Test, Assembly and Instrumentation Development

Cell OCV and internal-resistance sorting test tooling

Correlate the workpiece identity, OCV and internal resistance to generate binning and retest records Source code, design documents, instrument licensing, procurement, on-site support and ongoing maintenance scope are listed in the project documents.

Equipment condition and scope confirmation

Start with one interface or measurement process, or combine acquisition, control, operator interfaces and data records. Confirm equipment, methods, reference instruments and acceptance conditions before implementation.

Correlate the workpiece identity, OCV and internal resistance to generate binning and retest records

Applicable purchasers

Battery cells, BMS, energy storage supporting boards and testing equipment companies

Test and assembly objects

Specified battery cell and voltage internal resistance meter

Development and delivery

Correlate the workpiece identity, OCV and internal resistance to generate binning and retest records

Project input

Reference electrical measuring instruments, wiring contacts, excitation range and temperature conditions

Acceptance method

Use known reference or control instruments to check OCV/internal resistance, contact conditions and temperature, verify binning boundaries, identity, retest and bad contact handling.

Implementation steps

Object and interface verification → Reference link and solution confirmation → Single module prototype → Instrument and equipment joint debugging → Independent reference re-inspection → Source code, configuration and record delivery.

Equipment condition and scope confirmation

The scope may include control boards, firmware, instrument drivers, host software, process configuration and test records. Mechanical fixtures, pressure-bearing structures, fluid circuits, power circuits and optical or acoustic references are provided or separately designed by the responsible parties. Measurement specifications are established through validation with the target equipment and independent references.

Source code, design documents, instrument licensing, procurement, on-site support and ongoing maintenance scope are listed in the project documents.

FAQ

What input conditions are required for this task?

Reference electrical measuring instruments, wiring contacts, excitation range and temperature conditions

How to accept this task?

Use known reference or control instruments to check OCV/internal resistance, contact conditions and temperature, verify binning boundaries, identity, retest and bad contact handling.

Can I delegate only the instrument interface or test software?

The scope can cover an individual instrument driver, acquisition, process control, data calculation or user-interface module. Complete equipment integration requires separate agreement on mechanical, electrical, method and site responsibilities.

Related services

Provide equipment and test conditions and confirm development scope

Describe the device under test, existing bench, instrument interface, target operating conditions and modules to be delivered.

Communicate project needs
Online
Phone
13910119357
WeChat
WhatsApp
Winge Technology WhatsApp QR code Scan or click to contact us
Top