Supply Network/Spectrum/Signal Source, Band Power, RF Fixtures and Calibration Parts
Acceptance method:Independently recalculate the passband definition and worst point using known data, preserving the full frequency sweep
Wireless module conductive transceiver test instrument interface
Test and assembly objects:Customer-supplied comprehensive tester and module control port
Development and delivery:Configure the specified format and channel, record the transmit power and receive test conditions
Project input:Customer Supply Network/Spectrum/Signal Source, Band Power, RF Fixtures and Calibration Parts
Acceptance method:Compared with the instrument’s native results, no coverage is claimed outside the authorized format and frequency band.
RF Switch Lifetime and Channel Isolation Work Package
Test and assembly objects:RF switches, customer supply networks and drivers
Development and delivery:Correlating switching times, conduction losses and isolation changes
Project input:Customer Supply Network/Spectrum/Signal Source, Band Power, RF Fixtures and Calibration Parts
Acceptance method:Refer to the pass-through link to check drift, switching leakage and wrong ports must be detected
Cable insertion loss, crosstalk and bending before and after comparison package
Test and assembly objects:Customer supplied network analyzer and cable bending device
Development and delivery:Save the insertion loss and crosstalk results before and after bending according to the same port
Project input:Customer Supply Network/Spectrum/Signal Source, Band Power, RF Fixtures and Calibration Parts
Acceptance method:Calibration and fixture are consistent, connector re-insertion affects single row
Conducted disturbanceLISNChannel switching work package
Test and assembly objects:Customer supplyLISN, receiver and switcher
Development and delivery:Record the line type, wiring status and spectrum, and arrange the customer supply measurement process
Project input:Customer Supply Network/Spectrum/Signal Source, Band Power, RF Fixtures and Calibration Parts
Acceptance method:Channel interchange and reference load review, wiring errors need to block valid results
High-speed electrical signals, time frequency and trigger reference
Bit error meter multi-channel long-term stable statistics and interruption recovery
Test and assembly objects:Customer supplied bit error meter and interconnect link
Development and delivery:Record pattern, number of valid bits, error count and lock-out interval
Project input:Customer-supplied oscilloscope/bit error meter/time-frequency reference, fixture and authorized analysis software
Acceptance method:Verify the count with injected errors and lost lock samples, and keep statistics for zero error time
Frequency meter and constant temperature crystal oscillator aging record package
Test and assembly objects:Customer supplied frequency meter, reference source and temperature control
Development and delivery:Correlate frequency offset, power-on time and temperature to form stable period and drift records
Project input:Customer-supplied oscilloscope/bit error meter/time-frequency reference, fixture and authorized analysis software
Acceptance method:The reference source status and counting gate are traceable, and frequency drift and temperature drift are separated.
SerDesLink training status is associated with physical measurements
Test and assembly objects:Customer-provided status logs and physical layer instrumentation
Development and delivery:Align training, retraining and eye diagram error results, retaining cross-source time basis
Project input:Customer-supplied oscilloscope/bit error meter/time-frequency reference, fixture and authorized analysis software
Acceptance method:Manually trigger sample verification time mapping, protocol logs do not replace electrical measurement waveforms
Photoelectric trigger delay and time interval measurement package
Test and assembly objects:Photodetectors, trigger ports and customer-supplied oscilloscopes
Development and delivery:Statistics of delay distribution between specified edges, preserving time base and threshold
Project input:Customer-supplied oscilloscope/bit error meter/time-frequency reference, fixture and authorized analysis software
Acceptance method:Reference pulse and channel exchange retest, instrument channel time difference must be taken into account
Ultrasound, eddy current and non-destructive scan data
Impact echo concrete tester data module
Test and assembly objects:Customer-supplied impact echometer and structural parameters
Development and delivery:Read waveforms and customer-provided algorithm results, correlate measurement points and manual review
Project input:Customer-supplied detector/SDK, probe, reference test block, scanning mechanism and method manager
Acceptance method:Compare the sample with known thickness and the original results of the instrument, and the geometric assumptions are listed separately.
Ultrasonic water immersion scanning tank movement and acquisition linkage
Test and assembly objects:Customer supplied scanning slots, motion axes and detectors
Development and delivery:Unify scanning step distance, trigger and workpiece coordinates, and save defective re-scanning records
Project input:Customer-supplied detector/SDK, probe, reference test block, scanning mechanism and method manager
Acceptance method:Check the positioning of the ruler and the standard test block. Coupling and triggering failures are not considered valid points.
Blade Fastener Pretensioning Ultrasonic Data Work Package
Test and assembly objects:Customer-supplied ultrasonic bolt gauge and installation records
Development and delivery:Correlate bolt identity, raw readings, and temperature conditions
Project input:Customer-supplied detector/SDK, probe, reference test block, scanning mechanism and method manager
Acceptance method:Check the known preload reference parts, and the conversion of sound time and preload force does not deviate from the material calibration.
Corrosion, electrochemical and coating test interfaces
Anodizing sealing and electrochemical testing work package
Test and assembly objects:Sealing quality instrument and test pieces provided by customers
Development and delivery:Read original instrument results such as impedance or admittance, and bind surface treatment conditions
Project input:Customer Service Chemistry/Coating Instruments, Specimens, Media and Methods Responsible Person
Acceptance method:The standard reference is checked with the original machine results, and the applicable scope of the method is confirmed by the craftsman.
