Collect pressure differential flow, control the pressure maintaining process and output curves and judgment records
Applicable purchasers
CDU, cold plate, quick connect, liquid cooling cabinet and test equipment supplier
Test and assembly objects
Cold plate, joints and pipeline test pieces
Development and delivery
Collect pressure differential flow, control the pressure maintaining process and output curves and judgment records
Project input
Specimen medium, pressure/vacuum range, volume temperature, reference instrument, flow path and fixture
Acceptance method
Compare the pressure/pressure difference/flow reference under fixed medium, pressure range, volume and temperature to verify the pressure holding process, steady-state flow resistance curve, abnormal termination and repeatability; pressure drop does not directly convert to leakage rate.
Implementation steps
Object and interface verification → Reference link and solution confirmation → Single module prototype → Instrument and equipment joint debugging → Independent reference re-inspection → Source code, configuration and record delivery.
Equipment condition and scope confirmation
The scope may include control boards, firmware, instrument drivers, host software, process configuration and test records. Mechanical fixtures, pressure-bearing structures, fluid circuits, power circuits and optical or acoustic references are provided or separately designed by the responsible parties. Measurement specifications are established through validation with the target equipment and independent references.
Source code, design documents, instrument licensing, procurement, on-site support and ongoing maintenance scope are listed in the project documents.
FAQ
What input conditions are required for this task?
Specimen medium, pressure/vacuum range, volume temperature, reference instrument, flow path and fixture
How to accept this task?
Compare the pressure/pressure difference/flow reference under fixed medium, pressure range, volume and temperature to verify the pressure holding process, steady-state flow resistance curve, abnormal termination and repeatability; pressure drop does not directly convert to leakage rate.
Can I delegate only the instrument interface or test software?
The scope can cover an individual instrument driver, acquisition, process control, data calculation or user-interface module. Complete equipment integration requires separate agreement on mechanical, electrical, method and site responsibilities.
Online
Phone
WeChat
Top