Test, Assembly and Instrumentation Development

Battery EIS instrument automation and result comparison

Arrange frequency points and temperature status, save complex impedance original data and reference differences Source code, design documents, instrument licensing, procurement, on-site support and ongoing maintenance scope are listed in the project documents.

Equipment condition and scope confirmation

Start with one interface or measurement process, or combine acquisition, control, operator interfaces and data records. Confirm equipment, methods, reference instruments and acceptance conditions before implementation.

Arrange frequency points and temperature status, save complex impedance original data and reference differences

Applicable purchasers

Battery cells, BMS, energy storage supporting boards and testing equipment companies

Test and assembly objects

Cell and Authorized Impedance Analyzer

Development and delivery

Arrange frequency points and temperature status, save complex impedance original data and reference differences

Project input

Reference electrical measuring instruments, wiring contacts, excitation range and temperature conditions

Acceptance method

Use the reference parts/samples approved by the instrument to check the frequency, amplitude and phase or complex impedance, temperature and data units, compare the original results with the calculated output, and record the model fitting conditions.

Implementation steps

Object and interface verification → Reference link and solution confirmation → Single module prototype → Instrument and equipment joint debugging → Independent reference re-inspection → Source code, configuration and record delivery.

Equipment condition and scope confirmation

The scope may include control boards, firmware, instrument drivers, host software, process configuration and test records. Mechanical fixtures, pressure-bearing structures, fluid circuits, power circuits and optical or acoustic references are provided or separately designed by the responsible parties. Measurement specifications are established through validation with the target equipment and independent references.

Source code, design documents, instrument licensing, procurement, on-site support and ongoing maintenance scope are listed in the project documents.

FAQ

What input conditions are required for this task?

Reference electrical measuring instruments, wiring contacts, excitation range and temperature conditions

How to accept this task?

Use the reference parts/samples approved by the instrument to check the frequency, amplitude and phase or complex impedance, temperature and data units, compare the original results with the calculated output, and record the model fitting conditions.

Can I delegate only the instrument interface or test software?

The scope can cover an individual instrument driver, acquisition, process control, data calculation or user-interface module. Complete equipment integration requires separate agreement on mechanical, electrical, method and site responsibilities.

Related services

Provide equipment and test conditions and confirm development scope

Describe the device under test, existing bench, instrument interface, target operating conditions and modules to be delivered.

Communicate project needs
Online
Phone
13910119357
WeChat
WhatsApp
Winge Technology WhatsApp QR code Scan or click to contact us
Top