Test, Assembly and Instrumentation Development

Liquid-cooling CDU control board and monitoring firmware

Form pump valve state machine, HMI, communication and exception recovery firmware Source code, design documents, instrument licensing, procurement, on-site support and ongoing maintenance scope are listed in the project documents.

Equipment condition and scope confirmation

Start with one interface or measurement process, or combine acquisition, control, operator interfaces and data records. Confirm equipment, methods, reference instruments and acceptance conditions before implementation.

Form pump valve state machine, HMI, communication and exception recovery firmware

Applicable purchasers

CDU, cold plate, quick connect, liquid cooling cabinet and test equipment supplier

Test and assembly objects

A set of CDU and pump valve sensing interface

Development and delivery

Form pump valve state machine, HMI, communication and exception recovery firmware

Project input

Existing interfaces, electrical power supply, control objects, status tables and software and hardware information

Acceptance method

Verify sensor access, pump and valve output, communication, loss of contact and restart recovery according to the CDU input/status table; the control prototype and the entire flow path thermal performance are separately accepted.

Implementation steps

Object and interface verification → Reference link and solution confirmation → Single module prototype → Instrument and equipment joint debugging → Independent reference re-inspection → Source code, configuration and record delivery.

Equipment condition and scope confirmation

The scope may include control boards, firmware, instrument drivers, host software, process configuration and test records. Mechanical fixtures, pressure-bearing structures, fluid circuits, power circuits and optical or acoustic references are provided or separately designed by the responsible parties. Measurement specifications are established through validation with the target equipment and independent references.

Source code, design documents, instrument licensing, procurement, on-site support and ongoing maintenance scope are listed in the project documents.

FAQ

What input conditions are required for this task?

Existing interfaces, electrical power supply, control objects, status tables and software and hardware information

How to accept this task?

Verify sensor access, pump and valve output, communication, loss of contact and restart recovery according to the CDU input/status table; the control prototype and the entire flow path thermal performance are separately accepted.

Can I delegate only the instrument interface or test software?

The scope can cover an individual instrument driver, acquisition, process control, data calculation or user-interface module. Complete equipment integration requires separate agreement on mechanical, electrical, method and site responsibilities.

Related services

Provide equipment and test conditions and confirm development scope

Describe the device under test, existing bench, instrument interface, target operating conditions and modules to be delivered.

Communicate project needs
Online
Phone
13910119357
WeChat
WhatsApp
Winge Technology WhatsApp QR code Scan or click to contact us
Top