4G Connectivity · Custom Development for Enterprises

4G Construction Machinery Telematics Terminal Development

For construction machinery manufacturers, equipment after-sales companies and machinery operation platform companies, connect to authorized CAN or serial port protocols, develop working hours, faults, locations and maintenance data collection, and complete cloud equipment files and reports.

Construction machinery and robot operation and maintenanceSoftware, hardware and system integration testingPhased delivery

SERVICE OVERVIEW

Service overview

4G The construction machinery remote information terminal is developed for enterprise projects where "construction machinery manufacturers need to know the status of equipment in service". Winge Technology carries out the docking of terminal hardware, embedded software and business systems based on existing equipment and target functions, forming design data and programs that can be used for subsequent integration testing, deployment and maintenance.

  • Device and interface access
  • Product business functions
  • Platform and data connection
  • Exception handling and operational constraints

DEVELOPMENT SCOPE

Development services

Development Scope

01

Device and interface access

Adapt to the authorized CAN or serial port protocol, access working hours, faults, locations and maintenance counts, and distinguish the data sources of the controller and additional sensors.

02

Product business functions

Interface with authorized CAN or serial port protocol, develop working hours, fault, location and maintenance data collection, and complete cloud device files and reports.

03

Platform and data connection

Combined with the business link of device bus and status → operation and maintenance terminal → 4G → tasks and device files → diagnosis and maintenance, the device identity, data fields, update time, abnormal status and result confirmation method are defined.

04

Exception handling and operational constraints

Reading parameters and mechanical control should be separated; the impact of newly added communication terminals on the original bus, power supply and complete device work should be verified.

Data and Operational Workflow

Mechanical status collection → local recording and aggregation → 4G return → equipment files → maintenance plan and after-sales diagnosis.

The device side, communication side and platform side retain necessary status and logs respectively. Project integration testing is checked with actual equipment data and execution results, and network connection status and business completion status are recorded separately.

Project Inputs

  • Existing device models, interface and wiring diagrams, licensing agreements, data samples and available codes.
  • Business process and parameters: mechanical model, authorized bus protocol, working hours fault field and power supply conditions.
  • Target location, operator, SIM/APN, power supply, installation method and equipment size.
  • Existing platform interfaces, user roles, development modules, number of prototypes and planned nodes.

Deliverables and Acceptance

DeliverablesDelivery contentVerification method
product realizationHardware design data, prototypes or existing equipment modification data involved in the project, as well as corresponding firmware and interfacesCheck working hours, fault codes and original instruments.
Business integration testingData fields, status definitions, platform adaptation procedures and business integration testing recordsTest bus load, node disconnection and reconnection.
Version and test dataTarget hardware and software versions, build or deployment instructions, parameter configurations and test logsVerify startup power supply changes, data caching and maintenance reminders.

First confirm the scope and key functions, then complete prototype or software development, system integration testing and stage acceptance. The acceptance conditions list the prototype, version, environment, duration and passing threshold; source code, design documents, third-party licenses, materials, traffic, cloud resources and on-site work are agreed separately.

Frequently Asked Questions

Can different types of construction machinery share terminals?

The hardware and platform foundation can be reused, but the bus protocol, power supply, wiring harness and installation conditions need to be confirmed separately. After establishing field mapping and verification records for each model, it is then included in the adaptation list.

Can I entrust only part of the functions of the construction machinery remote information terminal?

The device interface, terminal program, 4G communication and platform integration testing can be split based on the existing R&D foundation. Please provide existing information and target boundaries, first check the "mechanical model, authorized bus protocol, working hours fault field and power supply conditions", and then clarify the deliverables and interface responsibilities of each module.

How are costs and cycle time assessed?

Split the workload based on target devices, interfaces, existing data, and verification criteria. This project focuses on checking the mechanical model, authorized bus protocol, working hours fault field and power supply conditions; when prototypes, on-site integration testing or third-party platform cooperation are required, the corresponding costs, prerequisites and nodes will be listed separately.

PROJECT DELIVERY

From requirements to delivery

01

Requirements review

Confirm business goals, existing devices and systems, interfaces and deployment conditions.

02

Scope and solution

Review technical dependencies and agree responsibilities, deliverables and acceptance methods.

03

Development and integration

Implement the agreed scope and integrate with the target devices and systems.

04

Testing and issue resolution

Run agreed test cases and record issues, fixes and regression results.

05

Handover and acceptance

Deliver the agreed work, build configurations, interface documentation and test records.

06

Maintenance and changes

Handle version maintenance and assess new requirements within the agreed support scope.

Define Devices, Interfaces and Deliverables

Please provide the target functions, existing equipment information and usage environment of the 4G construction machinery remote information terminal, focusing on the machine model, authorized bus protocol, working hours fault fields and power supply conditions, so as to facilitate the determination of the technical scope and stage delivery arrangements.

Discuss 4G Development
Online
Phone
13910119357
WeChat
WhatsApp
Winge Technology WhatsApp QR code Scan or click to contact us
Top