Test, Assembly and Instrumentation Development

Powder particle-size and sieving result comparison tools

Unify the sample number and save the volume distribution and screening mass distribution separately Source code, design documents, instrument licensing, procurement, on-site support and ongoing maintenance scope are listed in the project documents.

Equipment condition and scope confirmation

Start with one interface or measurement process, or combine acquisition, control, operator interfaces and data records. Confirm equipment, methods, reference instruments and acceptance conditions before implementation.

Unify the sample number and save the volume distribution and screening mass distribution separately

Applicable purchasers

Additive manufacturing, powder equipment and materials R&D enterprise

Test and assembly objects

Customer-supplied particle size analyzer and screening quality record

Development and delivery

Unify the sample number and save the volume distribution and screening mass distribution separately

Project input

Device protocol/SDK, license, operating procedures, target environment and abnormal samples

Acceptance method

Check the particle size unit and distribution benchmark. Mass and volume distribution cannot be directly mixed.

Implementation steps

Object and interface verification → Reference link and solution confirmation → Single module prototype → Instrument and equipment joint debugging → Independent reference re-inspection → Source code, configuration and record delivery.

Equipment condition and scope confirmation

The scope may include control boards, firmware, instrument drivers, host software, process configuration and test records. Mechanical fixtures, pressure-bearing structures, fluid circuits, power circuits and optical or acoustic references are provided or separately designed by the responsible parties. Measurement specifications are established through validation with the target equipment and independent references.

Source code, design documents, instrument licensing, procurement, on-site support and ongoing maintenance scope are listed in the project documents.

FAQ

What input conditions are required for this task?

Device protocol/SDK, license, operating procedures, target environment and abnormal samples

How to accept this task?

Check the particle size unit and distribution benchmark. Mass and volume distribution cannot be directly mixed.

Can I delegate only the instrument interface or test software?

The scope can cover an individual instrument driver, acquisition, process control, data calculation or user-interface module. Complete equipment integration requires separate agreement on mechanical, electrical, method and site responsibilities.

Related services

Provide equipment and test conditions and confirm development scope

Describe the device under test, existing bench, instrument interface, target operating conditions and modules to be delivered.

Communicate project needs
Online
Phone
13910119357
WeChat
WhatsApp
Winge Technology WhatsApp QR code Scan or click to contact us
Top