Linked coordinates, needle drop status and instrument testing, output wafer result mapping
Applicable purchasers
Semiconductor equipment, fixtures, laboratories and packaging supporting companies
Test and assembly objects
Customer-supplied probe stations, measuring instruments and wafer maps
Development and delivery
Linked coordinates, needle drop status and instrument testing, output wafer result mapping
Project input
Existing institutions and instruments, sample identities, queues/interlocks, and failure fallback rules
Acceptance method
Fixed wafer map, probe station coordinates and instrument configuration, verify movement/pin drop permission, test triggering, position to result mapping and failure fallback.
Implementation steps
Object and interface verification → Reference link and solution confirmation → Single module prototype → Instrument and equipment joint debugging → Independent reference re-inspection → Source code, configuration and record delivery.
Equipment condition and scope confirmation
The scope may include control boards, firmware, instrument drivers, host software, process configuration and test records. Mechanical fixtures, pressure-bearing structures, fluid circuits, power circuits and optical or acoustic references are provided or separately designed by the responsible parties. Measurement specifications are established through validation with the target equipment and independent references.
Source code, design documents, instrument licensing, procurement, on-site support and ongoing maintenance scope are listed in the project documents.
FAQ
What input conditions are required for this task?
Existing institutions and instruments, sample identities, queues/interlocks, and failure fallback rules
How to accept this task?
Fixed wafer map, probe station coordinates and instrument configuration, verify movement/pin drop permission, test triggering, position to result mapping and failure fallback.
Can I delegate only the instrument interface or test software?
The scope can cover an individual instrument driver, acquisition, process control, data calculation or user-interface module. Complete equipment integration requires separate agreement on mechanical, electrical, method and site responsibilities.
Online
Phone
WeChat
Top