Test, Assembly and Instrumentation Development

Pin-on-disc friction and wear test control software

Record friction coefficient, temperature, wear displacement and working condition changes Source code, design documents, instrument licensing, procurement, on-site support and ongoing maintenance scope are listed in the project documents.

Equipment condition and scope confirmation

Start with one interface or measurement process, or combine acquisition, control, operator interfaces and data records. Confirm equipment, methods, reference instruments and acceptance conditions before implementation.

Record friction coefficient, temperature, wear displacement and working condition changes

Applicable purchasers

Bearings, seals, lubricating materials and friction testing equipment companies

Test and assembly objects

Customer supply plate machine, load and speed chain

Development and delivery

Record friction coefficient, temperature, wear displacement and working condition changes

Project input

Customer-supplied testing machines, normal/tangential force or torque references, specimens and environmental conditions

Acceptance method

Reference force and speed check, no-load friction deduction rules and wear mark measurement are recorded separately

Implementation steps

Object and interface verification → Reference link and solution confirmation → Single module prototype → Instrument and equipment joint debugging → Independent reference re-inspection → Source code, configuration and record delivery.

Equipment condition and scope confirmation

The scope may include control boards, firmware, instrument drivers, host software, process configuration and test records. Mechanical fixtures, pressure-bearing structures, fluid circuits, power circuits and optical or acoustic references are provided or separately designed by the responsible parties. Measurement specifications are established through validation with the target equipment and independent references.

Source code, design documents, instrument licensing, procurement, on-site support and ongoing maintenance scope are listed in the project documents.

FAQ

What input conditions are required for this task?

Customer-supplied testing machines, normal/tangential force or torque references, specimens and environmental conditions

How to accept this task?

Reference force and speed check, no-load friction deduction rules and wear mark measurement are recorded separately

Can I delegate only the instrument interface or test software?

The scope can cover an individual instrument driver, acquisition, process control, data calculation or user-interface module. Complete equipment integration requires separate agreement on mechanical, electrical, method and site responsibilities.

Related services

Provide equipment and test conditions and confirm development scope

Describe the device under test, existing bench, instrument interface, target operating conditions and modules to be delivered.

Communicate project needs
Online
Phone
13910119357
WeChat
WhatsApp
Winge Technology WhatsApp QR code Scan or click to contact us
Top