Test, Assembly and Instrumentation Development

Quick-connector insertion force and residual-liquid test tooling

Simultaneously record the insertion and extraction force, displacement, connection status and residual liquid weighing after disconnection Source code, design documents, instrument licensing, procurement, on-site support and ongoing maintenance scope are listed in the project documents.

Equipment condition and scope confirmation

Start with one interface or measurement process, or combine acquisition, control, operator interfaces and data records. Confirm equipment, methods, reference instruments and acceptance conditions before implementation.

Simultaneously record the insertion and extraction force, displacement, connection status and residual liquid weighing after disconnection

Applicable purchasers

CDU, cold plate, quick connect, liquid cooling cabinet and test equipment supplier

Test and assembly objects

Liquid cooled quick connect and mating connectors

Development and delivery

Simultaneously record the insertion and extraction force, displacement, connection status and residual liquid weighing after disconnection

Project input

Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture

Acceptance method

Fix joint pairings, media and mating and unmating speeds, check connection status, wet/dry processes and repeat measurements against force-displacement references and residual liquid weighing.

Implementation steps

Object and interface verification → Reference link and solution confirmation → Single module prototype → Instrument and equipment joint debugging → Independent reference re-inspection → Source code, configuration and record delivery.

Equipment condition and scope confirmation

The scope may include control boards, firmware, instrument drivers, host software, process configuration and test records. Mechanical fixtures, pressure-bearing structures, fluid circuits, power circuits and optical or acoustic references are provided or separately designed by the responsible parties. Measurement specifications are established through validation with the target equipment and independent references.

Source code, design documents, instrument licensing, procurement, on-site support and ongoing maintenance scope are listed in the project documents.

FAQ

What input conditions are required for this task?

Loading mechanism, force displacement reference, specimen geometry, speed and fixed fixture

How to accept this task?

Fix joint pairings, media and mating and unmating speeds, check connection status, wet/dry processes and repeat measurements against force-displacement references and residual liquid weighing.

Can I delegate only the instrument interface or test software?

The scope can cover an individual instrument driver, acquisition, process control, data calculation or user-interface module. Complete equipment integration requires separate agreement on mechanical, electrical, method and site responsibilities.

Related services

Provide equipment and test conditions and confirm development scope

Describe the device under test, existing bench, instrument interface, target operating conditions and modules to be delivered.

Communicate project needs
Online
Phone
13910119357
WeChat
WhatsApp
Winge Technology WhatsApp QR code Scan or click to contact us
Top