4G Connectivity · Custom Development for Enterprises

4G Self-Service Car Wash Control Terminal Development

For car wash equipment manufacturers, self-service operators and equipment platform companies, access timing, measurement and execution equipment, and develop authorized startup, service status, abnormal stop, order verification and maintenance management.

Self-service and shared equipment control systemSoftware, hardware and system integration testingPhased delivery

SERVICE OVERVIEW

Service overview

4G Self-service car wash control terminal development is an enterprise project for "self-service car wash or water equipment execution services on order". Winge Technology carries out the docking of terminal hardware, embedded software and business systems based on existing equipment and target functions, forming design data and programs that can be used for subsequent integration testing, deployment and maintenance.

  • Device and interface access
  • Product business functions
  • Platform and data connection
  • Exception handling and operational constraints

DEVELOPMENT SCOPE

Development services

Development Scope

01

Device and interface access

Connect water pumps, valves, timing measurement and safety status, and define order authorization, service switching, pause and abnormal stop interfaces.

02

Product business functions

Access timing, measurement and execution equipment, and develop authorized startup, service status, abnormal stop, order verification and maintenance management.

03

Platform and data connection

Combined with the business link of order or authorization → local condition check → device execution → 4G result return → order and maintenance management, the device identity, data fields, update time, exception status and result confirmation method are defined.

04

Exception handling and operational constraints

On-site protection and emergency stop are independent of the network; cost calculation, refund and payment settlement are handled by the agreed business platform.

Data and Operational Workflow

Order authorization → Local condition check → Service execution → Timing measurement record → 4G return → Order verification.

The device side, communication side and platform side retain necessary status and logs respectively. Project integration testing is checked with actual equipment data and execution results, and network connection status and business completion status are recorded separately.

Project Inputs

  • Existing device models, interface and wiring diagrams, licensing agreements, data samples and available codes.
  • Business processes and parameters: equipment execution interface, timing measurement, order rules and on-site protection.
  • Target location, operator, SIM/APN, power supply, installation method and equipment size.
  • Existing platform interfaces, user roles, development modules, number of prototypes and planned nodes.

Deliverables and Acceptance

DeliverablesDelivery contentVerification method
product realizationHardware design data, prototypes or existing equipment modification data involved in the project, as well as corresponding firmware and interfacesVerify authorized startup and service switching.
Business integration testingData fields, status definitions, platform adaptation procedures and business integration testing recordsCheck timing, metering and closing data.
Version and test dataTarget hardware and software versions, build or deployment instructions, parameter configurations and test logsTest equipment failures, network outages and duplicate order commands.

First confirm the scope and key functions, then complete prototype or software development, system integration testing and stage acceptance. The acceptance conditions list the prototype, version, environment, duration and passing threshold; source code, design documents, third-party licenses, materials, traffic, cloud resources and on-site work are agreed separately.

Frequently Asked Questions

What happens to ongoing services when the network is down?

The continuation, time-limited completion, or stop strategy should be determined based on the equipment process and order rules. The terminal saves the execution record and checks it with the platform after restoring the network. On-site protection still runs according to local logic.

Can I only entrust some functions of the self-service car wash control terminal?

The device interface, terminal program, 4G communication and platform integration testing can be split based on the existing R&D foundation. Please provide existing information and target boundaries, first check "equipment execution interface, timing measurement, order rules and on-site protection", and then clarify the deliverables and interface responsibilities of each module.

How are costs and cycle time assessed?

Split the workload based on target devices, interfaces, existing data, and verification criteria. This project focuses on checking the equipment execution interface, timing and measurement, order rules and on-site protection; when prototypes, on-site integration testing or third-party platform cooperation are required, the corresponding costs, prerequisites and nodes will be listed separately.

PROJECT DELIVERY

From requirements to delivery

01

Requirements review

Confirm business goals, existing devices and systems, interfaces and deployment conditions.

02

Scope and solution

Review technical dependencies and agree responsibilities, deliverables and acceptance methods.

03

Development and integration

Implement the agreed scope and integrate with the target devices and systems.

04

Testing and issue resolution

Run agreed test cases and record issues, fixes and regression results.

05

Handover and acceptance

Deliver the agreed work, build configurations, interface documentation and test records.

06

Maintenance and changes

Handle version maintenance and assess new requirements within the agreed support scope.

Define Devices, Interfaces and Deliverables

Please provide the target functions, existing equipment information and usage environment of the 4G self-service car wash control terminal, focusing on the equipment execution interface, timing measurement, order rules and on-site protection, so as to facilitate the determination of the technical scope and stage delivery arrangements.

Discuss 4G Development
Online
Phone
13910119357
WeChat
WhatsApp
Winge Technology WhatsApp QR code Scan or click to contact us
Top