Test, Assembly and Instrumentation Development

Liquid-cooling vacuum filling and degassing station control

Control vacuuming, quantitative filling, exhaust and termination status and save filling records Source code, design documents, instrument licensing, procurement, on-site support and ongoing maintenance scope are listed in the project documents.

Equipment condition and scope confirmation

Start with one interface or measurement process, or combine acquisition, control, operator interfaces and data records. Confirm equipment, methods, reference instruments and acceptance conditions before implementation.

Control vacuuming, quantitative filling, exhaust and termination status and save filling records

Applicable purchasers

CDU, cold plate, quick connect, liquid cooling cabinet and test equipment supplier

Test and assembly objects

Closed liquid cooling circuit and filling valve block

Development and delivery

Control vacuuming, quantitative filling, exhaust and termination status and save filling records

Project input

Allowed media or materials, weighing/flow reference, pump valve and container/action conditions

Acceptance method

Check the vacuum process, mass/liquid volume before and after filling, valve sequence and termination status, record the medium and volume; the exhaust effect is verified according to observable specified methods.

Implementation steps

Object and interface verification → Reference link and solution confirmation → Single module prototype → Instrument and equipment joint debugging → Independent reference re-inspection → Source code, configuration and record delivery.

Equipment condition and scope confirmation

The scope may include control boards, firmware, instrument drivers, host software, process configuration and test records. Mechanical fixtures, pressure-bearing structures, fluid circuits, power circuits and optical or acoustic references are provided or separately designed by the responsible parties. Measurement specifications are established through validation with the target equipment and independent references.

Source code, design documents, instrument licensing, procurement, on-site support and ongoing maintenance scope are listed in the project documents.

FAQ

What input conditions are required for this task?

Allowed media or materials, weighing/flow reference, pump valve and container/action conditions

How to accept this task?

Check the vacuum process, mass/liquid volume before and after filling, valve sequence and termination status, record the medium and volume; the exhaust effect is verified according to observable specified methods.

Can I delegate only the instrument interface or test software?

The scope can cover an individual instrument driver, acquisition, process control, data calculation or user-interface module. Complete equipment integration requires separate agreement on mechanical, electrical, method and site responsibilities.

Related services

Provide equipment and test conditions and confirm development scope

Describe the device under test, existing bench, instrument interface, target operating conditions and modules to be delivered.

Communicate project needs
Online
Phone
13910119357
WeChat
WhatsApp
Winge Technology WhatsApp QR code Scan or click to contact us
Top