Development Scope
Scope and Basic Check
Determine the existing foundation, technical dependencies and content that needs to be developed based on module logs, network indicators, business packets, traffic statistics interfaces, billing standards and remote diagnosis permissions.
Implementation and integration
Collect registration, signal, connection failure and retry information, collect statistics on reporting, heartbeat, log and upgrade traffic, and configure diagnosis level and upload conditions.
Delivery Documentation
The diagnostic module and operation and maintenance interface are delivered, and the operator's billing caliber is separately verified.
Verification and Constraints
Diagnostic logs are screened based on troubleshooting purposes, and permissions, desensitization, retention, and upload scales should be clearly defined in the design.
Project implementation process
Verification of data and interfaces → Confirmation of technical solutions and verification use cases → Implementation of integration with the target environment → Regression of abnormal scenarios → Transfer of version data.
Verify the implementation results in the target hardware and software environment, and deliver records of associated interface configurations, version dependencies, and problem handling to facilitate subsequent integration and maintenance by the enterprise R&D team.
Project Inputs
- Module logs, network indicators, business packets, traffic statistics interfaces, billing standards and remote diagnosis permissions.
- Design information, code, interface permissions and target test equipment can be provided.
- Source files, programs or tools expected to be delivered, inter-module integration testing responsibilities and project nodes.
- Acceptance samples, environment, test conditions and passing thresholds.
Deliverables and Acceptance
| Deliverables | Delivery content | Verification method |
|---|---|---|
| achieve results | The diagnostic module and operation and maintenance interface are delivered, and the operator's billing caliber is separately verified. | Check the cause of the failure with the actual failure. |
| Integrated data | Versions and dependencies, interface configuration, usage or deployment steps, and integration changes | Compare terminal traffic and operator bill. |
| Verify records | Test conditions, execution records, problem lists and regression results | Test log full, diagnostic switches and sensitive field handling. |
The delivery scope and acceptance criteria are determined based on the target environment. Third-party SDK, licenses, laboratories, cloud resources, equipment materials and on-site support are listed separately; when the existing information is insufficient, follow-up work will be determined through interface verification or key function verification.
Frequently Asked Questions
Why is the terminal traffic statistics different from the operator's bill?+
Statistics levels, protocol overhead, retransmissions, billing granularity, and time ranges may vary. It is necessary to record the respective calibers and compare them in the same time window. The effective service load cannot be directly regarded as billing traffic.
4G What information is required for network diagnosis and traffic management development?+
Please give priority to providing module logs, network indicators, business packets, traffic statistics interfaces, billing standards and remote diagnosis permissions. At the same time, the existing implementation, problems encountered, expected changes, and compatible test conditions are explained to facilitate the determination of implementation scope and reproduction methods.
Can it be implemented on existing products?+
You can first evaluate the scope of existing designs and versions that can be changed, retain the verified parts, and determine the interfaces and dependencies that need to be adjusted. This service requires attention: Diagnostic logs are filtered for troubleshooting purposes, and permissions, desensitization, retention, and upload scale should be clearly defined in the design. Existing and new functions must undergo regression testing within the agreed scope after the changes.
Online
Phone
WeChat
Top