Save the original data of temperature and time and calculate the cooling rate according to the specified algorithm
Applicable purchasers
Stamping, welding, heat treatment equipment and materials research and development enterprises
Test and assembly objects
Standard probes and customer-supplied quenching measuring devices
Development and delivery
Save the original data of temperature and time and calculate the cooling rate according to the specified algorithm
Project input
Heat source and cooling loop, temperature power reference, specimen installation and steady state definition
Acceptance method
Independent calculation checks sampling and smoothing effects, probe and media batches are traceable
Implementation steps
Object and interface verification → Reference link and solution confirmation → Single module prototype → Instrument and equipment joint debugging → Independent reference re-inspection → Source code, configuration and record delivery.
Equipment condition and scope confirmation
The scope may include control boards, firmware, instrument drivers, host software, process configuration and test records. Mechanical fixtures, pressure-bearing structures, fluid circuits, power circuits and optical or acoustic references are provided or separately designed by the responsible parties. Measurement specifications are established through validation with the target equipment and independent references.
Source code, design documents, instrument licensing, procurement, on-site support and ongoing maintenance scope are listed in the project documents.
FAQ
What input conditions are required for this task?
Heat source and cooling loop, temperature power reference, specimen installation and steady state definition
How to accept this task?
Independent calculation checks sampling and smoothing effects, probe and media batches are traceable
Can I delegate only the instrument interface or test software?
The scope can cover an individual instrument driver, acquisition, process control, data calculation or user-interface module. Complete equipment integration requires separate agreement on mechanical, electrical, method and site responsibilities.
Online
Phone
WeChat
Top