4G Connectivity · Custom Development for Enterprises

4G Construction Machinery and Robot Maintenance Development

For construction machinery manufacturers, robot companies and mobile equipment operators, we develop telemetry operation and maintenance terminals for construction machinery, robots, agricultural machinery and rental equipment to collect status, trajectory and maintenance records.

Industry sceneTerminal and platform collaborationDelegate by module

SERVICE OVERVIEW

Service overview

Develop telemetry operation and maintenance terminals for construction machinery, robots, agricultural machinery and rental equipment to collect status, trajectory and maintenance records. Winge Technology is aimed at construction machinery manufacturers, robot companies and mobile equipment operators. It combines acquisition, control, communication and application development based on field equipment, business processes and existing enterprise systems.

  • Field devices and terminals
  • Business and data
  • Platform and operation and maintenance
  • system constraints

DEVELOPMENT SCOPE

Development services

Scenario development scope

01

Field devices and terminals

Focus on the development of 4G engineering machinery remote information terminals, 4G development of unmanned vehicles and robot operation and maintenance gateways and other products to clarify the interface, power supply and installation conditions, and develop or transform terminals.

02

Business and data

According to the device bus and status → Operation and maintenance terminal → 4G → Task and device profile → Diagnosis and maintenance, define data, events, commands and results, and retain the association between devices, sites or projects.

03

Platform and operation and maintenance

Connect with existing enterprise platforms, or develop device management, historical data, alarms, permissions and client functions, and determine the scope by module.

04

system constraints

In the planning stage, check bus authorization, operation and job status, task validity period, mobile network and local control responsibilities, and clarify the responsibilities and exception handling of local and remote systems.

product development services

Select corresponding technical services based on field equipment and target business. You can start with a single terminal or combine multiple device types. The following products describe the interfaces, business processes, delivery materials and acceptance methods respectively.

Product Development

4G Construction Machinery Telematics Terminal Development

For construction machinery manufacturers, equipment after-sales companies and machinery operation platform companies, connect to authorized CAN or serial port protocols, develop working hours, faults, locations and maintenance data collection, and complete cloud equipment files and reports.

View Development Scope and Deliverables →
Product Development

4G Maintenance Gateway Development for Unmanned Vehicles and Robots

For robot companies, autonomous vehicle product teams and mobile device integrators, it connects robot status and task interfaces, develops telemetry, task status synchronization, log return, remote diagnosis and upgrade management.

View Development Scope and Deliverables →
Product Development

4G Agricultural Machinery Activity Monitoring Terminal Development

For agricultural machinery manufacturers, operation management platform enterprises and agricultural service operators, access GNSS and operation status signals, develop trajectories, working hours, task binding, network disconnection cache and platform statistics; the area algorithm is to be determined separately.

View Development Scope and Deliverables →
Product Development

4G Operating-Hour Tracking Terminal Development for Rental Equipment

For equipment leasing companies, machinery manufacturers and leasing management platform companies, access operation and power status, develop working hours accumulation, anti-tamper events, maintenance thresholds, project binding and leasing backend interfaces.

View Development Scope and Deliverables →

System composition and business process

Device bus and status → Operation and maintenance terminal → 4G → Task and device files → Diagnosis and maintenance.

The platform manages devices according to enterprise projects, sites and permissions. After the link is restored, check the data and service status; when control is involved, separately confirm command authority, timeliness, local conditions and execution feedback.

Project Inputs

  • Target business, equipment list, on-site location, equipment size and users.
  • Wiring, protocols, raw data and open software interfaces to existing equipment.
  • Key points to confirm: bus authorization, operation and operation status, task validity period, mobile network and local control responsibilities.
  • Platform status, data retention, client and deployment methods, prototype and on-site verification conditions.

Deliverables and Acceptance

stageDelivery contentVerification basis
Needs and plansEquipment interface list, business process, system architecture and development division of laborCheck bus authorization, operation and job status, task validity period, mobile network and local control responsibilities.
Development and integration testingAgree on terminal hardware, firmware, interfaces and platform applicationsCheck the fields, status, instructions and abnormal behaviors one by one according to the actual device.
Acceptance and handoverPrototype or program, design and deployment data, test records and version listAccept according to the agreed environment, sample, duration and threshold, and record the handling of failed items.

R&D, prototype materials, structure, testing, on-site implementation and subsequent operation and maintenance are listed separately. Project cost and cycle are evaluated based on equipment type, interface complexity, existing foundation and verification workload.

Specialist Development Services

Existing products or internal R&D teams can only entrust the following technical links. The interface and integration testing responsibilities are clearly stated in the project documents.

Specialist Development

4G CAN Data Acquisition and Forwarding Development

For engineering equipment companies, controller manufacturers and bus system integrators, it completes frame parsing, timestamps, filtering, aggregation and forwarding based on authorization message definitions; delivers parsing code, field tables and bus integration testing records.

View Development Scope and Deliverables →
Specialist Development

4G Offline Buffering and Resumable Data Upload Development

For monitoring terminal enterprises and data gateway R&D teams, develop persistent queues, serial numbers, confirmations, deduplication, speed limits and capacity overflow strategies; deliver cache modules, parameter descriptions and network and power outage records.

View Development Scope and Deliverables →
Specialist Development

4G OTA Update and Remote Diagnostics System Development

For networking equipment companies and equipment operation and maintenance platform teams, develop upgrade package verification, batch release, progress, failure handling, version management and log return; deliver upgrade links, tools and power outage recovery records.

View Development Scope and Deliverables →
Specialist Development

4G Network Diagnostics and Data Usage Management Development

For equipment manufacturers, network operation companies and after-sales R&D teams, we develop network registration status, signal indicators, failure reasons, usage statistics and upload strategies; we deliver diagnostic modules and operation and maintenance interfaces, and the operator's billing caliber is separately checked.

View Development Scope and Deliverables →

Frequently Asked Questions

How to divide the work between remote operation and maintenance and the local control system?

The operation and maintenance side is responsible for telemetry, task status, logs and authorized configuration, and the local control is responsible for movement, protection and emergency stop. The interface needs to clearly define acceptance conditions, disconnection behavior and execution result feedback.

Can I reuse existing platforms and terminals?

You can first check the existing interfaces, data and code, and focus new development on the missing links. This scenario requires focusing on checking bus authorization, operation and job status, task validity period, mobile network and local control responsibilities, and then determining the reusable scope and return work.

PROJECT DELIVERY

From requirements to delivery

01

Requirements review

Confirm business goals, existing devices and systems, interfaces and deployment conditions.

02

Scope and solution

Review technical dependencies and agree responsibilities, deliverables and acceptance methods.

03

Development and integration

Implement the agreed scope and integrate with the target devices and systems.

04

Testing and issue resolution

Run agreed test cases and record issues, fixes and regression results.

05

Handover and acceptance

Deliver the agreed work, build configurations, interface documentation and test records.

06

Maintenance and changes

Handle version maintenance and assess new requirements within the agreed support scope.

Define Devices, Interfaces and Deliverables

Please provide business processes, target equipment and existing system information, and explain bus authorization, operation and operation status, task validity period, mobile network and local control responsibilities to facilitate the formation of product portfolio, work division and stage delivery arrangements.

Discuss 4G Development
Online
Phone
13910119357
WeChat
WhatsApp
Winge Technology WhatsApp QR code Scan or click to contact us
Top