Maintain customer supply loading mode and record force and displacement changes over time
Applicable purchasers
Plastic rubber, sealing, buffering materials and instrument companies
Test and assembly objects
Customer-supplied testing machines and material samples
Development and delivery
Maintain customer supply loading mode and record force and displacement changes over time
Project input
Customer-supplied testing machines, normal/tangential force or torque references, specimens and environmental conditions
Acceptance method
Instrument drift is separated from specimen changes using independent displacement and time reference checks
Implementation steps
Object and interface verification → Reference link and solution confirmation → Single module prototype → Instrument and equipment joint debugging → Independent reference re-inspection → Source code, configuration and record delivery.
Equipment condition and scope confirmation
The scope may include control boards, firmware, instrument drivers, host software, process configuration and test records. Mechanical fixtures, pressure-bearing structures, fluid circuits, power circuits and optical or acoustic references are provided or separately designed by the responsible parties. Measurement specifications are established through validation with the target equipment and independent references.
Source code, design documents, instrument licensing, procurement, on-site support and ongoing maintenance scope are listed in the project documents.
FAQ
What input conditions are required for this task?
Customer-supplied testing machines, normal/tangential force or torque references, specimens and environmental conditions
How to accept this task?
Instrument drift is separated from specimen changes using independent displacement and time reference checks
Can I delegate only the instrument interface or test software?
The scope can cover an individual instrument driver, acquisition, process control, data calculation or user-interface module. Complete equipment integration requires separate agreement on mechanical, electrical, method and site responsibilities.
Online
Phone
WeChat
Top