Synchronized angle and multi-point radial displacement, separated clamping eccentricity and repeated rotation error
Applicable purchasers
Machine tools, spindles, transmission parts and equipment maintenance companies
Test and assembly objects
Spindle, standard rod and displacement probe
Development and delivery
Synchronized angle and multi-point radial displacement, separated clamping eccentricity and repeated rotation error
Project input
Customer reference instruments/measuring instruments, geometric datums, clamping and error budgets
Acceptance method
Re-inspection of reversing and reinstalling the standard rod, retaining reference parts and installation positions
Implementation steps
Object and interface verification → Reference link and solution confirmation → Single module prototype → Instrument and equipment joint debugging → Independent reference re-inspection → Source code, configuration and record delivery.
Equipment condition and scope confirmation
The scope may include control boards, firmware, instrument drivers, host software, process configuration and test records. Mechanical fixtures, pressure-bearing structures, fluid circuits, power circuits and optical or acoustic references are provided or separately designed by the responsible parties. Measurement specifications are established through validation with the target equipment and independent references.
Source code, design documents, instrument licensing, procurement, on-site support and ongoing maintenance scope are listed in the project documents.
FAQ
What input conditions are required for this task?
Customer reference instruments/measuring instruments, geometric datums, clamping and error budgets
How to accept this task?
Re-inspection of reversing and reinstalling the standard rod, retaining reference parts and installation positions
Can I delegate only the instrument interface or test software?
The scope can cover an individual instrument driver, acquisition, process control, data calculation or user-interface module. Complete equipment integration requires separate agreement on mechanical, electrical, method and site responsibilities.
Online
Phone
WeChat
Top