Existing device interface replacement and migration verification
Instrument replacement interface compatibility and result comparison package
Test and assembly objects:Original instrument and proposed replacement instrument and reference samples
Development and delivery:Generate command discrepancy, range mapping, and result deviation reports
Project input:Legally available old equipment data, interface licenses, old baselines and recovery conditions
Acceptance method:Blind testing of the same product on two machines, the historical caliber cannot be silently replaced before the difference is confirmed
Interface replacement and return work package for discontinued boards
Test and assembly objects:Authorize old board data and replacement board prototypes
Development and delivery:Confirm pin electrical timing, output alternatives and regression matrices
Project input:Legally available old equipment data, interface licenses, old baselines and recovery conditions
Acceptance method:The original board and the replacement board are compared under the same working conditions, and the protection and abnormal interfaces are verified one by one.
OldHMIreplacement and recipe migration work package
Test and assembly objects:Authorize oldHMI projects and new terminals
Development and delivery:Migrate screen point table recipes and record missing functions and operational differences
Project input:Legally available old equipment data, interface licenses, old baselines and recovery conditions
Acceptance method:Compare the old baseline item by item, and the permissions and recipe writing and readback need to be verified on the actual machine.
Test bench wiring harness reconstruction and interface document recovery package
Test and assembly objects:Original bench, authorized wiring and physical objects
Development and delivery:Review pins, continuity and labels, deliver wiring diagrams and verification records
Project input:Legally available old equipment data, interface licenses, old baselines and recovery conditions
Acceptance method:Power off and on/off verification and controlled power on, unknown nodes cannot be guessed.
Functional retest work package after equipment repair
Test and assembly objects:Returned equipment and confirmed factory baseline
Development and delivery:Perform designated function retests and record differences before and after repairs
Project input:Legally available old equipment data, interface licenses, old baselines and recovery conditions
Acceptance method:Independent normal fault baseline retest, do not write functional recovery as full performance recovery
Engineering design materials, supply and delivery tools
Testing requirements to measurement link selection review services
Test and assembly objects:Clarify test pieces, indicators and existing resources
Development and delivery:Outputting measurement points, reference chains, error budgets, and purchasing boundaries does not represent a commitment to instrument performance.
Project input:Authorized drawings/BOM/interfaces with real engineering baselines, versions and responsibility boundaries
Acceptance method:Each indicator can be traced back to the instrument range error and acceptance method, and unknown items are clearly listed
InstrumentBOMSubstitute material impact verification tool
Test and assembly objects:AuthorizationBOM, device specifications and change orders
Development and delivery:Mark electrical package temperature differences and items that need to be retested
Project input:Authorized drawings/BOM/interfaces with real engineering baselines, versions and responsibility boundaries
Acceptance method:Compared with engineering artificial benchmarks, replacements cannot be determined by name alone.
Drawing size unit and interface consistency check
Test and assembly objects:Authorized drawings, wiring diagrams and interface instructions
Development and delivery:Check the number, size unit and interface conflicts, and form a list to be manually confirmed
Project input:Authorized drawings/BOM/interfaces with real engineering baselines, versions and responsibility boundaries
Acceptance method:Independent question sets verify detection and false positives, and scan recognition results retain the original image positioning.
Equipment FAT and SAT acceptance script customization service
Test and assembly objects:Contract indicators, equipment status and acceptance samples
Development and delivery:Write on-site executable steps, original records and deviation closed-loop templates
Project input:Authorized drawings/BOM/interfaces with real engineering baselines, versions and responsibility boundaries
Acceptance method:Each contract indicator corresponds to working conditions, reference and original evidence, and untested items will not pass
Open Source and Commercial InstrumentsSDK License Inventory Package
Test and assembly objects:Project dependencies, instrumentation, and delivery methods
Development and delivery:Delivery version license source and redistribution boundary pending legal confirmation
Project input:Authorized drawings/BOM/interfaces with real engineering baselines, versions and responsibility boundaries
Acceptance method:Comparing with the actual installation and packaging content, technical inventory does not replace legal conclusions
Small batch trial production issues and revision tracking tools
Test and assembly objects:Prototype BOM, fault records and revision data
Development and delivery:Related issues, responsibility confirmation, changes and retest results
Project input:Authorized drawings/BOM/interfaces with real engineering baselines, versions and responsibility boundaries
Acceptance method:Extract actual problems to check the closure evidence. The closure record cannot only have status changes.
Test Engineer Toolchain Training and Handover Package
Test and assembly objects:Benchmark, source code and operating materials have been delivered
Development and delivery:Provide reproducible environments, fault samples and takeover practice records
Project input:Authorized drawings/BOM/interfaces with real engineering baselines, versions and responsibility boundaries
Acceptance method:Installation, testing, exception recovery and data export are completed by the takeover personnel in an independent environment.
Related services
- 4G Water Leak Alarm Terminal Development
- Aging test tooling development
- Robot tactile sensor development
- PCBA test fixture development
- Development of UAV multi-sensor mission load controller
- Industrial controller development
- Linux Development of process recipe management terminal
- Telemetry analysis, playback, visualization and reporting software development
- Document parsing large model development
- Point cloud development
- Oil sensor development
- FPGA signal integrity analysis
- Time synchronization and deterministic scheduling development
- Xinchuang environment migration and adaptation
- DFM manufacturability design
FAQ
What input conditions are required for this task?
Provide the test object, existing bench, reference instruments, interface and protocol documents, operating conditions and expected outputs. If information is incomplete, first assess interface access and a feasible single-module scope.
How to accept this task?
Using fixed equipment, versions, operating conditions and references, check raw inputs, calculations, outputs, failures and recovery. Retain raw data, instrument settings and reviewable records. Define thresholds and acceptance criteria in the project documents.
Can I delegate only the instrument interface or test software?
The scope can cover an individual instrument driver, acquisition, process control, data calculation or user-interface module. Complete equipment integration requires separate agreement on mechanical, electrical, method and site responsibilities.
Online
Phone
WeChat
Top